Difference between revisions of "EGI-Engage:AMB-2015-09-08"
Jump to navigation
Jump to search
(Created page with "{{Template:EGI-Engage menubar}} {{TOC_right}} = Activity Reports = == WP1 (NA1) (Yannick Legre) == Dissamination reports === Milestones &...") |
|||
(23 intermediate revisions by 11 users not shown) | |||
Line 23: | Line 23: | ||
=== Task NA2.1 Communication and Dissemination === | === Task NA2.1 Communication and Dissemination === | ||
* Reviewing applications for the Communications Officer job opening | |||
* Preparing the online programme of the CF2015 | |||
=== Task NA2.2 Strategy, Business Development and Exploitation === | === Task NA2.2 Strategy, Business Development and Exploitation === | ||
Line 32: | Line 34: | ||
=== Milestones & Deliverables === | === Milestones & Deliverables === | ||
* D3.1 Technical design of the new Accounting Portal and implementation plan (https://documents.egi.eu/document/2545) --> to EC | |||
=== Task JRA1.1 Authentication and Authorisation Infrastructure === | === Task JRA1.1 Authentication and Authorisation Infrastructure === | ||
Line 40: | Line 42: | ||
=== Task JRA1.3 Accounting === | === Task JRA1.3 Accounting === | ||
* Fixed SSM and DBloader for storage records. | |||
* Reconfigured DBLoader logging to minimize disk use. | |||
* Deleted stale DB recors | |||
* Fixed site tree for Tier2 views. | |||
* Fixed problems with DH cryptography in REBUS service. | |||
* Compiled Intermediate report metrics for WP6 activities. | |||
* Added third level to Cloud Tier2 view | |||
* Final revision of the deliverable D3.1 "Technical Design of the New Accounting Portal" | |||
* FedCloud meetings | |||
=== Task JRA1.4 Operations Tools === | === Task JRA1.4 Operations Tools === | ||
====GOCDB==== | |||
* Presented a proposal to JISC/REFEDS legal guys to hash the ePPN using a project-owned secret salt as a way to securely re-publish and correlate attributes/IDs within a project. Those legal guys have no concerns and want to document this within UKAMF/REFEDS. Needs agreement from EGI [https://wiki.egi.eu/wiki/GOCDB/notifications details] | |||
* Working on role logic to allow different roles per-project in a single Gocdb (v5.5). | |||
=== Task JRA1.5 Resource Allocation – e-GRANT === | === Task JRA1.5 Resource Allocation – e-GRANT === | ||
*initial development of possibility to request for more than one type of 'Other' type of VM (cloud resources) | |||
*testing phase of negotiation process in p4u instance | |||
== WP4 (JRA2) (Tiziana Ferrari) == | == WP4 (JRA2) (Tiziana Ferrari) == | ||
Line 51: | Line 68: | ||
=== Task JRA2.1 Federated Open Data === | === Task JRA2.1 Federated Open Data === | ||
* Preparation the system architecture based on requirements analysis of the communities. | |||
* Preparation of the first milestone report | |||
=== Task JRA2.2 Federated Cloud === | === Task JRA2.2 Federated Cloud === | ||
* Preparing first release of "ooi". | |||
* Continuing with the integration of Keystone-VOMS and rOCCI in UMD. | |||
* Evaluating initial implementation of VM templates/flavors profile in "ooi": https://rt.egi.eu/rt/Ticket/Display.html?id=8768 | |||
* Started implementation of VO information publishing for cloud resources: https://rt.egi.eu/rt/Ticket/Display.html?id=9095 | |||
* Ongoing discussions within OGF OCCI WG regarding the VM resize extension. | |||
=== Task JRA2.3 e-Infrastructures Integration === | === Task JRA2.3 e-Infrastructures Integration === | ||
* Finalising CANFAR Roadmap deliverable (D4.1) | |||
* OpenStack integration: | |||
** monitoring probe now available | |||
* Ongoing integration of KISTI resources: | |||
** OCCI and AAI now available | |||
** Reconfiguring site to install neutron instead of nova-network. | |||
=== Task JRA2.4 Accelerated Computing === | === Task JRA2.4 Accelerated Computing === | ||
* Implemented the parser on CREAM core for the new JDL attributes GPUNumber and GPUMode | |||
* Tested AMBER remote job submission to the new CREAM prototype installed on CIRMMP cluster, some troubleshooting is underway | |||
* The managers of STFC/Emerald (LSF8 based GPU cluster, via Stuart Pullinger), IFCA (SGE based GPU cluster, via Pablo Orviz) and INFN-CNAF (LSF9 based GPU cluster, via Stefano Dal Pra) have been contacted if they can provide a testing instance for extending CREAM GPU support to LSF and SGE LRMSes. Other volunteer sites are welcome, especially a SLURM based GPU cluster. Can AMB spread the word among the EGI Community service providers? | |||
* Starting process of integration of the cloud site to EGI FedCloud | |||
** Keystone VOMS support being integrated | |||
** OCCI in preparation, installation planned in September | |||
== WP5 (SA1) (Peter Solagna) == | == WP5 (SA1) (Peter Solagna) == | ||
Line 73: | Line 112: | ||
=== Milestones & Deliverables === | === Milestones & Deliverables === | ||
* Working on metrics for 1st intermediate report | |||
=== Task SA2.1 Training === | === Task SA2.1 Training === | ||
* Preparing a new wiki page about training services, resources, activities. Link this to the main Wiki (in the Engagement and user support section) | |||
* Start organising an SA2.1 teleconference for later in September | |||
=== Task SA2.2 Technical User Support === | === Task SA2.2 Technical User Support === | ||
* Preparation of a summary document about engagement cases and progress for the next council meeting and the engagement meeting. | |||
* Support for pan-cancer, HBP, BILS. | |||
=== Task SA2.3 ELIXIR === | === Task SA2.3 ELIXIR === | ||
* Teleconference meeting between EGI and EBI about use of the ELIXIR compute platform for data replication. | |||
* ELIXIR CC partners were focused on kickoff meeting of ELIXIR EXCELERATE | |||
* Kickoff meeting for the CC will be organised soon | |||
=== Task SA2.4 BBMRI === | === Task SA2.4 BBMRI === | ||
* Partners were focussed on kick-off of H2020 project. To organise a CC kickoff meeting soon. | |||
* Discssing potential contribution to event in Lund: BIOBANKS AND BIG DATA: POSSIBILITIES AND CHALLENGES (https://wiki.egi.eu/wiki/Community_events) | |||
=== Task SA2.5 MoBrain === | === Task SA2.5 MoBrain === | ||
* Involved in PhenoMeNal | |||
* Preparing survey in MoBrian to collect further requirements | |||
* Involved in WestLife VRE project. Kick-off in November, but first meeting only in January 2016 | |||
* MoBrain meeting - f2f at BMB Symposium? + demo at EGI booth? - To discuss | |||
* MoBrain CC teleconference | |||
* Scipion cloud integration discussion | |||
=== Task SA2.6 DARIAH === | === Task SA2.6 DARIAH === | ||
* Questionnaire was published in mid-august, results by end of September | |||
* Establishing a WG is ongoing (reminder needs to be sent) | |||
* Deployment of Bavarian dialect dataset on EGI with gLibrary has started | |||
* Deployment of a DARIAH VO recently done, setup of WS-PGRADE and gLibary with per-user subproxy solution ongoing | |||
* Recently a conference talk in Japan, 2 presentations submitted to EGI community forum | |||
* Training will start later | |||
=== Task SA2.7 LifeWatch === | === Task SA2.7 LifeWatch === | ||
* Had f2f CC meeting last week. Minutes will be available soon on the agenda page | |||
* Conference in Rome in 2 weeks (with LifeWatch stand): http://www.ecologyatinterface.eu/index.php/component/content/article?id=2 --> Add to event table | |||
* Submitted several abstract to the EGI Community | |||
=== Task SA2.8 EISCAT_3D === | === Task SA2.8 EISCAT_3D === | ||
* Discussions with EUDAT about identifiers. We will go for an EUDAT pilot. | |||
* Meeting planned with ICOS to discuss how we could implement PID solution | |||
* Work is ongoing on the portal (SNIC as developer has started working on a scatch) | |||
* EISCAT Community Meeting in South Africa next week. We will present the portal design specification | |||
=== Task SA2.9 EPOS === | === Task SA2.9 EPOS === | ||
* Developing two use cases (one on AAI, one on comp. seismology on cloud) - see 1-pager on this meeting agenda | |||
* Trying to elaborate the use cases and allocate experts from the CC to the different tasks | |||
* EPOS H2020 project kick-off meeting on 5th of October | |||
=== Task SA2.10 Disaster Mitigation === | === Task SA2.10 Disaster Mitigation === | ||
* Working on a document that provides a summary of use cases the CC members focus on, including plans for implementation | |||
[[Category:EGI-Engage]] | [[Category:EGI-Engage]] |
Latest revision as of 10:23, 8 September 2015
Activity Reports
WP1 (NA1) (Yannick Legre)
Milestones & Deliverables
Task NA1.1 Administrative and Financial Management
Task NA1.2 Technical Management
Task NA1.3 Quality and Risk Management
WP2 (NA2) (Sergio Andreozzi)
Milestones & Deliverables
Task NA2.1 Communication and Dissemination
- Reviewing applications for the Communications Officer job opening
- Preparing the online programme of the CF2015
Task NA2.2 Strategy, Business Development and Exploitation
Task NA2.3 SME/Industry Engagement and Big Data Value Chain
WP3 (JRA1) (Diego Scardaci)
Milestones & Deliverables
- D3.1 Technical design of the new Accounting Portal and implementation plan (https://documents.egi.eu/document/2545) --> to EC
Task JRA1.1 Authentication and Authorisation Infrastructure
Task JRA1.2 Service Registry and Marketplace
Task JRA1.3 Accounting
- Fixed SSM and DBloader for storage records.
- Reconfigured DBLoader logging to minimize disk use.
- Deleted stale DB recors
- Fixed site tree for Tier2 views.
- Fixed problems with DH cryptography in REBUS service.
- Compiled Intermediate report metrics for WP6 activities.
- Added third level to Cloud Tier2 view
- Final revision of the deliverable D3.1 "Technical Design of the New Accounting Portal"
- FedCloud meetings
Task JRA1.4 Operations Tools
GOCDB
- Presented a proposal to JISC/REFEDS legal guys to hash the ePPN using a project-owned secret salt as a way to securely re-publish and correlate attributes/IDs within a project. Those legal guys have no concerns and want to document this within UKAMF/REFEDS. Needs agreement from EGI details
- Working on role logic to allow different roles per-project in a single Gocdb (v5.5).
Task JRA1.5 Resource Allocation – e-GRANT
- initial development of possibility to request for more than one type of 'Other' type of VM (cloud resources)
- testing phase of negotiation process in p4u instance
WP4 (JRA2) (Tiziana Ferrari)
Milestones & Deliverables
Task JRA2.1 Federated Open Data
- Preparation the system architecture based on requirements analysis of the communities.
- Preparation of the first milestone report
Task JRA2.2 Federated Cloud
- Preparing first release of "ooi".
- Continuing with the integration of Keystone-VOMS and rOCCI in UMD.
- Evaluating initial implementation of VM templates/flavors profile in "ooi": https://rt.egi.eu/rt/Ticket/Display.html?id=8768
- Started implementation of VO information publishing for cloud resources: https://rt.egi.eu/rt/Ticket/Display.html?id=9095
- Ongoing discussions within OGF OCCI WG regarding the VM resize extension.
Task JRA2.3 e-Infrastructures Integration
- Finalising CANFAR Roadmap deliverable (D4.1)
- OpenStack integration:
- monitoring probe now available
- Ongoing integration of KISTI resources:
- OCCI and AAI now available
- Reconfiguring site to install neutron instead of nova-network.
Task JRA2.4 Accelerated Computing
- Implemented the parser on CREAM core for the new JDL attributes GPUNumber and GPUMode
- Tested AMBER remote job submission to the new CREAM prototype installed on CIRMMP cluster, some troubleshooting is underway
- The managers of STFC/Emerald (LSF8 based GPU cluster, via Stuart Pullinger), IFCA (SGE based GPU cluster, via Pablo Orviz) and INFN-CNAF (LSF9 based GPU cluster, via Stefano Dal Pra) have been contacted if they can provide a testing instance for extending CREAM GPU support to LSF and SGE LRMSes. Other volunteer sites are welcome, especially a SLURM based GPU cluster. Can AMB spread the word among the EGI Community service providers?
- Starting process of integration of the cloud site to EGI FedCloud
- Keystone VOMS support being integrated
- OCCI in preparation, installation planned in September
WP5 (SA1) (Peter Solagna)
Milestones & Deliverables
Task SA1.1 Operations Coordination
Task SA1.2 Development of Security Operations
Task SA1.3 Integration, Deployment of Grid and Cloud Platforms
WP6 (SA2) (Gergely Sipos)
Milestones & Deliverables
- Working on metrics for 1st intermediate report
Task SA2.1 Training
- Preparing a new wiki page about training services, resources, activities. Link this to the main Wiki (in the Engagement and user support section)
- Start organising an SA2.1 teleconference for later in September
Task SA2.2 Technical User Support
- Preparation of a summary document about engagement cases and progress for the next council meeting and the engagement meeting.
- Support for pan-cancer, HBP, BILS.
Task SA2.3 ELIXIR
- Teleconference meeting between EGI and EBI about use of the ELIXIR compute platform for data replication.
- ELIXIR CC partners were focused on kickoff meeting of ELIXIR EXCELERATE
- Kickoff meeting for the CC will be organised soon
Task SA2.4 BBMRI
- Partners were focussed on kick-off of H2020 project. To organise a CC kickoff meeting soon.
- Discssing potential contribution to event in Lund: BIOBANKS AND BIG DATA: POSSIBILITIES AND CHALLENGES (https://wiki.egi.eu/wiki/Community_events)
Task SA2.5 MoBrain
- Involved in PhenoMeNal
- Preparing survey in MoBrian to collect further requirements
- Involved in WestLife VRE project. Kick-off in November, but first meeting only in January 2016
- MoBrain meeting - f2f at BMB Symposium? + demo at EGI booth? - To discuss
- MoBrain CC teleconference
- Scipion cloud integration discussion
Task SA2.6 DARIAH
- Questionnaire was published in mid-august, results by end of September
- Establishing a WG is ongoing (reminder needs to be sent)
- Deployment of Bavarian dialect dataset on EGI with gLibrary has started
- Deployment of a DARIAH VO recently done, setup of WS-PGRADE and gLibary with per-user subproxy solution ongoing
- Recently a conference talk in Japan, 2 presentations submitted to EGI community forum
- Training will start later
Task SA2.7 LifeWatch
- Had f2f CC meeting last week. Minutes will be available soon on the agenda page
- Conference in Rome in 2 weeks (with LifeWatch stand): http://www.ecologyatinterface.eu/index.php/component/content/article?id=2 --> Add to event table
- Submitted several abstract to the EGI Community
Task SA2.8 EISCAT_3D
- Discussions with EUDAT about identifiers. We will go for an EUDAT pilot.
- Meeting planned with ICOS to discuss how we could implement PID solution
- Work is ongoing on the portal (SNIC as developer has started working on a scatch)
- EISCAT Community Meeting in South Africa next week. We will present the portal design specification
Task SA2.9 EPOS
- Developing two use cases (one on AAI, one on comp. seismology on cloud) - see 1-pager on this meeting agenda
- Trying to elaborate the use cases and allocate experts from the CC to the different tasks
- EPOS H2020 project kick-off meeting on 5th of October
Task SA2.10 Disaster Mitigation
- Working on a document that provides a summary of use cases the CC members focus on, including plans for implementation