Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "Agenda-30-05-2011"

From EGIWiki
Jump to navigation Jump to search
Line 1: Line 1:
{{Template:Op menubar}}  
{{Template:Op menubar}}  


= Detailed agenda: Grid Operations Meeting 30 May 2011 h14:00 Amsterdam time =
= Detailed agenda: Grid Operations Meeting 30 May 2011 h14:00 Amsterdam time =
[https://www.egi.eu/indico/getFile.py/access?resId=0&materialId=1&confId=488 EVO details]
 
[https://www.egi.eu/indico/conferenceDisplay.py?confId=488 Indico page]
[https://www.egi.eu/indico/getFile.py/access?resId=0&materialId=1&confId=488 EVO details] [https://www.egi.eu/indico/conferenceDisplay.py?confId=488 Indico page]  


=== 1. Middleware releases and staged rollout  ===
=== 1. Middleware releases and staged rollout  ===
Line 13: Line 13:
Current ongoing points in the integration task forces:  
Current ongoing points in the integration task forces:  


=====UNICORE:=====
===== UNICORE: =====
* Our GOCDB requirement has been fixed and seems to work! https://goc.gridops.org/portal/index.php?Page_Type=View_Object&object_id=22973&grid_id=0
 
* Doodle Poll for next meeting will be opened this week
*Our GOCDB requirement has been fixed and seems to work! https://goc.gridops.org/portal/index.php?Page_Type=View_Object&object_id=22973&grid_id=0  
* UNICORE summit http://www.unicore.eu/summit/2011/ at Nicolaus Copernicus University, Torun, Poland, on July 7th - 8th
*Doodle Poll for next meeting will be opened this week  
*UNICORE summit http://www.unicore.eu/summit/2011/ at Nicolaus Copernicus University, Torun, Poland, on July 7th - 8th
 
===== Globus: =====
 
*We had a dedicated meeting on accounting during the First European Globus Community Forum EGCF1 in Munich last week:
 
https://www.egi.eu/indico/materialDisplay.py?materialId=minutes&confId=485 It was short and effective. Outcome and summary:
 
:*Parts of the original source of Grid-SAFE were missing with the transfer to SourceForge, should be RUS compliant and will be recovered and then adapted to follow newer RUPI standard as well.
:*Common agreement to support the RUS standard interface and long-term vision to use it in all supported systems.
:*:Non-standard prototype short term solution used in Manchester: NGS (XML document based) UR RUS clients all publishing to Manchester which takes those URs and runs an ActiveMQ Publisher to send them to the central APEL repository.
:*IGE will actively take part in the UR fields analysis and discussion of the EMI ComputeAccounting working group.
:*IGE is taking over support for Grid-SAFE, possibly under the wings of SSI
:*Transport mechanism used in Grid-SAFE is SOAP over https.


=====Globus:=====
*There is a doodlepoll for a next meeting end of week22, week 23:
* We had a dedicated meeting on accounting during the First European Globus Community Forum EGCF1 in Munich last week:
 
https://www.egi.eu/indico/materialDisplay.py?materialId=minutes&confId=485
http://www.doodle.com/mtdtz23b2xfgp4kf  
It was short and effective.
 
Outcome and summary:
*Very important and urgent for UMD to know which Operation Systems will be used in production for the Globus resources in the future! Little feedback so far (from Netherlands and UK) on the small informal survey over the noc-managers list. Would at least like to see answers from the other "main suspects" like Croatia, Germany, Romania and Poland as well.
:* Parts of the original source of Grid-SAFE were missing with the transfer to SourceForge, should be RUS compliant and will be recovered and then adapted to follow newer RUPI standard as well.
:* Common agreement to support the RUS standard interface and long-term vision to use it in all supported systems.
:*:  Non-standard prototype short term solution used in Manchester: NGS (XML document based) UR RUS clients all publishing to Manchester which takes those URs and runs an ActiveMQ Publisher to send them to the central APEL repository.
:* IGE will actively take part in the UR fields analysis and discussion of the EMI ComputeAccounting working group.
:* IGE is taking over support for Grid-SAFE, possibly under the wings of SSI
:* Transport mechanism used in Grid-SAFE is SOAP over https.
* There is a doodlepoll for a next meeting end of week22, week 23:
http://www.doodle.com/mtdtz23b2xfgp4kf
* Very important and urgent for UMD to know which Operation Systems will be used in production for the Globus resources in the future! Little feedback so far (from Netherlands and UK) on the small informal survey over the noc-managers list. Would at least like to see answers from the other "main suspects" like Croatia, Germany, Romania and Poland as well.


=== 2. Operational Issues  ===
=== 2. Operational Issues  ===
==== 2.2 Current active surveys and activities====
* EGI survey on top-BDII deployment scenario
** Survey sent to NGIs through a broadcast and a mail to LCG_ROLLOUT
** Deadline: '''30th June 2011'''
** Currently 13 answers submitted (36 visits)


* Batch systems current deployment scenario in the EGI infrastructure
==== 2.2 Current active surveys and activities ====
** Directly sent to Site Managers
 
** Deadline: '''30th June 2011'''
*EGI survey on top-BDII deployment scenario
** Currently ~190 answers submitted
**Survey sent to NGIs through a broadcast and a mail to LCG_ROLLOUT
**Deadline: '''30th June 2011'''
**Currently 13 answers submitted (36 visits)
 
*Batch systems current deployment scenario in the EGI infrastructure  
**Directly sent to Site Managers  
**Deadline: '''30th June 2011'''  
**Currently ~190 answers submitted


* Invitation to submit requirements
*Invitation to submit requirements  
** Sent to NGIs and Site Managers
**Sent to NGIs and Site Managers  
** Deadline: '''30th June 2011'''
**Deadline: '''30th June 2011'''  
** [[OMB Requirements|Requirements]] collected by EGI ''before'' this campaign
**[[OMB Requirements|Requirements]] collected by EGI ''before'' this campaign  
** [[Mw-requirements.html|Instructions]] slightly modified to include the direct submission from Site Managers
**[[Mw-requirements.html|Instructions]] slightly modified to include the direct submission from Site Managers


=== 3. AOB  ===
=== 3. AOB  ===


[[Category:GridOpsMeeting]]
[[Category:GridOpsMeeting]]

Revision as of 13:35, 30 May 2011

Main EGI.eu operations services Support Documentation Tools Activities Performance Technology Catch-all Services Resource Allocation Security



Detailed agenda: Grid Operations Meeting 30 May 2011 h14:00 Amsterdam time

EVO details Indico page

1. Middleware releases and staged rollout

1.2. Staged Rollout (Mario)

1.3 Interoperability (Michaela)

Current ongoing points in the integration task forces:

UNICORE:
Globus:
  • We had a dedicated meeting on accounting during the First European Globus Community Forum EGCF1 in Munich last week:

https://www.egi.eu/indico/materialDisplay.py?materialId=minutes&confId=485 It was short and effective. Outcome and summary:

  • Parts of the original source of Grid-SAFE were missing with the transfer to SourceForge, should be RUS compliant and will be recovered and then adapted to follow newer RUPI standard as well.
  • Common agreement to support the RUS standard interface and long-term vision to use it in all supported systems.
    Non-standard prototype short term solution used in Manchester: NGS (XML document based) UR RUS clients all publishing to Manchester which takes those URs and runs an ActiveMQ Publisher to send them to the central APEL repository.
  • IGE will actively take part in the UR fields analysis and discussion of the EMI ComputeAccounting working group.
  • IGE is taking over support for Grid-SAFE, possibly under the wings of SSI
  • Transport mechanism used in Grid-SAFE is SOAP over https.
  • There is a doodlepoll for a next meeting end of week22, week 23:

http://www.doodle.com/mtdtz23b2xfgp4kf

  • Very important and urgent for UMD to know which Operation Systems will be used in production for the Globus resources in the future! Little feedback so far (from Netherlands and UK) on the small informal survey over the noc-managers list. Would at least like to see answers from the other "main suspects" like Croatia, Germany, Romania and Poland as well.

2. Operational Issues

2.2 Current active surveys and activities

  • EGI survey on top-BDII deployment scenario
    • Survey sent to NGIs through a broadcast and a mail to LCG_ROLLOUT
    • Deadline: 30th June 2011
    • Currently 13 answers submitted (36 visits)
  • Batch systems current deployment scenario in the EGI infrastructure
    • Directly sent to Site Managers
    • Deadline: 30th June 2011
    • Currently ~190 answers submitted
  • Invitation to submit requirements
    • Sent to NGIs and Site Managers
    • Deadline: 30th June 2011
    • Requirements collected by EGI before this campaign
    • Instructions slightly modified to include the direct submission from Site Managers

3. AOB