Agenda-30-05-2011

From EGIWiki
Jump to: navigation, search
Main EGI.eu operations services Support Documentation Tools Activities Performance Technology Catch-all Services Resource Allocation Security

Detailed agenda: Grid Operations Meeting 30 May 2011 14h00 Amsterdam time

EVO direct link EVO details Indico page

1. Middleware releases and staged rollout

1.1. EMI/UMD current status

1.2. Staged Rollout (Mario)

There are several gLite 3.1 and 3.2 components in staged rollout:

gLite 3.1:

gLite 3.2:


1.3 Interoperability (Michaela)

Current ongoing points in the integration task forces:

UNICORE:
Globus:

https://www.egi.eu/indico/materialDisplay.py?materialId=minutes&confId=485 It was short and effective. Outcome and summary:

  • Parts of the original source of Grid-SAFE were missing with the transfer to SourceForge, should be RUS compliant and will be recovered and then adapted to follow newer RUPI standard as well.
  • Common agreement to support the RUS standard interface and long-term vision to use it in all supported systems.
    Non-standard prototype short term solution used in Manchester: NGS (XML document based) UR RUS clients all publishing to Manchester which takes those URs and runs an ActiveMQ Publisher to send them to the central APEL repository.
  • IGE will actively take part in the UR fields analysis and discussion of the EMI ComputeAccounting working group.
  • IGE is taking over support for Grid-SAFE, possibly under the wings of SSI
  • Transport mechanism used in Grid-SAFE is SOAP over https.

http://www.doodle.com/mtdtz23b2xfgp4kf


2. Operational Issues

2.2 Current active surveys and actions

2.3 Proposal for jobs workdir issue solution

Second document with a tentative proposal to be forwarded to the Technology Providers. Document

3. AOB

Personal tools
Namespaces
Variants
Actions
Navigation
Toolbox
Print/export