Difference between revisions of "Agenda-22-08-2011"
Jump to navigation
Jump to search
(6 intermediate revisions by 3 users not shown) | |||
Line 1: | Line 1: | ||
{{Template:Op menubar}} | {{Template:Op menubar}} | ||
[[Category:Grid Operations Meetings]] | |||
= Detailed agenda: Grid Operations Meeting | = Detailed agenda: Grid Operations Meeting 22 August 2011 11h00 Amsterdam time = | ||
{| | {| | ||
Line 14: | Line 15: | ||
== 1. Middleware releases and staged rollout == | == 1. Middleware releases and staged rollout == | ||
=== 1.1 EMI-1 release status (Cristina) | === 1.1 EMI-1 release status (Cristina) === | ||
* [https://www.egi.eu/indico/getFile.py/access?contribId=0&resId=0&materialId=slides&confId=556 PDF slides] | |||
* [https://www.egi.eu/indico/getFile.py/access?contribId=0&resId=1&materialId=slides&confId=556 ODP slides] | |||
=== 1.2 Staged Rollout (Mario) === | === 1.2 Staged Rollout (Mario) === | ||
Line 47: | Line 50: | ||
*dCache 1.9.12-2 : Staged rollout done last week and already set to be included in the UMD release. | *dCache 1.9.12-2 : Staged rollout done last week and already set to be included in the UMD release. | ||
WMS 3.3.3 is due to be released in EMI update 6 on the 1st of September. This is considered an urgent update and will get high priority in verification and staged rollout in order to be a candidate to inclusion in UMD1.2 . | WMS 3.3.3 is due to be released in EMI update 6 on the 1st of September. This is considered an urgent update and will get high priority in verification and staged rollout in order to be a candidate to inclusion in UMD1.2 . | ||
=== 1.3 Interoperability === | === 1.3 Interoperability === | ||
MS414 status. | |||
==== UNICORE ==== | ==== UNICORE ==== | ||
==== Globus ==== | ==== Globus ==== | ||
Need for a dedicated Globus staged-rollout meeting? | |||
== 2. Operational Issues == | == 2. Operational Issues == | ||
Line 60: | Line 67: | ||
== 3. AOB == | == 3. AOB == | ||
=== 3.1 gLite 3.1 deployed components === | |||
Table of glite3.1 supporting status: [[Agenda-18-07-2011#2.1.1_gLite_3.1_supported_components| Agenda 18 July]] | |||
*Received, so far, assessments from 3 NGIs: no constrains to upgrade to gLite 3.2 or EMI (SL5). | |||
==== 3.3 Next meetings ==== | ==== 3.3 Next meetings ==== | ||
12 September 2011 | 12 September 2011 | ||
Latest revision as of 17:54, 29 November 2012
Main | EGI.eu operations services | Support | Documentation | Tools | Activities | Performance | Technology | Catch-all Services | Resource Allocation | Security |
Detailed agenda: Grid Operations Meeting 22 August 2011 11h00 Amsterdam time
EVO direct link | Pwd: gridops |
EVO details | Indico page |
1. Middleware releases and staged rollout
1.1 EMI-1 release status (Cristina)
1.2 Staged Rollout (Mario)
1.2.1 gLite 3.2
- FTS 2.2.5: no EA has picked it up
1.2.2 UMD1
- In staged rollout (from EMI):
- MPI 1.0.1
- CREAM 1.13.2
- ARC-Clients 1.0.1
- ARC-CE 1.0.1
- In staged rollout (from IGE - Globus 5.0.3):
- MyPROXY
- RLS
- GridFTP
- DefaultSecurity
The following products are under verification and expected during this week to go into staged rollout:
- ARGUS 1.3.1
- ARC-Infosys 1.0.1
- VOMS 2.0.1
- WMS 3.3.2
- AMGA 2.1.2
All the previous products are candidates to be included in the UMD1.2 release due on the 12 of September, plus:
- dCache 1.9.12-2 : Staged rollout done last week and already set to be included in the UMD release.
WMS 3.3.3 is due to be released in EMI update 6 on the 1st of September. This is considered an urgent update and will get high priority in verification and staged rollout in order to be a candidate to inclusion in UMD1.2 .
1.3 Interoperability
MS414 status.
UNICORE
Globus
Need for a dedicated Globus staged-rollout meeting?
2. Operational Issues
2.1 gLite 3.2 critical bugs & patches
3. AOB
3.1 gLite 3.1 deployed components
Table of glite3.1 supporting status: Agenda 18 July
- Received, so far, assessments from 3 NGIs: no constrains to upgrade to gLite 3.2 or EMI (SL5).
3.3 Next meetings
12 September 2011