Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "Agenda-22-08-2011"

From EGIWiki
Jump to navigation Jump to search
 
(10 intermediate revisions by 4 users not shown)
Line 1: Line 1:
{{Template:Op menubar}}  
{{Template:Op menubar}}  
[[Category:Grid Operations Meetings]]


= Detailed agenda: Grid Operations Meeting 01 August 2011 14h00 Amsterdam time  =
= Detailed agenda: Grid Operations Meeting 22 August 2011 11h00 Amsterdam time  =


{|
{|
|-
|-
| [http://evo.caltech.edu/evoNext/koala.jnlp?meeting=MDMaM82I2uDvD29M9iD99D EVO direct link]  
| [http://evo.caltech.edu/evoNext/koala.jnlp?meeting=MeMMMu2229D9Dt9D98Dv9e EVO direct link]  
| Pwd: '''gridops'''<br>
| Pwd: '''gridops'''<br>
|-
|-
| [https://www.egi.eu/indico/getFile.py/access?resId=0&materialId=0&confId=555 EVO details]  
| [https://www.egi.eu/indico/materialDisplay.py?materialId=0&confId=556 EVO details]  
| [https://www.egi.eu/indico/conferenceDisplay.py?confId=555 Indico page]
| [https://www.egi.eu/indico/conferenceDisplay.py?confId=556 Indico page]
|}
|}


== 1. Middleware releases and staged rollout  ==
== 1. Middleware releases and staged rollout  ==


=== 1.1 EMI-1 release status (Cristina) ===
=== 1.1 EMI-1 release status (Cristina) ===
* [https://www.egi.eu/indico/getFile.py/access?contribId=0&resId=0&materialId=slides&confId=556 PDF slides]
* [https://www.egi.eu/indico/getFile.py/access?contribId=0&resId=1&materialId=slides&confId=556 ODP slides]


=== 1.2 Staged Rollout (Mario)  ===
=== 1.2 Staged Rollout (Mario)  ===


==== 1.2.1 gLite 3.2  ====
==== 1.2.1 gLite 3.2  ====
*FTS 2.2.5: no EA has picked it up


==== 1.2.2 UMD1  ====
==== 1.2.2 UMD1  ====
*In staged rollout (from EMI):
**MPI 1.0.1
**CREAM 1.13.2
**ARC-Clients 1.0.1
**ARC-CE 1.0.1
*In staged rollout (from IGE - Globus 5.0.3):
**MyPROXY
**RLS
**GridFTP
**DefaultSecurity
The following products are under verification and expected during this week to go into staged rollout:
*ARGUS 1.3.1
*ARC-Infosys 1.0.1
*VOMS 2.0.1
*WMS 3.3.2
*AMGA 2.1.2
All the previous products are candidates to be included in the UMD1.2 release due on the 12 of September, plus:
*dCache 1.9.12-2&nbsp;: Staged rollout done last week and already set to be included in the UMD release.
WMS 3.3.3 is due to be released in EMI update 6 on the 1st of September. This is considered an urgent update and will get high priority in verification and staged rollout in order to be a candidate to inclusion in UMD1.2 .


=== 1.3 Interoperability  ===
=== 1.3 Interoperability  ===
MS414 status.


==== UNICORE  ====
==== UNICORE  ====


==== Globus  ====
==== Globus  ====
Need for a dedicated Globus staged-rollout meeting?


== 2. Operational Issues  ==
== 2. Operational Issues  ==
Line 32: Line 66:
=== 2.1 gLite 3.2 critical bugs &amp; patches  ===
=== 2.1 gLite 3.2 critical bugs &amp; patches  ===


== 3. AOB  ==
=== 3.1 gLite 3.1 deployed components  ===
Table of glite3.1 supporting status: [[Agenda-18-07-2011#2.1.1_gLite_3.1_supported_components| Agenda 18 July]]


== 3. AOB  ==
*Received, so far, assessments from 3 NGIs: no constrains to upgrade to gLite 3.2 or EMI (SL5).


==== 3.3 Next meetings  ====
==== 3.3 Next meetings  ====


12 September 2011
12 September 2011
[[Category:GridOpsMeeting]]

Latest revision as of 17:54, 29 November 2012

Main EGI.eu operations services Support Documentation Tools Activities Performance Technology Catch-all Services Resource Allocation Security

Detailed agenda: Grid Operations Meeting 22 August 2011 11h00 Amsterdam time

EVO direct link Pwd: gridops
EVO details Indico page

1. Middleware releases and staged rollout

1.1 EMI-1 release status (Cristina)

1.2 Staged Rollout (Mario)

1.2.1 gLite 3.2

  • FTS 2.2.5: no EA has picked it up

1.2.2 UMD1

  • In staged rollout (from EMI):
    • MPI 1.0.1
    • CREAM 1.13.2
    • ARC-Clients 1.0.1
    • ARC-CE 1.0.1
  • In staged rollout (from IGE - Globus 5.0.3):
    • MyPROXY
    • RLS
    • GridFTP
    • DefaultSecurity

The following products are under verification and expected during this week to go into staged rollout:

  • ARGUS 1.3.1
  • ARC-Infosys 1.0.1
  • VOMS 2.0.1
  • WMS 3.3.2
  • AMGA 2.1.2

All the previous products are candidates to be included in the UMD1.2 release due on the 12 of September, plus:

  • dCache 1.9.12-2 : Staged rollout done last week and already set to be included in the UMD release.

WMS 3.3.3 is due to be released in EMI update 6 on the 1st of September. This is considered an urgent update and will get high priority in verification and staged rollout in order to be a candidate to inclusion in UMD1.2 .

1.3 Interoperability

MS414 status.

UNICORE

Globus

Need for a dedicated Globus staged-rollout meeting?

2. Operational Issues

2.1 gLite 3.2 critical bugs & patches

3. AOB

3.1 gLite 3.1 deployed components

Table of glite3.1 supporting status: Agenda 18 July

  • Received, so far, assessments from 3 NGIs: no constrains to upgrade to gLite 3.2 or EMI (SL5).

3.3 Next meetings

12 September 2011