Difference between revisions of "Agenda-22-08-2011"
Jump to navigation
Jump to search
Line 60: | Line 60: | ||
== 3. AOB == | == 3. AOB == | ||
=== 3.1 gLite 3.1 deployed components === | |||
Table of glite3.1 supporting status: [https://wiki.egi.eu/wiki/Agenda-18-07-2011#2.1.1_gLite_3.1_supported_components Agenda 18 July] | |||
*Received, so far, assessment from 3 NGIs: no constrains to upgrade to gLite 3.2 or EMI (SL5). | |||
==== 3.3 Next meetings ==== | ==== 3.3 Next meetings ==== |
Revision as of 09:13, 22 August 2011
Main | EGI.eu operations services | Support | Documentation | Tools | Activities | Performance | Technology | Catch-all Services | Resource Allocation | Security |
Detailed agenda: Grid Operations Meeting 22 August 2011 11h00 Amsterdam time
EVO direct link | Pwd: gridops |
EVO details | Indico page |
1. Middleware releases and staged rollout
1.1 EMI-1 release status (Cristina)
1.2 Staged Rollout (Mario)
1.2.1 gLite 3.2
- FTS 2.2.5: no EA has picked it up
1.2.2 UMD1
- In staged rollout (from EMI):
- MPI 1.0.1
- CREAM 1.13.2
- ARC-Clients 1.0.1
- ARC-CE 1.0.1
- In staged rollout (from IGE - Globus 5.0.3):
- MyPROXY
- RLS
- GridFTP
- DefaultSecurity
The following products are under verification and expected during this week to go into staged rollout:
- ARGUS 1.3.1
- ARC-Infosys 1.0.1
- VOMS 2.0.1
- WMS 3.3.2
- AMGA 2.1.2
All the previous products are candidates to be included in the UMD1.2 release due on the 12 of September, plus:
- dCache 1.9.12-2 : Staged rollout done last week and already set to be included in the UMD release.
WMS 3.3.3 is due to be released in EMI update 6 on the 1st of September. This is considered an urgent update and will get high priority in verification and staged rollout in order to be a candidate to inclusion in UMD1.2 .
1.3 Interoperability
UNICORE
Globus
2. Operational Issues
2.1 gLite 3.2 critical bugs & patches
3. AOB
3.1 gLite 3.1 deployed components
Table of glite3.1 supporting status: Agenda 18 July
- Received, so far, assessment from 3 NGIs: no constrains to upgrade to gLite 3.2 or EMI (SL5).
3.3 Next meetings
12 September 2011