Difference between revisions of "EGI-Engage:Deliverables and Milestones"
Jump to navigation
Jump to search
Deliverables
Milestones
Line 70: | Line 70: | ||
|- | |- | ||
! [https://rt.egi.eu/rt/Ticket/Display.html?id=8074 D 2.4] | ! [https://rt.egi.eu/rt/Ticket/Display.html?id=8074 D 2.4] | ||
| Data Management Plan | | [https://documents.egi.eu/document/2556 Data Management Plan] | ||
| WP 2 | | WP 2 | ||
| EGI.eu | | EGI.eu | ||
Line 79: | Line 79: | ||
|- | |- | ||
! [https://rt.egi.eu/rt/Ticket/Display.html?id=8075 D 3.1] | ! [https://rt.egi.eu/rt/Ticket/Display.html?id=8075 D 3.1] | ||
| [https://documents.egi.eu/document/2545 Technical design of the new Accounting Portal and implementation plan] | | [https://documents.egi.eu/document/2545 Technical design of the new Accounting Portal and implementation plan] | ||
| WP 3 | | WP 3 | ||
| CSIC | | CSIC | ||
Line 715: | Line 715: | ||
<br> | <br> | ||
<br> | <br> | ||
= Milestones<br> = | = Milestones<br> = |
Revision as of 14:51, 21 July 2015
Milestone and Deliverable follow up: RT egi-engage-amb queue (http://go.egi.eu/EngageDel) - access restricted to egi-engage-amb SSO group
Types:
- R: Document, report
- DEM: Demonstrators, pilots, prototypes, plan design
- DEC: Website, press & media actions, events
- OTHER: software, technical diagram etc.
Deliverables
Code | Title | WP(s) | Lead Participant | Type | Dissemination level | Delivery PM | Description |
---|---|---|---|---|---|---|---|
D 1.1 | Quality plan for Period 1 | WP 1 | EGI.eu | R | PU | M03 | defines: (i) quality processes (e.g., deliverable preparation, review preparation and post-review follow-up, activity-specific processes, etc.), (ii) tools and metrics, (iii) Tracking of progresses, (iv) guidelines for distribution of open-source software produced in the project, (v) gender plan for project management and champion programme |
D 2.1 | Communications, Dissemination and Engagement Strategy | WP 2 | EGI.eu | R | PU | M03 | Strategy for the EGI communications, dissemination and engagement activity, and execution plan the first half of the project |
D 2.2 | Master Model for SME engagement | WP 2 | EGI.eu | R | PU | M06 | Procedures and activities for SME identification and engagement, examples of collaboration models, and content to be reused in dissemination |
D 2.3 | Concept of EGI Marketplace | WP 2 | SWING | R | PU | M06 | Analysis for the EGI marketplace and a proposal for conceptual framework, business processes, business models, and recommendations. |
D 2.4 | Data Management Plan | WP 2 | EGI.eu | R | PU | M06 | Plan describing what data the project will generate, whether and how it will be exploited or made accessible for verification and reuse, and how it will be curated and preserved |
D 3.1 | Technical design of the new Accounting Portal and implementation plan | WP 3 | CSIC | R | PU | M06 | Technical design of the new Accounting Portal. This deliverable will include also the user requirements collected and the implementation plan. |
D 4.1 | CANFAR integration roadmap | WP 4 | INFN | R | PU | M06 | This document will capture the work of the comprehensive analysis of the CANFAR Cloud infrastructure and the EGI Federated Cloud infrastructure, and present a resulting implementation roadmap that will guide the implementation work of the subsequent 12 months. It will include the complete list of all basic services and tools needing integration, and a brief per-tool risk analysis. |
D 1.2 | Risk analysis and risk response for Period 1 | WP 1 | EGI.eu | R | PU | M08 | assesses the probability and impact of risks occurring and to determine the appropriate type of risk response; define a contingency plan if re-planning is not sufficient in face of the actual outcome of work performed and impact of related risks |
D 4.2 | VM snapshot support: OCCI extension, final specification | WP 4 | CSIC |
R |
PU | M09 | This deliverable provides the final specification describing the syntax and semantics of operations on the VM management interface to create VM snapshots, designed and expressed as an OCCI extension. |
D 4.3 | Resource template changes: OCCI extension, final specification | WP 4 | CSIC | R | PU | M09 | This deliverable provides the final specification describing the syntax and semantics of operations on the VM management interface to change and attach resource templates to a running VM instance, effectively changing the allocated resources for that instance. |
D 6.1 | Assisted pattern recognition tools integrated with EGI for citizen science | WP 6 | CSIC | DEM | PU | M09 | Tools integrated with the most suitable types of resources from EGI for the LifeWatch community. |
D 6.2 | Data repository for DARIAH | WP 6 | INFN | OTHER | PU | M11 | A digital repository based on gLibrary framework, the DARIAH community’s requirements, and the EGI Federated cloud and grid infrastructures. |
D 2.5 | EGI Governance: Analysis and Recommendations | WP 2 | EGI.eu | R | PU | M12 | Presentation and assessment of the current EGI and EGI.eu governance model and presents a list of recommendations for improvement, the analysis will evaluate the opportunity for adopting the ERIC legal structure for EGI.eu. |
D 2.6 | Report on data sharing policies and legal framework in fishery and marine sciences data sector | WP 2 | FAO | R | PU | M12 | Constraints and requirements given by IPRs and overall legal framework that may hinder the sharing of data among different institutions in the fishery and marine sciences communities; instructions to data providers and consumers on how to describe and access the life-cycle of data and contents; recommendations of how to support legal interoperability and confidentiality of data owners. |
D 2.7 | Market Report on the fishery and marine sciences data sector | WP 2 | Engineering | R | PU | M12 | Market size and potential, map of the actors present in the market, value chains |
D 3.2 | Design of the EGI Service Registry and Marketplace | WP 3 | SWING | R | PU | M12 | Features of the EGI Service Registry and Marketplace and analysis of existing open-source tools and extensions |
D 3.3 | Accounting Repository release | WP 3 | STFC | OTHER | PU | M12 | First release of accounting repository including first year developments. |
D 3.4 | First release of the operational tools | WP 3 | CNRS | OTHER | PU | M12 | First release including first year developments. The release includes: Operations portal, GOCDB, ARGO, messaging infrastructure and security monitoring tools. |
D 4.4 | Relocating VM instances between providers, final specification | WP 4 | CSIC |
DEM |
PU | M12 | This deliverable provides a first implementable draft of defined interactions between federated Cloud resource providers coordinating the relocation of a suspended virtual appliance from one provider to another. |
D 4.5 | Deployment of a gCube release with Federated Cloud support | WP 4 | Engineering | OTHER | PU | M12 | The extensions of gCube to support Federated Cloud resources is deployed in production, and fishery and marine sciences community can start using also resources provided by the EGI Federated cloud. This includes relevant documentation for the users. |
D 6.3 | Production portal for EISCAT_3D | WP 6 | EISCAT | OTHER | PU | M12 | Improved version of the current pilot portal of EISCAT_3D using all the existing EISCAT data in the archive. |
D 6.4 | Fully integrated MoBRAIN web portal | WP 6 | GNUBILA | OTHER | PU | M12 | An entry portal by the MoBrain Competence Centre that integrates and/or gather information form the various web portals relevant to the WeNMR, INSTRUCT and N4U research communities. |
D 6.5 | Final version of Multi-Source Distributed Real-Time Search and Information Retrieval application | WP 6 | GWDG | OTHER | PU | M12 | Real-time search and data retrieval platform developed in the DARIAH Competence Centre based on the SIR software and EGI services. |
D 6.6 | Data flow handler and basic R tools to integrate and process data from Ecological Observatories on EGI | WP 6 | CSIC | DEM | PU | M12 | Tools for Ecological Observatories by the LifeWatch Competence Centre of EGI. |
D 3.6 (3.5) |
Analysis on techniques to manage big data on the EGI accounting system | WP 3 |
STFC |
R |
PU |
M12 |
Techniques to manage big data done in EGI accounting |
D 2.8 |
Communications, Dissemination and Engagement Report and Updated Strategy |
WP 2 |
EGI.eu |
R |
PU |
M12 | Results of communications, dissemination and engagement activities in the first half of the project and outlining the updated plan for the second half. |
D 2.9 |
EGI Sustainability and Business Development Plan |
WP 2 |
EGI.eu |
R |
PU |
M12 | The document presents an update on the strategic planning and evaluation activities of EGI. It also includes the results of the impact assessment and business development activities that aim at ensuring growth and sustainability of EGI. |
D 5.1 |
Report on the evolution of the EGI Operations |
WP 5 |
EGI.eu |
R |
PU |
M12 |
Report on the evolution roadmap for the second period of the project |
D 5.2 |
Platforms for the long-tail of science |
WP 5 |
CNR |
R |
PU |
M12 |
Report on the services for the long-tail of science made available during the project, including the feedback from users and resource providers about their use. |
D 4.6 | e-Infrastructures integration report | WP 4 | INFN | R | PU | M12 | Report of integration activities involving D4Science, the pilot activities conducted with the EUDAT service providers and accelerated computing. |
D 6.7 | Implementation and evaluation of AMBER and/or GROMACS | WP 6 | CIRMMP | R | PU | M13 | Evaluation of the deployment of AMBER and/or GROMACS on a GPGPU testbed of EGI by the MoBrain Competence Centre. |
D 1.3 | Report of quality status and quality plan for Period 2 | WP 1 | EGI.eu | R | PU | M14 | defines: (i) quality processes (e.g., deliverable preparation, review preparation and post-review follow-up, activity-specific processes, etc.), (ii) tools and metrics, (iii) Tracking of progresses, (iv) guidelines for distribution of open-source software produced in the project, (v) gender plan for project management and champion programme |
D 3.5 (3.6) | First release of the new Accounting Portal deployed in production | WP 3 | CSIC | OTHER | PU | M14 | First release of the new Accounting Portal. |
D 6.8 | Analysis of requirements on biobank and study workflows | WP 6 | BBMRI ERIC | R | PU | M20 | This document provides a summary and an analysis of the requirements captured by the BBMRI-ERIC Competence Centre for workflows from the biobank community. |
D 6.9 | web portals for tsunami wave propagation simulations and for WRF-based weather simulation | WP 6 | AS | OTHER | PU | M14 | Simulation portals developed by the Disaster Mitigation Competence Centre |
D 6.10 | Infrastructure tests and best usage practices for life science service providers | WP 6 | CSC | R | PU | M15 | This report will summarise tests and best usage practices of the EGI Federated Cloud services for life science service providers. |
D 6.11 | Security toolset release for BBMRI-ERIC | WP 6 | SNIC/KTH | OTHER | PU | M21 | The final version of the toolset and security libraries released by the BBMRI-ERIC Competence Centre. This includes implementation and testing of the AAI in the project. |
D 6.12 | GPGPU-enabled web portal(s) for MoBrain | WP 6 | CIRMMP | OTHER | PU | M16 | Development of the GPGPU-enabled web portal(s) by the MoBrain Competence Centre. |
D 2.10 | Market Analysis Report of selected sectors | WP 2 | GRNET | R | PU | M18 | Document describing market potential, the actors present and the value chains, presents the results on the requirements data and reports on the competing offerings including technical perspective, and recommendation for future business development. |
D 3.7 | First release of the EGI Service Registry and Marketplace prototype | WP 3 | SWING | DEM | PU | M18 | First release of the Service Registry and Marketplace proof-of-concept prototype deployed in the EGI infrastructure for testing |
D 6.13 | EPOS EGI pilot incorporating data retrieval, transfer and linkage | WP 6 | SURFsara/KNMI | DEM | PU | M18 | Demonstrator developed based on EGI services by the EPOS Competence Centre for data retrieval, transfer and linkage. |
D 1.4 | Risk analysis and risk response for Period 2 | WP 1 | EGI.eu | R | PU | M20 | assesses the probability and impact of risks occurring and to determine the appropriate type of risk response; define a contingency plan if re-planning is not sufficient in face of the actual outcome of work performed and impact of related risks |
D 3.8 | First data accounting prototype | WP 3 | STFC | DEM | PU | M20 | First prototype of data accounting |
D 4.7 | Open Data Platform First Prototype | WP 4 | CYFRONET | DEM | PU | M20 | The first prototype version of the ODG software stack ready to be deployed on the pilot sites and providing the minimal set of the planned functionalities to make it valuable in the data processing chain. |
D 6.14 | Scipion cloud deployment for MoBrain | WP 6 | CSIC | OTHER | PU | M21 | Deployment of the Scipion workflow-oriented software integrator tool with the EGI Federated Cloud. |
D 2.11 | Cross-border procurement of e-Infrastructure services: Opportunities, Barriers, Use cases, Best Practices | WP 2 | CERN | R | PU | M24 | Results of the study on cross-border procurement of e-Infrastructure services by large research collaborations or research infrastructure. |
D 3.9 | Identity Management for Distributed User Communities | WP 3 | GRNET | R | PU | M24 | Best practice and the technical services to integrate new authentication mechanisms and to implement role based authorisation for the EGI communities |
D 3.10 | Second release of the new Accounting Portal deployed in production | WP 3 | CSIC | OTHER | PU | M24 | Second release of the new Accounting Portal |
D 3.11 | Second release of the operational tools | WP 3 | CNRS | OTHER | PU | M24 | Second release including second year developments. The release includes: Operations portal, GOCDB, ARGO, messaging infrastructure and security monitoring tools. |
D 3.12 | Second release of the Accounting Repository | WP 3 | STFC | OTHER | PU | M24 | Second release of accounting repository including second year developments. |
D 6.15 | Demonstrator for ELIXIR workflows implemented in the EGI Federated cloud | WP 6 | CESNET | DEM | PU | M24 | Demonstrators in the form of Virtual Machine Images in the EGI Federated Cloud. |
D 6.16 | Evaluated cloud environment and demonstrator of analysis workflow for biobank studies | WP 6 | BBMRI ERIC | DEM | PU | M30 | A demonstrator of a biobank research workspace running in the EGI cloud, together with an evaluation of its suitability in a typical NGS use case. |
D 6.17 | Production level gateway for Arts and Humanities | WP 6 | MTA SZTAKI | OTHER | PU | M24 | A WS-PGRADE based science gateway customised for the Arts and Humanities according to the requirements captured by the DARIAH Competence Centre. |
D 6.18 | Report on the installed LifeWatch applications and their usage record | WP 6 | CSIC | R | PU | M24 | A report to summaries the software applications that have been integrated and installed on EGI by the LifeWatch Competence Centre and to provide statistics about their use. |
D 6.19 | EPOS EGI pilot integrating computational resources and services | WP 6 | CYFRONET | DEM | PU | M24 | Demonstrator developed based on EGI computational services by the EPOS Competence Centre. |
D 6.20 | Application of the simulation portals for scientific scenario in disaster mitigation | WP 6 | AS | DEM | PU | M24 | Demonstrators built by the Disaster Mitigation Competence Centre within the simulation portals. |
D 3.14 (3.13) | Report on Data Accounting | WP 3 | STFC | R |
PU |
M24 | Report of the Data Accounting activity: including the data usage record definition, storage solutions supported and integration with accounting repository |
D 4.8 | Cross-infrastructure case studies report | WP 4 | INFN | R | PU | M24 | This deliverable will conclude the EGI-EUDAT integration activities with a comprehensive report on all cross-infrastructure case studies undertaken following the call in PM15. |
D 5.3 | Evolution of security policies, procedures and best practices | WP 5 | STFC | R | PU | M25 | Report on the evolution in the security policies and procedures of EGI, as evolved during the project. |
D 3.13 (3.14) | Second release of the EGI Service Registry and Marketplace prototype | WP 3 | SWING | DEM | PU | M26 | Second release of the Service Registry and Marketplace proof-of-concept prototype |
D 2.12 | EGI Governance: Report on Adoption | WP 2 | EGI.eu | R | PU | M28 | Changes to the EGI/EGI.eu governance models as approved by the EGI Council and implemented. |
D 3.15 | Second data accounting prototype | WP 3 | STFC | DEM | PU | M28 | The second prototype of the data accounting feature |
D 3.16 | Final report on EGI Service Registry and Marketplace | WP 3 | SWING | R | PU | M28 | EGI Service Registry and Marketplace activities during the whole project. Description of the final proof-of-concept prototype released, feedback collect by the users and guideline for the future developments will be reported. |
D 6.21 | Second version of enhanced portal for EISCAT_3D | WP 6 | EISCAT | OTHER | PU | M28 | Improved version of the EISCAT portal with reanalysis features implemented. |
D 1.5 | Report of quality status for Period 2 | WP 1 | EGI.eu | R | PU | M29 | defines: (i) quality processes (e.g., deliverable preparation, review preparation and post-review follow-up, activity-specific processes, etc.), (ii) tools and metrics, (iii) Tracking of progresses, (iv) guidelines for distribution of open-source software produced in the project, (v) gender plan for project management and champion programme |
D 4.9 | Open Data Platform: Demonstrator, Experience Report and Use Cases | WP 4 | CYFRONET | R | PU | M29 | This deliverable will be both demonstrator of the final version of prototype deployed on the selected pilot sites and an experience report based on the 6 months of evolution of ODG prototype since the first prototype was delivered. This report will provide a summary about the scientific use cases supported in the infrastructure with involvement of open data and potential future work and functionalities related to open data. |
D 6.22 | Design larger scale multi-hazards simulation attempting to reduce the uncertainty of climate change assessment | WP 6 | AS | DEM | PU | M29 | Demonstration of multi-scale hazards simulation by the disaster mitigation competence centre. |
D 2.13 | EGI Sustainability and Business Development Plan | WP 2 | EGI.eu | R | PU | M30 | Update on the strategic planning and evaluation activities of EGI. It also includes the results of the impact assessment and business development activities that aim at ensuring growth and sustainability of EGI. |
D 2.14 | Final Report on Communications, Dissemination and Engagement | WP 2 | EGI.eu | R | PU | M30 | Final results of communications, dissemination and engagement activities in the second half of the project |
D 3.17 | Final release of the accounting repository | WP 3 | STFC | OTHER | PU | M30 | Final release of the accounting repository including bug fixing. |
D 3.18 | Final release of the Operational tools | WP 3 | CNRS | OTHER | PU | M30 | Final release including final developments and bug fixes. The release includes: Operations portal, GOCDB, ARGO, messaging infrastructure and security monitoring tools. |
D 3.19 | Final release of the new Accounting Portal deployed in production | WP 3 | CSIC | OTHER | PU | M30 | Final release of the new Accounting Portal including bug fixing. |
D 4.10 | Final CANFAR integration release | WP 4 | NFN | DEM | PU | M30 | At the end of the activity a demonstrator will give evidence to the successful work undertaken in this task |
D 5.4 | Status report and evolution of operations after the project | WP 5 | EGI.eu | R | PU | M30 | Status report and evolution of operations after the project |
D 6.23 | Report on evaluation of EPOS EGI pilot studies | WP 6 | INFN/INGV | R | PU | M30 | The report will provide an evaluation of the pilots and demonstrators that have been developed by the EPOS Competence Centre during the project. |
Milestones
Milestone | Title | Related WP | Type | Delivery PM | Means of verification |
---|---|---|---|---|---|
M 1.1 | Execution plan | WP 1 | OTHER | M02 | Staff for each partner per each task is identified and communicated to the project office, the reporting lines, the project management and governance structures are defined and approved |
M 1.2 | First intermediate report | WP 1 | R |
M06 | An intermediate report describing the status of each activity within the project (M01 – M06) is approved |
M 1.3 | Second intermediate report | WP 1 | R |
M18 | An intermediate report describing the status of each activity within the project (M12 – M18) is approved |
M 2.1 | Website and templates | WP 2 | DEC |
M01 | Project information is available on the Web and document/presentation templates are defined |
M 2.2 | Technical Forum 2015 is organised | WP 2 | DEC | M12 | The event took place and a report is published with the main indicators including user satisfaction |
M 2.3 | The EGI website is reviewed | WP 2 | DEC | M13 | The website is reviewed and a number of recommended changes have been applied |
M 2.4 | EGI Service management practices are audited | WP 2 | OTHER | M15 | EGI service management practices are audited by an external FitSM consultant |
M 2.5 | Technical Forum 2016 is organised | WP 2 | DEC | M24 | The event took place and a report is published with the main indicators including user satisfaction |
M 2.6 | The EGI website is reviewed | WP 2 | DEC | M25 | The website is reviewed and a number of recommended changes have been applied |
M 2.7 | EGI Service management practices are audited | WP 2 | OTHER | M29 | EGI service management practices are audited by an external FitSM consultants |
M 3.1 | Operational tools development roadmap agreed | WP 3 | R | M04 | The operational tools development roadmap is agreed |
M 3.2 | User requirements on data accounting collected | WP 3 | OTHER | M12 | The user requirements on Data Accounting are agreed and documented |
M 3.3 | Operational tools development roadmap revised | WP 3 | R | M16 | The operational tools development roadmap is revised and documented |
M 3.4 | Pilot services and best practices to enable federated AAI solutions released | WP 3 | DEM | M16 | Pilot services and best practices to enable federated AAI solutions for EGI services are available for the VREs and CCs |
M 3.5 |
The first version of the EGI Marketplace is demonstrated | WP 3, WP 2 | DEM | M18 | Demo showcased at EGI Technical Forum and made available online |
M 3.6 | The second version of the EGI Marketplace is demonstrated | WP 3, WP 2 | DEM | M26 | Demo showcased at EGI Technical Forum and made available online |
M 4.1 | Open Data Platform: requirements and implementation plans | WP 4 | R | M06 | Final selection of the technologies used to create Open Data Access Platform agreed. The report includes requirements and use cases from selected communities interested in open data |
M 4.2 | Launch of call for cross e-Infrastructure case studies | WP 4 | OTHER | M15 | A call for participation for cross e-Infrastructure case studies is published |
M 4.3 | Open Data Platform in the Production | WP 4 | OTHER | M30 | The Open Data Platform is released in the production environment |
M 5.1 | Platform for the long-tail of science is available | WP 5 | OTHER | M10 | The services to enable easy access to EGI resources are production-ready. |
M 5.2 | e-CEO challenges run on EGI resources | WP 5 | OTHER | M15 | The e-CEO tool for the ESA data challenge is using also EGI resources to run the data analysis tasks |
M 5.3 | VREs for the fishery and marine sciences community are deployed in production | WP 5 | OTHER | M18 | Services for the fishery and marine sciences are available and production-ready on EGI resources |
M 6.1 | Joint training program for the first period is agreed | WP 6 | R | M03 | The plan is defined by the competence centres, the partner e-Infrastructures and partner projects of EGI-Engage |
M 6.2 | Security and privacy requirements and secure storage architectural design are agreed | WP 6 | R | M12 | Requirements are approved by the BBMRI Research Infrastructure community and the developers of the secure storage solution verified and accepted the design |
M 6.3 | Life science requirements analysis and driver use case(s) with implementation roadmap are agreed | WP 6 | R | M12 | Requirements are approved by the ELIXIR Research Infrastructure community |
M 6.4 | EPOS requirements analysis and outline of pilot use cases are agreed | WP 6 | R | M12 | Requirements and pilot use cases are approved by the EPOS Research Infrastructure community |
M 6.5 | Joint training program for the second period is agreed | WP 6 | R | M15 | The plan is endorsed by the competence centres, the partner e-Infrastructures and partner projects of EGI-Engage |