Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "SA1.3-QR12"

From EGIWiki
Jump to navigation Jump to search
Line 25: Line 25:
Note. This is a detailed account of progress over the previous quarter of activities within  the  task.  
Note. This is a detailed account of progress over the previous quarter of activities within  the  task.  
PLEASE PROVIDE TEXT IN A GOOD EDITED FORM (AVOID BULLET LISTS OF SHORT ITEMS THAT REQUIRE EXPANSION WHEN INSERTED IN AN OVERALL REPORT)
PLEASE PROVIDE TEXT IN A GOOD EDITED FORM (AVOID BULLET LISTS OF SHORT ITEMS THAT REQUIRE EXPANSION WHEN INSERTED IN AN OVERALL REPORT)
-->  
-->
During this quarter 2 UMD releases were achieved: [http://repository.egi.eu/2013/04/05/release-umd-2-4-1/ UMD 2.4.1],  [http://repository.egi.eu/2013/02/18/release-umd-2-4-0/ UMD 2.4.1], [http://repository.egi.eu/2013/04/05/release-umd-1-10-1/ UMD 1.10.1] and [http://repository.egi.eu/2012/12/17/release-umd-2-3-1/ UMD 2.3.1]. While for the UMD 1 repository there was a single release, 1.9.0,  which provided security fix from some Technology Providers. regarding the UMD 2.X releases there was achieved a total of three releases and was it was composed by one major release and two revisions releases. In total this quarter a total of 25 software components from both IGE and EMI Technological Providers were released into production. Also the Software Provisioning of components are ongoing towards the integration of the EMI-3 releases.
 
In this quarter there was a close collaboration with SA2 regarding the end of EMI /IGE Tecnhological Providers and the future of the UMD. This fact will have a huge impact in both SA2 and SA 1.3 after QR13.


= 3. Issues and Mitigation = <!-- fill the table below
= 3. Issues and Mitigation = <!-- fill the table below

Revision as of 14:49, 15 April 2013

Main EGI.eu operations services Support Documentation Tools Activities Performance Technology Catch-all Services Resource Allocation Security


Inspire reports menu: Home SA1 weekly Reports SA1 Task QR Reports NGI QR Reports NGI QR User support Reports


1. Task Meetings

Date (dd/mm/yyyy) Url Indico Agenda Title Outcome
... .... ... ...

2. Main Achievements

During this quarter 2 UMD releases were achieved: UMD 2.4.1, UMD 2.4.1, UMD 1.10.1 and UMD 2.3.1. While for the UMD 1 repository there was a single release, 1.9.0, which provided security fix from some Technology Providers. regarding the UMD 2.X releases there was achieved a total of three releases and was it was composed by one major release and two revisions releases. In total this quarter a total of 25 software components from both IGE and EMI Technological Providers were released into production. Also the Software Provisioning of components are ongoing towards the integration of the EMI-3 releases.

In this quarter there was a close collaboration with SA2 regarding the end of EMI /IGE Tecnhological Providers and the future of the UMD. This fact will have a huge impact in both SA2 and SA 1.3 after QR13.

3. Issues and Mitigation

Issue Description Mitigation Description
Dependency problems for jclassads 2.4.3 in the UMD production repositories (affecting UI and WN). Urgent release of UMD2 (2.4.1) has been done to get back coherence in the UMD repository
An high security issue as been raised that affected all CREAM-CE's in production Issue fixed in release UMD2 (2.4.1) with the release of the CREAM 1.14.4.

4. Plans for the next period