Difference between revisions of "Resource Centre OLA: Release Notes"
Jump to navigation
Jump to search
Line 43: | Line 43: | ||
**References to SAM replaced with NGI Nagios and related tools. | **References to SAM replaced with NGI Nagios and related tools. | ||
*Definitions changed to more consistent with the | *Definitions changed to be more consistent with the terminology about capabilities | ||
*Functionality capabilities and Information discovery capabilities defined and required | *Functionality capabilities and Information discovery capabilities defined and required | ||
*Alarm tickets removed | *Alarm tickets removed | ||
*Responsibility of the Resource Infrastructure Provider Operations Manager to inform RCs for changes to OLA redefined. | *Responsibility of the Resource Infrastructure Provider Operations Manager to inform RCs for changes to OLA redefined. | ||
*Certified RC | *Certified RC defined | ||
*Functional Capabilities redefined | *Functional Capabilities redefined | ||
*Clarified RIP is responsibile for its own and its sites information accuracy in GOCDB | *Clarified RIP is responsibile for its own and its sites information accuracy in GOCDB |
Revision as of 12:25, 10 June 2011
Main | EGI.eu operations services | Support | Documentation | Tools | Activities | Performance | Technology | Catch-all Services | Resource Allocation | Security |
Resource Centre OLA v. 1.0
Release Date | Release Version | Approved by |
03 June 2011 | 1.0 | Operations Management Board |
date | version | Comment |
---|---|---|
June 2011 | 1.0 [1] |
Version 1.0 Release notes First version of the OLA that attempts to adopt the new terminology as explained in the Operations Architecture document at [2]. Available at [3] Specifically, in this version:
|