Difference between revisions of "Resource Centre OLA: Release Notes"
Jump to navigation
Jump to search
Line 16: | Line 16: | ||
*Sites are now referred as Resource Centers or RCs | *Sites are now referred as Resource Centers or RCs | ||
*NGIs are Resource Infrastructure Providers or RIPs | *NGIs are Resource Infrastructure Providers or RIPs | ||
*Includes all the previous changes required for the transition from EGEE to EGI | |||
**EGEE replaced with EGI | |||
**SLD replaced with OLA | |||
**ROCs with NGIs | |||
**Removed strict references to gLite as supported anywhere | |||
**More flexible site service requirements | |||
**Require site to support for more than one non monitoring VO | |||
|} | |} |
Revision as of 16:43, 11 March 2011
Main | EGI.eu operations services | Support | Documentation | Tools | Activities | Performance | Technology | Catch-all Services | Resource Allocation | Security |
date | version | Comment |
---|---|---|
March 2010 | 1.0 [1] |
Version 1.0 Release notes First version of the OLA that attempts to adopt the new terminology as explained in the Operations Architecture document at [2]. Available at [3] Specifically, in this version:
|