Difference between revisions of "HOWTO02 Site Certification Required Documentation"
Jump to navigation
Jump to search
Line 20: | Line 20: | ||
|- | |- | ||
| Site Certification Procedure | | Site Certification Procedure | ||
| | | [[PROC09]] | ||
| Procedure document describing the steps required to register new Resource Centres and certify new and suspended ones. | | Procedure document describing the steps required to register new Resource Centres and certify new and suspended ones. | ||
|- | |- | ||
Line 40: | Line 40: | ||
|- | |- | ||
| GGUS Documentation and FAQs | | GGUS Documentation and FAQs | ||
| https:// | | https://ggus.eu and [[GGUS:FAQ]] | ||
| A collection of documentation relevant to GGUS. GGUS User Guide, FAQ for direct site notification are probably the most helpful | | A collection of documentation relevant to GGUS. GGUS User Guide, FAQ for direct site notification are probably the most helpful | ||
|- | |- | ||
Line 61: | Line 61: | ||
|- | |- | ||
| Service Availability Monitoring | | Service Availability Monitoring | ||
| | | [[SAM]] | ||
| The Service Availability Monitoring system (SAM) periodically checks the functionality of the grid services deplyoed/ | | The Service Availability Monitoring system (SAM) periodically checks the functionality of the grid services deplyoed/ | ||
|- | |- |
Revision as of 12:14, 23 November 2012
Main | EGI.eu operations services | Support | Documentation | Tools | Activities | Performance | Technology | Catch-all Services | Resource Allocation | Security |
Documentation menu: | Home • | Manuals • | Procedures • | Training • | Other • | Contact ► | For: | VO managers • | Administrators |
This is a table of documents required for Resource Centre registration and certification.
The Resource Centre administrators should read and understand the first five documents. It is a further requirement that the OLA between the NGI and Site, the Grid Site Operations Policy and Site Registration Security Policy are accepted by the Site Operations Manager. Further, documents referred within the latter two policy documents should also be understood.
Documentation
Documentation | Link | Description |
Site Certification Procedure | PROC09 | Procedure document describing the steps required to register new Resource Centres and certify new and suspended ones. |
Grid Site Operations Policy | https://documents.egi.eu/document/75 | Policy document describing the various conditions that a site must uphold to be operational. |
Site Registration Security Policy | https://documents.egi.eu/document/76 | Policy document describing the minimum requirements for registering a site that must be entered into the GOCDB. |
Resource Centre Operational Level Agreement (OLA) | https://documents.egi.eu/document/31 | |
Site Decommissioning Procedure | Under construction | Procedure document describing the steps required to unregister/decommission a site. |
GGUS Documentation and FAQs | https://ggus.eu and GGUS:FAQ | A collection of documentation relevant to GGUS. GGUS User Guide, FAQ for direct site notification are probably the most helpful |
Tools
Tools | Link | Description |
GOCDB | https://goc.egi.eu/ | |
Operations Dashboard | http://operations-portal.egi.eu/ | |
Service Availability Monitoring | SAM | The Service Availability Monitoring system (SAM) periodically checks the functionality of the grid services deplyoed/ |
GSTAT | http://gstat.egi.eu/gstat/summary/ | |
EGI Operations Architecture | https://documents.egi.eu/document/218 | Document describing the roles and responsibilities of the various layers in EGI and also the architectural nomenclature. |