Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "EGI-Engage:WP6-PY1-Roadmap"

From EGIWiki
Jump to navigation Jump to search
Line 1: Line 1:
{{Template:EGI-Engage menubar}} {{TOC_right}}  
<p><span class="fck_mw_template">{{Template:EGI-Engage menubar}}</span> <span class="fck_mw_template">{{TOC_right}}</span>
</p><p><br />
</p><p>This page is providing yearly activity plan for WP6 in PY1<br />
</p><p><br />
</p><p><br />
</p>
<h2> YIN  </h2>
<table class="wikitable">


<br>  
<tr>
<th> Project month<br />
</th>
<th>
<p>Project Tasks
</p>
</th>
<th>
<p>Work to be done
</p>
</th>
<th>
<p>Goal&#160;
</p><p>(measurable)
</p>
</th>
<th>
<p>Owner
</p><p>(reponsible person)
</p>
</th>
<th> Comments
</th></tr>
<tr>
<th> 1
</th>
<td> Task 6.8
</td>
<td>
<p>1) Portal Design Specification
</p><p>2) Portal prototype
</p>
</td>
<td>
<p>1) Agreement on task responsibilities of participating parties by May 2015
</p><p>2) First version of the portal specification to be drafted by the end of Summer 2015
</p><p>3) First prototype of the portal aims to be delivered by Dec 2015
</p>
</td>
<td>
<ul><li>Portal Design Specification: EISCAT (Ingemar Haggstrom)
</li><li>Portal prototype SNIC (Ake Sandgren)
</li><li>EGI contribution (Yin Chen)
</li></ul>
</td>
<td> <br />
</td></tr>
<tr>
<th> 1
</th>
<td> <br />
</td>
<td>
</td>
<td>
</td>
<td>
</td>
<td>
</td></tr>
<tr>
<th> 2
</th>
<td> <br />
</td>
<td> <br />
</td>
<td> <br />
</td>
<td> <br />
</td>
<td> <br />
</td></tr>
<tr>
<th> 3
</th>
<td>
</td>
<td> <br />
</td>
<td> <br />
</td>
<td> <br />
</td>
<td> <br />
</td></tr>
<tr>
<th> 4
</th>
<td>
</td>
<td> <br />
</td>
<td> <br />
</td>
<td> <br />
</td>
<td> <br />
</td></tr>
<tr>
<th> 5
</th>
<td>
</td>
<td> <br />
</td>
<td> <br />
</td>
<td> <br />
</td>
<td> <br />
</td></tr>
<tr>
<th> 6
</th>
<td>
</td>
<td> <br />
</td>
<td> <br />
</td>
<td> <br />
</td>
<td> <br />
</td></tr>
<tr>
<th> 7
</th>
<td>
</td>
<td> <br />
</td>
<td> <br />
</td>
<td> <br />
</td>
<td> <br />
</td></tr>
<tr>
<th> 8
</th>
<td>
</td>
<td> <br />
</td>
<td> <br />
</td>
<td> <br />
</td>
<td> <br />
</td></tr>
<tr>
<th> 9
</th>
<td>
</td>
<td> <br />
</td>
<td> <br />
</td>
<td> <br />
</td>
<td> <br />
</td></tr>
<tr>
<th> 10
</th>
<td>
</td>
<td> <br />
</td>
<td> <br />
</td>
<td> <br />
</td>
<td> <br />
</td></tr>
<tr>
<th> 11
</th>
<td>
</td>
<td> <br />
</td>
<td> <br />
</td>
<td> <br />
</td>
<td> <br />
</td></tr>
<tr>
<th> 12
</th>
<td>
</td>
<td> <br />
</td>
<td> <br />
</td>
<td> <br />
</td>
<td> <br />
</td></tr></table>
<p><br />
</p>
<h2> ENOL  </h2>
<table class="wikitable">


This page is providing yearly activity plan for WP6 in PY1<br>  
<tr>
<th> Project month<br />
</th>
<th>
<p>Project Tasks
</p>
</th>
<th>
<p>Work to be done
</p>
</th>
<th>
<p>Goal&#160;
</p><p>(measurable)
</p>
</th>
<th>
<p>Owner
</p><p>(reponsible person)
</p>
</th>
<th> Comments
</th></tr>
<tr>
<th> 1
</th>
<td> Task 6.2
</td>
<td> Definition of the technical use cases support process
</td>
<td> Establishment of a procedure for handling use case support, RT queue for tracking use cases
</td>
<td> Gergely Sypos / Enol Fernandez
</td>
<td>
</td></tr>
<tr>
<th> X
</th>
<td> Task 6.2
</td>
<td> Pilot usage of EGI infrastructure by HBP
</td>
<td> XX
</td>
<td> XXX
</td>
<td>
</td></tr>
<tr>
<th> XX
</th>
<td> Task 6.2
</td>
<td> Pilot usage of EGI infrastructure by LOFAR/SKA
</td>
<td> XX
</td>
<td> XX
</td>
<td>
</td></tr>
<tr>
<th> 9
</th>
<td> Task 6.7
</td>
<td> Assisted pattern recognition tools integrated with EGI for citizen science
</td>
<td> XXX
</td>
<td> Jesús Marco/Fernando Aguilar
</td>
<td>
</td></tr>
<tr>
<th> 12
</th>
<td> Task 6.7
</td>
<td> Data flow handler and basic R tools to integrate and process data from Ecological Observatories on EGI
</td>
<td> XXX
</td>
<td> Jesús Marco/Fernando Aguilar)
</td>
<td>
</td></tr>
</table>
<p><br />
</p>
<h2> DIEGO  </h2>
<table class="wikitable">


<br>  
<tr>
<th> Project month<br />
</th>
<th>
<p>Project Tasks
</p>
</th>
<th>
<p>Work to be done
</p>
</th>
<th>
<p>Goal&#160;
</p><p>(measurable)
</p>
</th>
<th>
<p>Owner
</p><p>(reponsible person)
</p>
</th>
<th> Comments
</th></tr>
<tr>
<th> 12
</th>
<td> Task 6.9
</td>
<td> EPOS requirements analysis and outline of pilot use cases are agreed<br />
</td>
<td>
<ul><li> AAI requirements analysed and the EPOS AAI architecture envisaged.
</li><li> Basic multidisciplinary AAI use case defined: it deals with the discovery of heterogeneous data from the ICS-C portal
</li><li> An extended, single discipline, computational oriented use case defined<br />
</li></ul>
</td>
<td> Daniele Balio (EPOS/INGV), Diego Scardaci (EGI.eu/INFN)<br />
</td>
<td> <br />
</td></tr>
<tr>
<th> 1
</th>
<td>
</td>
<td>
</td>
<td>
</td>
<td>
</td>
<td>
</td></tr>
<tr>
<th> 2
</th>
<td>
</td>
<td> <br />
</td>
<td> <br />
</td>
<td> <br />
</td>
<td> <br />
</td></tr>
<tr>
<th> 3
</th>
<td>
</td>
<td> <br />
</td>
<td> <br />
</td>
<td> <br />
</td>
<td> <br />
</td></tr>
<tr>
<th> 4
</th>
<td>
</td>
<td> <br />
</td>
<td> <br />
</td>
<td> <br />
</td>
<td> <br />
</td></tr>
<tr>
<th> 5
</th>
<td>
</td>
<td> <br />
</td>
<td> <br />
</td>
<td> <br />
</td>
<td> <br />
</td></tr>
<tr>
<th> 6
</th>
<td>
</td>
<td> <br />
</td>
<td> <br />
</td>
<td> <br />
</td>
<td> <br />
</td></tr>
<tr>
<th> 7
</th>
<td>
</td>
<td> <br />
</td>
<td> <br />
</td>
<td> <br />
</td>
<td> <br />
</td></tr>
<tr>
<th> 8
</th>
<td>
</td>
<td> <br />
</td>
<td> <br />
</td>
<td> <br />
</td>
<td> <br />
</td></tr>
<tr>
<th> 9
</th>
<td>
</td>
<td> <br />
</td>
<td> <br />
</td>
<td> <br />
</td>
<td> <br />
</td></tr>
<tr>
<th> 10
</th>
<td>
</td>
<td> <br />
</td>
<td> <br />
</td>
<td> <br />
</td>
<td> <br />
</td></tr>
<tr>
<th> 11
</th>
<td>
</td>
<td> <br />
</td>
<td> <br />
</td>
<td> <br />
</td>
<td> <br />
</td></tr>
<tr>
<th> 12
</th>
<td>
</td>
<td> <br />
</td>
<td> <br />
</td>
<td> <br />
</td>
<td> <br />
</td></tr></table>
<p><br />
</p>
<h2> GERGELY  </h2>
<table class="wikitable">


<br>  
<tr>
 
<th> Project month<br />
== YIN  ==
</th>
 
<th>
{| class="wikitable"
<p>Project Tasks
|-
</p>
! Project month<br>  
</th>
!
<th>
Project Tasks
<p>Work to be done
 
</p>
!
</th>
Work to be done
<th>
 
<p>Goal&#160;  
!
</p><p>(measurable)  
Goal&nbsp;
</p>
 
</th>
(measurable)
<th>
 
<p>Owner
!
</p><p>(reponsible person)
Owner
</p>
 
</th>
(reponsible person)
<th> Comments
 
</th></tr>
! Comments
<tr>
|-
<th>
! 1
<p>3
| Task 6.8
</p>
|
</th>
1) Portal Design Specification
<td>
 
<p>Task 6.1
2) Portal prototype
</p>
 
</td>
|
<td>
1) Agreement on task responsibilities of participating parties by May 2015
<p>Define EGI's training plan for the 1st year of EGI-Engage  
 
</p>
2) First version of the portal specification to be drafted by the end of Summer 2015
</td>
 
<td>
3) First prototype of the portal aims to be delivered by Dec 2015
<p>M6.1 Joint training programme for the first project year (With EUDAT, PRACE, CCs, NGIs, UCB)  
 
</p>
|
</td>
*Portal Design Specification: EISCAT (Ingemar Haggstrom)
<td>
*Portal prototype SNIC (Ake Sandgren)
<p>Gergely Sipos  
*EGI contribution (Yin Chen)
</p>
 
</td>
| <br>
<td>
|-
<p>Document was delivered at the end of May: http://go.egi.eu/trainingplan  
! 1
</p>
| <br>  
</td></tr>
|
<tr>
|
<th>
|
<p>5  
|
</p>
|-
</th>
! 2
<td>
| <br>  
<p>Task 6.1<span class="Apple-tab-span" style="white-space:pre"> </span>  
| <br>  
</p>
| <br>  
</td>
| <br>  
<td>
| <br>
<p>Setup training VO on the Federated Cloud  
|-
</p><p>Register training robot certificate, generate proxies for students and trainers  
! 3
</p><p>Prepare training materials for 3.5 course (slides + hands-on exercises incl. VM images and datasets)&#160;  
|
</p><p>Test training material and setup by July 15, deliver courses in second part of July  
| <br>  
</p>
| <br>  
</td>
| <br>
<td>
| <br>
<p>Deliver two courses on EGI Federated Cloud at 'Software Carpentry workshop' (SAP, UK) and HPCS (Amsterdam)  
|-
</p>
! 4
</td>
|
<td>
| <br>
<p>Gergely Sipos  
| <br>
</p>
| <br>
</td>
| <br>
<td>
|-
</td></tr>
! 5
<tr>
|
<th>
| <br>
<p>10  
| <br>
</p>
| <br>
</th>
| <br>
<td>
|-
<p>Task 6.1  
! 6
</p>
|
</td>
| <br>
<td>
| <br>
<p><span style="font-family: Calibri, sans-serif; font-size: 11pt; letter-spacing: 0.1pt; line-height: 115%;">Work with Resource providers of the training VO</span><span style="font-family: Calibri, sans-serif; font-size: 11pt; letter-spacing: 0.1pt; line-height: 115%;">&#160;to identify
| <br>
| <br>
|-
! 7
|
| <br>
| <br>
| <br>
| <br>
|-
! 8
|
| <br>
| <br>
| <br>
| <br>
|-
! 9
|
| <br>
| <br>
| <br>  
| <br>
|-
! 10
|
| <br>  
| <br>
| <br>
| <br>
|-
! 11
|
| <br>
| <br>
| <br>
| <br>
|-
! 12
|
| <br>
| <br>
| <br>
| <br>
|}
 
<br>
 
== ENOL  ==
 
{| class="wikitable"
|-
! Project month<br>
!
Project Tasks
 
!
Work to be done
 
!
Goal&nbsp;  
 
(measurable)
 
!
Owner
 
(reponsible person)
 
! Comments
|-
! 1
| Task 6.2
| Definition of the technical use cases support process
| Establishment of a procedure for handling use case support, RT queue for tracking use cases
| Gergely Sypos / Enol Fernandez
|
|-
! X
| Task 6.2
| Pilot usage of EGI infrastructure by HBP
| XX
| XXX
|
|-
! XX
| Task 6.2
| Pilot usage of EGI infrastructure by LOFAR/SKA
| XX
| XX
|
|-
! 9
| Task 6.7
| Assisted pattern recognition tools integrated with EGI for citizen science
| XXX
| Jesús Marco/Fernando Aguilar
|
|-
! 12
| Task 6.7
| Data flow handler and basic R tools to integrate and process data from Ecological Observatories on EGI
| XXX
| Jesús Marco/Fernando Aguilar)
|
|-
|}
 
<br>
 
== DIEGO  ==
 
{| class="wikitable"
|-
! Project month<br>  
!
Project Tasks
 
!
Work to be done
 
!
Goal&nbsp;
 
(measurable)  
 
!
Owner
 
(reponsible person)
 
! Comments
|-
! 12
| Task 6.9
| EPOS requirements analysis and outline of pilot use cases are agreed<br>  
|
* AAI requirements analysed and the EPOS AAI architecture envisaged.
* Basic multidisciplinary AAI use case defined: it deals with the discovery of heterogeneous data from the ICS-C portal
* An extended, single discipline, computational oriented use case defined<br>
| Daniele Balio (EPOS/INGV), Diego Scardaci (EGI.eu/INFN)<br>  
| <br>
|-
! 1
|
|
|
|
|-
! 2
|
| <br>  
| <br>  
| <br>  
| <br>
|-
! 3
|
| <br>  
| <br>  
| <br>  
| <br>
|-
! 4
|
| <br>  
| <br>  
| <br>  
| <br>
|-
! 5
|
| <br>  
| <br>  
| <br>  
| <br>
|-
! 6  
|
| <br>  
| <br>
| <br>
| <br>
|-
! 7
|
| <br>
| <br>
| <br>
| <br>
|-
! 8
|
| <br>
| <br>
| <br>
| <br>
|-
! 9
|
| <br>
| <br>
| <br>
| <br>
|-
! 10
|
| <br>
| <br>
| <br>
| <br>
|-
! 11
|
| <br>
| <br>
| <br>
| <br>
|-
! 12
|
| <br>
| <br>
| <br>  
| <br>
|}
 
<br>
 
== GERGELY  ==
 
{| class="wikitable"
|-
! Project month<br>
!
Project Tasks
 
!
Work to be done
 
!
Goal&nbsp;
 
(measurable)
 
!
Owner
 
(reponsible person)
 
! Comments
|-
!
3
 
|
Task 6.1
 
|
Define EGI's training plan for the 1st year of EGI-Engage  
 
|
M6.1 Joint training programme for the first project year (With EUDAT, PRACE, CCs, NGIs, UCB)  
 
|
Gergely Sipos  
 
|
Document was delivered at the end of May: http://go.egi.eu/trainingplan  
 
|-
!
5  
 
|
Task 6.1<span class="Apple-tab-span" style="white-space:pre"> </span>  
 
|
Setup training VO on the Federated Cloud  
 
Register training robot certificate, generate proxies for students and trainers  
 
Prepare training materials for 3.5 course (slides + hands-on exercises incl. VM images and datasets)&nbsp;  
 
Test training material and setup by July 15, deliver courses in second part of July  
 
|
Deliver two courses on EGI Federated Cloud at 'Software Carpentry workshop' (SAP, UK) and HPCS (Amsterdam)  
 
|
Gergely Sipos  
 
|
|-
!
10  
 
|
Task 6.1  
 
|
<span style="font-family: Calibri, sans-serif; font-size: 11pt; letter-spacing: 0.1pt; line-height: 115%;">Work with Resource providers of the training VO</span><span style="font-family: Calibri, sans-serif; font-size: 11pt; letter-spacing: 0.1pt; line-height: 115%;">&nbsp;to identify
suitable business model for continued provisioning of thevirtualised training
suitable business model for continued provisioning of thevirtualised training
e-infrastructure that can operate 24/7 to serve EGI-related courses and
e-infrastructure that can operate 24/7 to serve EGI-related courses and
self-paced training needs.</span>  
self-paced training needs.</span>  
 
</p>
|
</td>
Suitable business model for continued operation of the training VO in EGI  
<td>
 
<p>Suitable business model for continued operation of the training VO in EGI  
|
</p>
Gergely Sipos  
</td>
 
<td>
|
<p>Gergely Sipos  
<br>  
</p>
 
</td>
|-
<td>
!
<p><br />  
10  
</p>
 
</td></tr>
|
<tr>
Task 6.1  
<th>
 
<p>10  
|
</p>
<span style="font-family: Calibri, sans-serif; font-size: 14.6666669845581px; letter-spacing: 0.133333340287209px; line-height: 16.8666667938232px;">Prepare module based on the joint use case that has been identified and documented during the EGI-EUDAT meeting at the EGI Conference in Lisbon. (FedCloud, B2Find, B2Drop, B2Safe)</span>  
</th>
 
<td>
|
<p>Task 6.1  
Joint training module with EUDAT&nbsp;  
</p>
 
</td>
|
<td>
Diego Scardaci  
<p><span style="font-family: Calibri, sans-serif; font-size: 14.6666669845581px; letter-spacing: 0.133333340287209px; line-height: 16.8666667938232px;">Prepare module based on the joint use case that has been identified and documented during the EGI-EUDAT meeting at the EGI Conference in Lisbon. (FedCloud, B2Find, B2Drop, B2Safe)</span>  
 
</p>
|
</td>
<span style="font-size: 13.2799997329712px;">F2F delivery at the EGI Community Forum?</span><span style="font-size: 13.2799997329712px; line-height: 1.5em;">&nbsp;</span>  
<td>
 
<p>Joint training module with EUDAT&#160;  
|-
</p>
!
</td>
8  
<td>
 
<p>Diego Scardaci  
|
</p>
Task 6.1  
</td>
 
<td>
|
<p><span style="font-size: 13.2799997329712px;">F2F delivery at the EGI Community Forum?</span><span style="font-size: 13.2799997329712px; line-height: 1.5em;">&#160;</span>  
After the platform components are integrated and tested develop training for the NGI user support teams and EGI.eu staff on how to support long-tail users with the platform.&nbsp;  
</p>
 
</td></tr>
|
<tr>
Training module on the 'EGI&nbsp;long tail of science' platform  
<th>
 
<p>8  
|
</p>
Diego Scardaci, Peter Solagna  
</th>
 
<td>
|
<p>Task 6.1  
F2F delivery at the EGI Community Forum?  
</p>
 
</td>
|-
<td>
!
<p>After the platform components are integrated and tested develop training for the NGI user support teams and EGI.eu staff on how to support long-tail users with the platform.&#160;  
8  
</p>
 
</td>
|
<td>
Task 6.1  
<p>Training module on the 'EGI&#160;long tail of science' platform  
 
</p>
|
</td>
<span>A module about security policy, procedures and
<td>
<p>Diego Scardaci, Peter Solagna  
</p>
</td>
<td>
<p>F2F delivery at the EGI Community Forum?  
</p>
</td></tr>
<tr>
<th>
<p>8  
</p>
</th>
<td>
<p>Task 6.1  
</p>
</td>
<td>
<p><span>A module about security policy, procedures and
</span> <span>
</span> <span>
interoperability solutions in the various e-infrastructures, with possible involvement
interoperability solutions in the various e-infrastructures, with possible involvement
Line 460: Line 679:
the autumn, then will be shared as a training module in the marketplace.
the autumn, then will be shared as a training module in the marketplace.
</span>  
</span>  
 
</p><p><br />
<br>  
</p>
 
</td>
|
<td>
Joint event and training module with PRACE  
<p>Joint event and training module with PRACE  
 
</p>
|
</td>
Dave Kelsey  
<td>
 
<p>Dave Kelsey  
|
</p>
Event approx in October (date, venue TBD)  
</td>
 
<td>
|-
<p>Event approx in October (date, venue TBD)  
!
</p>
5  
</td></tr>
 
<tr>
|
<th>
Task 6.1  
<p>5  
 
</p>
|
</th>
<span>The module will target those who prepare and those who
<td>
<p>Task 6.1  
</p>
</td>
<td>
<p><span>The module will target those who prepare and those who
</span> <span>
</span> <span>
endorse VM images for scientific/training purposes. The module will define the
endorse VM images for scientific/training purposes. The module will define the
characteristics of ‘secure’ VM images, will teach how to prepare such images,
characteristics of ‘secure’ VM images, will teach how to prepare such images,
and will demonstrate how to assess the security characteristics of such images.&nbsp;
and will demonstrate how to assess the security characteristics of such images.&#160;
</span>  
</span>  
 
</p><p><br />
<br>  
</p>
 
</td>
|
<td>
<span>Training module on Virtual Machine preparation and certification in the
<p><span>Training module on Virtual Machine preparation and certification in the
</span> <span>
</span> <span>
EGI Federated Cloud.
EGI Federated Cloud.
</span>  
</span>  
 
</p><p><br />
<br>  
</p>
 
</td>
|
<td>
Vincenzo<span class="Apple-tab-span" style="white-space:pre"> </span> Spinoso  
<p>Vincenzo<span class="Apple-tab-span" style="white-space:pre"> </span> Spinoso  
 
</p>
|
</td>
<span>To be developed by security experts funded in T6.1:</span>&nbsp;<span style="font-family: Calibri, sans-serif; font-size: 11pt; letter-spacing: 0.1pt; line-height: 115%;">CERN, CESNET, LIP, NIKHEF</span>  
<td>
 
<p><span>To be developed by security experts funded in T6.1:</span>&#160;<span style="font-family: Calibri, sans-serif; font-size: 11pt; letter-spacing: 0.1pt; line-height: 115%;">CERN, CESNET, LIP, NIKHEF</span>  
|-
</p>
!
</td></tr>
10  
<tr>
 
<th>
|
<p>10  
Task 6.1  
</p>
 
</th>
|
<td>
|
<p>Task 6.1  
<span style="line-height: 19.9200000762939px; font-size: 13.2799997329712px;">Training module on&nbsp;</span><span style="font-family: Calibri, sans-serif; font-size: 11pt; letter-spacing: 0.1pt; line-height: 115%;">Incident handling in the EGI Federated Cloud.&nbsp;</span>  
</p>
 
</td>
|
<td>
Dave Kelsey  
</td>
 
<td>
|
<p><span style="line-height: 19.9200000762939px; font-size: 13.2799997329712px;">Training module on&#160;</span><span style="font-family: Calibri, sans-serif; font-size: 11pt; letter-spacing: 0.1pt; line-height: 115%;">Incident handling in the EGI Federated Cloud.&#160;</span>  
<span style="font-size: 11pt; line-height: 16.8666667938232px; font-family: Calibri, sans-serif; letter-spacing: 0.1pt;">To be developed by security experts funded in T6.1:</span><span style="font-size: 13.2799997329712px;">&nbsp;</span><span style="font-family: Calibri, sans-serif; font-size: 11pt; letter-spacing: 0.1pt; line-height: 16.8666667938232px;">CERN, CESNET, LIP, NIKHEF</span>  
</p>
 
</td>
F2F delivery at EGI Community Forum?  
<td>
 
<p>Dave Kelsey  
|-
</p>
!
</td>
12<span class="Apple-tab-span" style="white-space:pre"> </span>  
<td>
 
<p><span style="font-size: 11pt; line-height: 16.8666667938232px; font-family: Calibri, sans-serif; letter-spacing: 0.1pt;">To be developed by security experts funded in T6.1:</span><span style="font-size: 13.2799997329712px;">&#160;</span><span style="font-family: Calibri, sans-serif; font-size: 11pt; letter-spacing: 0.1pt; line-height: 16.8666667938232px;">CERN, CESNET, LIP, NIKHEF</span>  
|
</p><p>F2F delivery at EGI Community Forum?  
Task 6.1  
</p>
 
</td></tr>
|
<tr>
<span style="line-height: 1.5em; text-indent: -18pt; font-size: 13.2799997329712px;">Exploring possibility of training module developments with other tasks on the following topics:</span>  
<th>
 
<p>12<span class="Apple-tab-span" style="white-space:pre"> </span>  
<span style="line-height: 1.5em; text-indent: -18pt; font-size: 13.2799997329712px;">1. Open Data Processing solution from EGI (by
</p>
</th>
<td>
<p>Task 6.1  
</p>
</td>
<td>
<p><span style="line-height: 1.5em; text-indent: -18pt; font-size: 13.2799997329712px;">Exploring possibility of training module developments with other tasks on the following topics:</span>  
</p><p><span style="line-height: 1.5em; text-indent: -18pt; font-size: 13.2799997329712px;">1. Open Data Processing solution from EGI (by
members of task JRA2.1).</span>  
members of task JRA2.1).</span>  
 
</p><p><span style="line-height: 1.5em; text-indent: -18pt; font-size: 13.2799997329712px;">2. GPGPU-computing in EGI (by members of task
<span style="line-height: 1.5em; text-indent: -18pt; font-size: 13.2799997329712px;">2. GPGPU-computing in EGI (by members of task
JRA2.4 and NGI-BG).</span>  
JRA2.4 and NGI-BG).</span>  
 
</p><p>3.&#160;<span style="line-height: 1.5em; text-indent: -18pt; font-size: 13.2799997329712px;">Deploying clouds and federated clouds for
3.&nbsp;<span style="line-height: 1.5em; text-indent: -18pt; font-size: 13.2799997329712px;">Deploying clouds and federated clouds for
scientific and educational purposes (by members of the Federated Cloud
scientific and educational purposes (by members of the Federated Cloud
collaboration).</span>  
collaboration).</span>  
 
</p><p>4.&#160;<span style="line-height: 1.5em; text-indent: -18pt; font-size: 13.2799997329712px;">iRODS training (in collaboration with NGI-FR and
4.&nbsp;<span style="line-height: 1.5em; text-indent: -18pt; font-size: 13.2799997329712px;">iRODS training (in collaboration with NGI-FR and
the DIRAC team).</span><br />
the DIRAC team).</span><br>  
</p>
 
</td>
|
<td>
Additional training modules  
<p>Additional training modules  
 
</p>
|
</td>
Gergely Sipos  
<td>
 
<p>Gergely Sipos  
|
</p>
F2F delivery at EGI Community Forum?  
</td>
 
<td>
|-
<p>F2F delivery at EGI Community Forum?  
! 4  
</p>
| Task 6.1  
</td></tr>
|
<tr>
Ensure that the Training Marketplace is used accross EGI, and that it can collect and provide the relevant details about events, content, etc and the impact.  
<th> 4
 
</th>
Provide templates and surveys for EGI trainers to be able to collect relevant metrics.&nbsp;  
<td> Task 6.1
 
</td>
| Mechanisms and tools to assess impact of training activities.  
<td>
| Gergely Sipos  
<p>Ensure that the Training Marketplace is used accross EGI, and that it can collect and provide the relevant details about events, content, etc and the impact.  
|
</p><p>Provide templates and surveys for EGI trainers to be able to collect relevant metrics.&#160;  
|-
</p>
! 12  
</td>
| Task 6.3 (ELIXIR)  
<td> Mechanisms and tools to assess impact of training activities.
|
</td>
<span style="font-size: 13.2799997329712px;">Collect use cases from ELIXIR-EXCELERATE, CC members, EGI</span><span style="font-size: 13.2799997329712px; line-height: 1.5em;">&nbsp;members (e.g. GAPF</span><span style="font-size: 13.2799997329712px; line-height: 1.5em;">&nbsp;VT),&nbsp;</span><span style="font-size: 13.2799997329712px; line-height: 1.5em;">then select the most relevant ones for the CC to work with. Analyse use cases from the technical perspective to capture requirements for e-infra and ELXIR</span><span style="font-size: 13.2799997329712px; line-height: 1.5em;">&nbsp;RI</span><span style="font-size: 13.2799997329712px; line-height: 1.5em;">&nbsp;services.&nbsp;</span>  
<td> Gergely Sipos
 
</td>
<span style="font-size: 12.8000001907349px; line-height: 19.2000007629395px; background-color: rgb(249, 249, 249);">Life science requirements analysis and driver use case(s) with implementation roadmap are agreed</span>  
<td>
 
</td></tr>
| <span style="font-size: 12.8000001907349px; line-height: 19.2000007629395px; background-color: rgb(249, 249, 249);">M6.3:</span>&nbsp;<span style="font-size: 12.8000001907349px; line-height: 19.2000007629395px; background-color: rgb(249, 249, 249);">Life science requirements analysis and driver use case(s) with implementation roadmap are agreed</span><span style="font-size: 13.2799997329712px; line-height: 1.5em;">.&nbsp;</span>  
<tr>
| <span style="font-size: 13.2799997329712px;">Tommi Nyronen</span>  
<th> 12
|
</th>
|-
<td> Task 6.3 (ELIXIR)
! 12  
</td>
| Task 6.4 (BBMRI)  
<td>
|
<p><span style="font-size: 13.2799997329712px;">Collect use cases from ELIXIR-EXCELERATE, CC members, EGI</span><span style="font-size: 13.2799997329712px; line-height: 1.5em;">&#160;members (e.g. GAPF</span><span style="font-size: 13.2799997329712px; line-height: 1.5em;">&#160;VT),&#160;</span><span style="font-size: 13.2799997329712px; line-height: 1.5em;">then select the most relevant ones for the CC to work with. Analyse use cases from the technical perspective to capture requirements for e-infra and ELXIR</span><span style="font-size: 13.2799997329712px; line-height: 1.5em;">&#160;RI</span><span style="font-size: 13.2799997329712px; line-height: 1.5em;">&#160;services.&#160;</span>  
<span style="font-size: 13.2799997329712px; line-height: 19.9200000762939px;">Collect use cases from the BBMRI</span>&nbsp;community and <span style="font-size: 13.2799997329712px; line-height: 19.9200000762939px;">from CC members</span><span style="font-size: 13.2799997329712px; line-height: 1.5em;">&nbsp;</span><span style="font-size: 13.2799997329712px; line-height: 1.5em;">then select the most relevant ones for the CC to work with. Analyse use cases from the technical perspective to capture requirements for e-infra and BBMRI</span>&nbsp;<span style="font-size: 13.2799997329712px; line-height: 1.5em;">RI</span><span style="font-size: 13.2799997329712px; line-height: 1.5em;">&nbsp;services. Design suitable technical architecture to address the requirements.&nbsp;</span><br>  
</p><p><span style="font-size: 12.8000001907349px; line-height: 19.2000007629395px; background-color: rgb(249, 249, 249);">Life science requirements analysis and driver use case(s) with implementation roadmap are agreed</span>  
 
</p>
| <span style="font-size: 12.8000001907349px; line-height: 19.2000007629395px; background-color: rgb(249, 249, 249);">M6.2:</span>&nbsp;<span style="font-size: 12.8000001907349px; line-height: 19.2000007629395px; background-color: rgb(249, 249, 249);">Security and privacy requirements and secure storage architectural design are agreed</span>  
</td>
| Petr Holub  
<td> <span style="font-size: 12.8000001907349px; line-height: 19.2000007629395px; background-color: rgb(249, 249, 249);">M6.3:</span>&#160;<span style="font-size: 12.8000001907349px; line-height: 19.2000007629395px; background-color: rgb(249, 249, 249);">Life science requirements analysis and driver use case(s) with implementation roadmap are agreed</span><span style="font-size: 13.2799997329712px; line-height: 1.5em;">.&#160;</span>
|
</td>
|-
<td> <span style="font-size: 13.2799997329712px;">Tommi Nyronen</span>
! 7
</td>
| Task 6.5 (MoBrain)  
<td>
| Discuss options for the implementation of a fully integrated MoBrain portal (built on N4U and WeNMR technologies, considering work in WestLife VRE project). Reach agreement on the concept of the integrated portal and on CC partners' responsibilty for developing it.  
</td></tr>
| <span style="font-size: 13.2799997329712px;">Agreement on the concept of the integrated portal and on CC partners' responsibilty for developing it.</span>  
<tr>
| Alexander Bonvin  
<th> 12
|
</th>
|-
<td> Task 6.4 (BBMRI)
! 12  
</td>
| Task 6.5 (MoBrain)  
<td>
|
<p><span style="font-size: 13.2799997329712px; line-height: 19.9200000762939px;">Collect use cases from the BBMRI</span>&#160;community and <span style="font-size: 13.2799997329712px; line-height: 19.9200000762939px;">from CC members</span><span style="font-size: 13.2799997329712px; line-height: 1.5em;">&#160;</span><span style="font-size: 13.2799997329712px; line-height: 1.5em;">then select the most relevant ones for the CC to work with. Analyse use cases from the technical perspective to capture requirements for e-infra and BBMRI</span>&#160;<span style="font-size: 13.2799997329712px; line-height: 1.5em;">RI</span><span style="font-size: 13.2799997329712px; line-height: 1.5em;">&#160;services. Design suitable technical architecture to address the requirements.&#160;</span><br />
| <span style="font-size: 12.8000001907349px; line-height: 19.2000007629395px; background-color: rgb(249, 249, 249);">D6.4:</span>&nbsp;<span style="font-size: 12.8000001907349px; line-height: 19.2000007629395px; background-color: rgb(249, 249, 249);">Fully integrated MoBrain web portal (OTHER)</span>  
</p>
| Alexander Bonvin  
</td>
|
<td> <span style="font-size: 12.8000001907349px; line-height: 19.2000007629395px; background-color: rgb(249, 249, 249);">M6.2:</span>&#160;<span style="font-size: 12.8000001907349px; line-height: 19.2000007629395px; background-color: rgb(249, 249, 249);">Security and privacy requirements and secure storage architectural design are agreed</span>
|-
</td>
! 11
<td> Petr Holub
| Task 6.5 (MoBrain)  
</td>
| Learn about the 'Accelerated Computing platform' of EGI&nbsp;(GPGPU facility) at the EGI Community Forum; Perform initial tests on it with GROMACS and AMBER.  
<td>
| Initial tests on the 'Accelerated Computing platform' of&nbsp;EGI  
</td></tr>
| Alexandre Bonvin, Peter Solagna  
<tr>
| Depends on progress of Task JRA2.4
<th> 7
|-
</th>
! 4  
<td> Task 6.5 (MoBrain)
| Task 6.6 (DARIAH)  
</td>
|
<td> Discuss options for the implementation of a fully integrated MoBrain portal (built on N4U and WeNMR technologies, considering work in WestLife VRE project). Reach agreement on the concept of the integrated portal and on CC partners' responsibilty for developing it.
Prepare user survey to be used by the CC to collect needs and requirements from digital humanities communities and users.&nbsp;Interview leaders of relevant DARIAH WGs, run the survey in relevant groups  
</td>
 
<td> <span style="font-size: 13.2799997329712px;">Agreement on the concept of the integrated portal and on CC partners' responsibilty for developing it.</span>
| User survey and interviews conducted  
</td>
| Karolj Skala, Davor Davidovic  
<td> Alexander Bonvin
|
</td>
|-
<td>
! 9
</td></tr>
| Task 6.6 (DARIAH)&nbsp;  
<tr>
| Collect and analyse the outcome of the user survey and interviews, feed findings into CC activities (both technical and community related)&nbsp;  
<th> 12
| Analysis of user interview and survey outcome  
</th>
| Karolj Skala, Davor Davidovic  
<td> Task 6.5 (MoBrain)
|
</td>
|-
<td>
! 11  
</td>
| Task 6.6 (DARIAH)  
<td> <span style="font-size: 12.8000001907349px; line-height: 19.2000007629395px; background-color: rgb(249, 249, 249);">D6.4:</span>&#160;<span style="font-size: 12.8000001907349px; line-height: 19.2000007629395px; background-color: rgb(249, 249, 249);">Fully integrated MoBrain web portal (OTHER)</span>
|
</td>
| <span style="font-size: 12.8000001907349px; line-height: 19.2000007629395px; background-color: rgb(249, 249, 249);">D6.2 Data repository for DARIAH (OTHER)</span>  
<td> Alexander Bonvin
| Roberto Barbera  
</td>
|
<td>
|-
</td></tr>
! 12
<tr>
| Task 6.6 (DARIAH)  
<th> 11
| Decide about the best approach to integrate the application with EGI platforms and with the DARIAH gateway services. Implement the integration.&nbsp;  
</th>
| <span style="font-size: 12.8000001907349px; line-height: 19.2000007629395px; background-color: rgb(249, 249, 249);">D6.5 Final version of Multi-Source Distributed Real-Time Search and Information Retrieval application (OTHER)</span>  
<td> Task 6.5 (MoBrain)
| Tibor Kalman  
</td>
|
<td> Learn about the 'Accelerated Computing platform' of EGI&#160;(GPGPU facility) at the EGI Community Forum; Perform initial tests on it with GROMACS and AMBER.
|-
</td>
! 6  
<td> Initial tests on the 'Accelerated Computing platform' of&#160;EGI
| Task 6.10 (DM CC)  
</td>
| Collect details about the use cases from each CC member. This should cover: Details of the disaster event(s) to be simulated/predicted; details on required data; details on simulation applications, tool and gateways to interact with the data; necessary visualisation tools; implementation roadmap and timeline  
<td> Alexandre Bonvin, Peter Solagna
| Integrated information about the use cases that the CC members will work with  
</td>
| Simon Lin, Eric Yen  
<td> Depends on progress of Task JRA2.4
|
</td></tr>
|-
<tr>
! 6
<th> 4
| Task 6.10 (DM CC)  
</th>
| Planning participation and contributions to the 40th APAN meeting  
<td> Task 6.6 (DARIAH)
| <span style="font-size: 13.2799997329712px; line-height: 19.9200000762939px;">Contributions and meeting at the 40th APAN meeting (</span><span>[http://www.apan.net/meetings/KualaLumpur2015/ http://www.apan.net/meetings/KualaLumpur2015/])</span>  
</td>
| <span style="font-size: 13.2799997329712px;">Simon Lin, Eric Yen</span>  
<td>
|
<p>Prepare user survey to be used by the CC to collect needs and requirements from digital humanities communities and users.&#160;Interview leaders of relevant DARIAH WGs, run the survey in relevant groups  
|-
</p>
! 8
</td>
| Task 6.10 (DM CC)
<td> User survey and interviews conducted
| <br>
</td>
| <span style="font-size: 12.8000001907349px; line-height: 19.2000007629395px; background-color: rgb(249, 249, 249);">Specification of the web portals for tsunami wave propagation simulations and for WRF-based weather simulation</span>
<td> Karolj Skala, Davor Davidovic
| <span style="font-size: 13.2799997329712px;">Simon Lin, Eric Yen</span>
</td>
| The portals will be implemented and delivered as D6.9 in M14.
<td>
|}
</td></tr>
 
<tr>
[[Category:EGI-Engage]]
<th> 9
</th>
<td> Task 6.6 (DARIAH)&#160;
</td>
<td> Collect and analyse the outcome of the user survey and interviews, feed findings into CC activities (both technical and community related)&#160;
</td>
<td> Analysis of user interview and survey outcome
</td>
<td> Karolj Skala, Davor Davidovic
</td>
<td>
</td></tr>
<tr>
<th> 11
</th>
<td> Task 6.6 (DARIAH)
</td>
<td>
</td>
<td> <span style="font-size: 12.8000001907349px; line-height: 19.2000007629395px; background-color: rgb(249, 249, 249);">D6.2 Data repository for DARIAH (OTHER)</span>
</td>
<td> Roberto Barbera
</td>
<td>
</td></tr>
<tr>
<th> 12
</th>
<td> Task 6.6 (DARIAH)
</td>
<td> Decide about the best approach to integrate the application with EGI platforms and with the DARIAH gateway services. Implement the integration.&#160;
</td>
<td> <span style="font-size: 12.8000001907349px; line-height: 19.2000007629395px; background-color: rgb(249, 249, 249);">D6.5 Final version of Multi-Source Distributed Real-Time Search and Information Retrieval application (OTHER)</span>
</td>
<td> Tibor Kalman
</td>
<td>
</td></tr>
<tr>
<th> 6
</th>
<td> Task 6.10 (DM CC)
</td>
<td> Collect details about the use cases from each CC member. This should cover: Details of the disaster event(s) to be simulated/predicted; details on required data; details on simulation applications, tool and gateways to interact with the data; necessary visualisation tools; implementation roadmap and timeline
</td>
<td> Integrated information about the use cases that the CC members will work with
</td>
<td> Simon Lin, Eric Yen
</td>
<td>
</td></tr>
<tr>
<th> 6
</th>
<td> Task 6.10 (DM CC)
</td>
<td> Planning participation and contributions to the 40th APAN meeting
</td>
<td> <span style="font-size: 13.2799997329712px; line-height: 19.9200000762939px;">Contributions and meeting at the 40th APAN meeting (</span><span><a href="http://www.apan.net/meetings/KualaLumpur2015/">http://www.apan.net/meetings/KualaLumpur2015/</a>)</span>
</td>
<td> <span style="font-size: 13.2799997329712px;">Simon Lin, Eric Yen</span>
</td>
<td>
</td></tr>
<tr>
<th> 8
</th>
<td> Task 6.10 (DM CC)
</td>
<td> <br />
</td>
<td> <span style="font-size: 12.8000001907349px; line-height: 19.2000007629395px; background-color: rgb(249, 249, 249);">Specification of the web portals for tsunami wave propagation simulations and for WRF-based weather simulation</span>
</td>
<td> <span style="font-size: 13.2799997329712px;">Simon Lin, Eric Yen</span>
</td>
<td> The portals will be implemented and delivered as D6.9 in M14.
</td></tr></table>
<a _fcknotitle="true" href="Category:EGI-Engage">EGI-Engage</a>

Revision as of 13:30, 11 June 2015

EGI-Engage project: Main page WP1(NA1) WP3(JRA1) WP5(SA1) PMB Deliverables and Milestones Quality Plan Risk Plan Data Plan
Roles and
responsibilities
WP2(NA2) WP4(JRA2) WP6(SA2) AMB Software and services Metrics Project Office Procedures
 


This page is providing yearly activity plan for WP6 in PY1



YIN

Project month

Project Tasks

Work to be done

Goal 

(measurable)

Owner

(reponsible person)

Comments
1 Task 6.8

1) Portal Design Specification

2) Portal prototype

1) Agreement on task responsibilities of participating parties by May 2015

2) First version of the portal specification to be drafted by the end of Summer 2015

3) First prototype of the portal aims to be delivered by Dec 2015

  • Portal Design Specification: EISCAT (Ingemar Haggstrom)
  • Portal prototype SNIC (Ake Sandgren)
  • EGI contribution (Yin Chen)

1
2




3



4



5



6



7



8



9



10



11



12




ENOL

Project month

Project Tasks

Work to be done

Goal 

(measurable)

Owner

(reponsible person)

Comments
1 Task 6.2 Definition of the technical use cases support process Establishment of a procedure for handling use case support, RT queue for tracking use cases Gergely Sypos / Enol Fernandez
X Task 6.2 Pilot usage of EGI infrastructure by HBP XX XXX
XX Task 6.2 Pilot usage of EGI infrastructure by LOFAR/SKA XX XX
9 Task 6.7 Assisted pattern recognition tools integrated with EGI for citizen science XXX Jesús Marco/Fernando Aguilar
12 Task 6.7 Data flow handler and basic R tools to integrate and process data from Ecological Observatories on EGI XXX Jesús Marco/Fernando Aguilar)


DIEGO

Project month

Project Tasks

Work to be done

Goal 

(measurable)

Owner

(reponsible person)

Comments
12 Task 6.9 EPOS requirements analysis and outline of pilot use cases are agreed
  • AAI requirements analysed and the EPOS AAI architecture envisaged.
  • Basic multidisciplinary AAI use case defined: it deals with the discovery of heterogeneous data from the ICS-C portal
  • An extended, single discipline, computational oriented use case defined
Daniele Balio (EPOS/INGV), Diego Scardaci (EGI.eu/INFN)

1
2



3



4



5



6



7



8



9



10



11



12




GERGELY

Project month

Project Tasks

Work to be done

Goal 

(measurable)

Owner

(reponsible person)

Comments

3

Task 6.1

Define EGI's training plan for the 1st year of EGI-Engage

M6.1 Joint training programme for the first project year (With EUDAT, PRACE, CCs, NGIs, UCB)

Gergely Sipos

Document was delivered at the end of May: http://go.egi.eu/trainingplan

5

Task 6.1

Setup training VO on the Federated Cloud

Register training robot certificate, generate proxies for students and trainers

Prepare training materials for 3.5 course (slides + hands-on exercises incl. VM images and datasets) 

Test training material and setup by July 15, deliver courses in second part of July

Deliver two courses on EGI Federated Cloud at 'Software Carpentry workshop' (SAP, UK) and HPCS (Amsterdam)

Gergely Sipos

10

Task 6.1

Work with Resource providers of the training VO to identify suitable business model for continued provisioning of thevirtualised training e-infrastructure that can operate 24/7 to serve EGI-related courses and self-paced training needs.

Suitable business model for continued operation of the training VO in EGI

Gergely Sipos


10

Task 6.1

Prepare module based on the joint use case that has been identified and documented during the EGI-EUDAT meeting at the EGI Conference in Lisbon. (FedCloud, B2Find, B2Drop, B2Safe)

Joint training module with EUDAT 

Diego Scardaci

F2F delivery at the EGI Community Forum? 

8

Task 6.1

After the platform components are integrated and tested develop training for the NGI user support teams and EGI.eu staff on how to support long-tail users with the platform. 

Training module on the 'EGI long tail of science' platform

Diego Scardaci, Peter Solagna

F2F delivery at the EGI Community Forum?

8

Task 6.1

A module about security policy, procedures and interoperability solutions in the various e-infrastructures, with possible involvement of EUDAT. The content will be developed for a joint event that will be held in the autumn, then will be shared as a training module in the marketplace.


Joint event and training module with PRACE

Dave Kelsey

Event approx in October (date, venue TBD)

5

Task 6.1

The module will target those who prepare and those who endorse VM images for scientific/training purposes. The module will define the characteristics of ‘secure’ VM images, will teach how to prepare such images, and will demonstrate how to assess the security characteristics of such images. 


Training module on Virtual Machine preparation and certification in the EGI Federated Cloud.


Vincenzo Spinoso

To be developed by security experts funded in T6.1: CERN, CESNET, LIP, NIKHEF

10

Task 6.1

Training module on Incident handling in the EGI Federated Cloud. 

Dave Kelsey

To be developed by security experts funded in T6.1: CERN, CESNET, LIP, NIKHEF

F2F delivery at EGI Community Forum?

12

Task 6.1

Exploring possibility of training module developments with other tasks on the following topics:

1. Open Data Processing solution from EGI (by

members of task JRA2.1).

2. GPGPU-computing in EGI (by members of task

JRA2.4 and NGI-BG).

3. Deploying clouds and federated clouds for

scientific and educational purposes (by members of the Federated Cloud collaboration).

4. iRODS training (in collaboration with NGI-FR and

the DIRAC team).

Additional training modules

Gergely Sipos

F2F delivery at EGI Community Forum?

4 Task 6.1

Ensure that the Training Marketplace is used accross EGI, and that it can collect and provide the relevant details about events, content, etc and the impact.

Provide templates and surveys for EGI trainers to be able to collect relevant metrics. 

Mechanisms and tools to assess impact of training activities. Gergely Sipos
12 Task 6.3 (ELIXIR)

Collect use cases from ELIXIR-EXCELERATE, CC members, EGI members (e.g. GAPF VT), then select the most relevant ones for the CC to work with. Analyse use cases from the technical perspective to capture requirements for e-infra and ELXIR RI services. 

Life science requirements analysis and driver use case(s) with implementation roadmap are agreed

M6.3: Life science requirements analysis and driver use case(s) with implementation roadmap are agreed Tommi Nyronen
12 Task 6.4 (BBMRI)

Collect use cases from the BBMRI community and from CC members then select the most relevant ones for the CC to work with. Analyse use cases from the technical perspective to capture requirements for e-infra and BBMRI RI services. Design suitable technical architecture to address the requirements. 

M6.2: Security and privacy requirements and secure storage architectural design are agreed Petr Holub
7 Task 6.5 (MoBrain) Discuss options for the implementation of a fully integrated MoBrain portal (built on N4U and WeNMR technologies, considering work in WestLife VRE project). Reach agreement on the concept of the integrated portal and on CC partners' responsibilty for developing it. Agreement on the concept of the integrated portal and on CC partners' responsibilty for developing it. Alexander Bonvin
12 Task 6.5 (MoBrain) D6.4: Fully integrated MoBrain web portal (OTHER) Alexander Bonvin
11 Task 6.5 (MoBrain) Learn about the 'Accelerated Computing platform' of EGI (GPGPU facility) at the EGI Community Forum; Perform initial tests on it with GROMACS and AMBER. Initial tests on the 'Accelerated Computing platform' of EGI Alexandre Bonvin, Peter Solagna Depends on progress of Task JRA2.4
4 Task 6.6 (DARIAH)

Prepare user survey to be used by the CC to collect needs and requirements from digital humanities communities and users. Interview leaders of relevant DARIAH WGs, run the survey in relevant groups

User survey and interviews conducted Karolj Skala, Davor Davidovic
9 Task 6.6 (DARIAH)  Collect and analyse the outcome of the user survey and interviews, feed findings into CC activities (both technical and community related)  Analysis of user interview and survey outcome Karolj Skala, Davor Davidovic
11 Task 6.6 (DARIAH) D6.2 Data repository for DARIAH (OTHER) Roberto Barbera
12 Task 6.6 (DARIAH) Decide about the best approach to integrate the application with EGI platforms and with the DARIAH gateway services. Implement the integration.  D6.5 Final version of Multi-Source Distributed Real-Time Search and Information Retrieval application (OTHER) Tibor Kalman
6 Task 6.10 (DM CC) Collect details about the use cases from each CC member. This should cover: Details of the disaster event(s) to be simulated/predicted; details on required data; details on simulation applications, tool and gateways to interact with the data; necessary visualisation tools; implementation roadmap and timeline Integrated information about the use cases that the CC members will work with Simon Lin, Eric Yen
6 Task 6.10 (DM CC) Planning participation and contributions to the 40th APAN meeting Contributions and meeting at the 40th APAN meeting (<a href="http://www.apan.net/meetings/KualaLumpur2015/">http://www.apan.net/meetings/KualaLumpur2015/</a>) Simon Lin, Eric Yen
8 Task 6.10 (DM CC)
Specification of the web portals for tsunami wave propagation simulations and for WRF-based weather simulation Simon Lin, Eric Yen The portals will be implemented and delivered as D6.9 in M14.

<a _fcknotitle="true" href="Category:EGI-Engage">EGI-Engage</a>