Difference between revisions of "EGI-Engage:WP4-PY1-Roadmap"
(23 intermediate revisions by 6 users not shown) | |||
Line 29: | Line 29: | ||
|- | |- | ||
! 1 | ! 1 | ||
| Task 4. | | All WP4 tasks | ||
| <br> | | Collection of people names and population of mailing lists | ||
| <br> | | Communications in place | ||
| <br> | | T. Ferrari | ||
| COMPLETE | |||
|- | |||
! 2 | |||
| Task 4.2 | |||
| Survey on OCCI suport request for other CMFs | |||
| Definition of OCCI support roadmap | |||
| A. Lopez | |||
| Survey created sent to involved parties | |||
|- | |||
! 2 | |||
| Task 4.4 | |||
| Review of available technologies for using GPUs in grid and cloud | |||
Resume of EGI-Inspire GPGPU VT <br> | |||
| Kick-off and GPGPU VT handover meeting<br> | |||
| M.Verlato <br> | |||
| <br> | | <br> | ||
|- | |- | ||
! | ! 3<br> | ||
| Task 4.2 | | Task 4.2<br> | ||
| | | | ||
JRA activities presentation and collection of requirements. | |||
Review of OCCI 1.1 status and plans for OCCI 1.2. | |||
Setup communication channel for requirements | |||
| | | | ||
Discussion at IaaS session at EGI Conference | |||
Workplan and ETA for complete OCCI 1.1 support<br> | |||
RT requirements queue set up | |||
| A. Lopez<br> | |||
| OCCI Implementation status: https://wiki.egi.eu/wiki/Fedcloud-tf:WorkGroups:Scenario1#Servers | |||
|- | |||
! 3 | |||
| Task 4.4 <br> | |||
| Review of available technologies for using GPUs in grid and cloud | |||
Analysis of requirements from user communities <br> | |||
| Discussion at GPGPU session at EGI Conference <br> | |||
| M.Verlato<br> | |||
| <br> | |||
|- | |||
! 3 | |||
| Task 4.3 <br> | |||
| Preliminary Discussion about requirements and integration EGI-CANFAR<br> | |||
| Presentation about CANFAR at EGI conference <br> | |||
| G. Taffoni <br> S. Gaudet<br> | |||
| <br> | |||
|- | |- | ||
! | ! 4 | ||
| Task 4. | | Task 4.2 | ||
| | | | ||
OCCI 1.1 Feature freeze | |||
| N/A | |||
| | | | ||
| | | | ||
|- | |- | ||
! | ! 4 | ||
| Task 4.4 | | Task 4.4 <br> | ||
| | | End of review of available technologies for using GPUs in grid and cloud | ||
| | End of analysis of requirements from user communities <br> | ||
| | |||
| Technical report (to be included in Milestone 1.2 First intermediate report) and wiki pages <br> | |||
| M.Verlato<br> | |||
| <br> | |||
|- | |||
! 4 | |||
| Task 4.3 <br> | |||
| Discussion about requirements and integration EGI-CANFAR<br>Preliminary Integration Road map | |||
| discuss at IVOA interoperability meeting <br> | |||
| G. Taffoni <br> S. Gaudet<br> | |||
| <br> | | <br> | ||
|- | |- | ||
! | ! 6 | ||
| Task 4. | | Task 4.1 <br> | ||
| End of technical design Open Data Platform for EGI-Engage. | |||
| | | It should be clear how to integrate Open Data Platform with the existing EGI security model and what interfaces should be available. | ||
| | | Lukasz Dutka | ||
| <br> | | <br> | ||
|- | |- | ||
! | ! 6<br> | ||
| | | <br> | ||
| <br> | | <br> | ||
| <br> | | <br> | ||
Line 70: | Line 125: | ||
| <br> | | <br> | ||
|- | |- | ||
! 4 | ! 6 | ||
| Task 4.2<br> | |||
| | | | ||
Draft design of OCCI extension for creating snapshots | |||
| <br> | |||
| <br> | Draft design of OCCI extension for resizing running VMs | ||
| Internal drafts of OCCI extension<br> | |||
| A. Lopez<br> | |||
| <br> | | <br> | ||
|- | |- | ||
! | ! 6 | ||
| Task 4.3 | |||
| | | | ||
Collection of technical requirements for the integration of the D4SCIENCE and CANFAR cloud infrastructures | |||
Definition of "user stories" for interoperation with EUDAT, revision of AAI roadmaps and discussion of their interoperability | |||
| | |||
Cookbooks for EGI-EUDAT service interoperation | |||
D4SCIENCE and CANFAR integration roadmap | |||
| E. Fernandez | |||
| <br> | |||
|- | |||
! 6 | |||
| Task 4.3 <br> | |||
| CANFAR EGI Integration Roadmap | |||
| Deliverable 4.1 <br> | |||
| E. Fernandez <br> G. Taffoni <br> S. Gaudet | |||
| <br> | |||
|- | |||
! 7 | |||
| <br> | |||
| <br> | | <br> | ||
| <br> | | <br> | ||
Line 84: | Line 165: | ||
| <br> | | <br> | ||
|- | |- | ||
! | ! 7<br> | ||
| Task 4.2<br> | |||
| | |||
Draft of the design for VM relocation within sites.<br> | |||
| | | | ||
Internal draft for discussion. | |||
| | <br> | ||
| A. Lopez | |||
| <br> | | <br> | ||
|- | |- | ||
! 7 | ! 7 | ||
| | | Task 4.4 <br> | ||
| <br> | | Modification/configuration at site level (OS driver, hypervisor, CMF, VM images) for supporting GPUs in cloud | ||
| <br> | Definition of abstract GPU-related CREAM JDL attributes to be mapped in the supported batch systems <br> | ||
| <br> | |||
| Cloud site with working GPU and installation manual | |||
Update of the CREAM JDL specification document <br> | |||
| M.Verlato<br> | |||
| <br> | | <br> | ||
|- | |- | ||
! 8 | ! 8 | ||
| Task 4.1 | |||
| First pilot version available for public tests | |||
| Provisioning software for tests and getting first feedback from the potential users. | |||
| Lukasz Dutka | |||
| <br> | |||
|- | |||
! 9<br> | |||
| Task 4.2 | |||
| AppDB: design phase of the VM/brokering functionality.<br> | |||
| A design document describing the solution that will be followed for offering brokering functions to the users through the AppDB.<br> | |||
| | | | ||
M. Chatziangelou | |||
A. Lopez | |||
| <br> | | <br> | ||
|- | |- | ||
! 9 | ! 9 | ||
| Task 4.2<br> | |||
| | | | ||
| <br> | Final design of OCCI extension for creating snapshots. | ||
| <br> | |||
| <br> | Final design of OCCI extension for resizing running VMs. | ||
Candidate version of the design for VM relocation within sites. | |||
| | |||
Deliverable 4.2 (snapshots)<br> | |||
Deliverable 4.3 (resize)<br> | |||
Candidate document for final review (relocation)<br> | |||
| A. Lopez<br> | |||
| <br> | |||
|- | |||
! 10 | |||
| Task 4.2 | |||
| OCCI support for Azure backend | |||
| New rOCCI release, supporting MS Azure. | |||
| A. Lopez | |||
| | |||
|- | |||
! 10 | |||
| Task 4.4 <br> | |||
| First step of integration with FedCloud (AppDB, accounting, brokering, ...) | |||
First implementation of GPU support in CREAM <br> | |||
| Tools and configuration manual, possible some demonstration | |||
GPU-enabled CREAM prototype released for testing <br> | |||
| M.Verlato<br> | |||
| <br> | | <br> | ||
|- | |- | ||
! 10 | ! 10 | ||
| | | Task 4.1 | ||
| First Open Data Pilot Deployment | |||
| The software realizing minimal valuable use case should be deployed as a pilot. | |||
| Lukasz Dutka | |||
| <br> | |||
|- | |||
! 11 | |||
| <br> | |||
| <br> | | <br> | ||
| <br> | | <br> | ||
Line 119: | Line 258: | ||
| <br> | | <br> | ||
|- | |- | ||
! | ! 12<br> | ||
| Task 4.2<br> | |||
| | |||
Initial implementation of OCCI extensions. | |||
Final design of interactions to relocate running VMs within sites. | |||
OCCI 1.2 preview release | |||
| | | | ||
| <br> | OCCI support for resizing and/or snapshots | ||
| <br> | |||
| <br> | Deliverable 4.4 (relocation) | ||
Initial OCCI support for OCCI 1.2 | |||
| A. Lopez<br> | |||
| <br> | |||
|- | |||
! 12 | |||
| Task 4.3 <br> | |||
| First step of integration with FedCloud | |||
| Initial tests on SSO and VOSpace | |||
<br> | |||
| G. Taffoni<br> S. Gaudet | |||
| <br> | | <br> | ||
|- | |- | ||
! 12 | ! 12 | ||
| | | Task 4.4 <br> | ||
| <br> | | Revision of available technologies, further improvement and extension of supporting GPUs in FedCloud | ||
| <br> | End of testing of GPU-enabled CREAM prototype and feedback collection <br> | ||
| <br> | |||
| Technical report contributing to Project Periodic Report (first period) | |||
Official final CREAM release with full GPU support <br> | |||
| M.Verlato<br> | |||
| <br> | | <br> | ||
|} | |} | ||
[[Category:EGI-Engage]] | [[Category:EGI-Engage]] |
Latest revision as of 11:44, 3 June 2015
This page is providing yearly activity plan for WP4 in PY1
Project month |
Project Tasks |
Work to be done |
Goal (measurable) |
Owner (reponsible person) |
Comments |
---|---|---|---|---|---|
1 | All WP4 tasks | Collection of people names and population of mailing lists | Communications in place | T. Ferrari | COMPLETE |
2 | Task 4.2 | Survey on OCCI suport request for other CMFs | Definition of OCCI support roadmap | A. Lopez | Survey created sent to involved parties |
2 | Task 4.4 | Review of available technologies for using GPUs in grid and cloud
Resume of EGI-Inspire GPGPU VT |
Kick-off and GPGPU VT handover meeting |
M.Verlato |
|
3 |
Task 4.2 |
JRA activities presentation and collection of requirements. Review of OCCI 1.1 status and plans for OCCI 1.2. Setup communication channel for requirements |
Discussion at IaaS session at EGI Conference Workplan and ETA for complete OCCI 1.1 support RT requirements queue set up |
A. Lopez |
OCCI Implementation status: https://wiki.egi.eu/wiki/Fedcloud-tf:WorkGroups:Scenario1#Servers |
3 | Task 4.4 |
Review of available technologies for using GPUs in grid and cloud
Analysis of requirements from user communities |
Discussion at GPGPU session at EGI Conference |
M.Verlato |
|
3 | Task 4.3 |
Preliminary Discussion about requirements and integration EGI-CANFAR |
Presentation about CANFAR at EGI conference |
G. Taffoni S. Gaudet |
|
4 | Task 4.2 |
OCCI 1.1 Feature freeze |
N/A | ||
4 | Task 4.4 |
End of review of available technologies for using GPUs in grid and cloud
End of analysis of requirements from user communities |
Technical report (to be included in Milestone 1.2 First intermediate report) and wiki pages |
M.Verlato |
|
4 | Task 4.3 |
Discussion about requirements and integration EGI-CANFAR Preliminary Integration Road map |
discuss at IVOA interoperability meeting |
G. Taffoni S. Gaudet |
|
6 | Task 4.1 |
End of technical design Open Data Platform for EGI-Engage. | It should be clear how to integrate Open Data Platform with the existing EGI security model and what interfaces should be available. | Lukasz Dutka | |
6 |
|||||
6 | Task 4.2 |
Draft design of OCCI extension for creating snapshots Draft design of OCCI extension for resizing running VMs |
Internal drafts of OCCI extension |
A. Lopez |
|
6 | Task 4.3 |
Collection of technical requirements for the integration of the D4SCIENCE and CANFAR cloud infrastructures Definition of "user stories" for interoperation with EUDAT, revision of AAI roadmaps and discussion of their interoperability |
Cookbooks for EGI-EUDAT service interoperation D4SCIENCE and CANFAR integration roadmap |
E. Fernandez | |
6 | Task 4.3 |
CANFAR EGI Integration Roadmap | Deliverable 4.1 |
E. Fernandez G. Taffoni S. Gaudet |
|
7 | |||||
7 |
Task 4.2 |
Draft of the design for VM relocation within sites. |
Internal draft for discussion.
|
A. Lopez | |
7 | Task 4.4 |
Modification/configuration at site level (OS driver, hypervisor, CMF, VM images) for supporting GPUs in cloud
Definition of abstract GPU-related CREAM JDL attributes to be mapped in the supported batch systems |
Cloud site with working GPU and installation manual
Update of the CREAM JDL specification document |
M.Verlato |
|
8 | Task 4.1 | First pilot version available for public tests | Provisioning software for tests and getting first feedback from the potential users. | Lukasz Dutka | |
9 |
Task 4.2 | AppDB: design phase of the VM/brokering functionality. |
A design document describing the solution that will be followed for offering brokering functions to the users through the AppDB. |
M. Chatziangelou A. Lopez |
|
9 | Task 4.2 |
Final design of OCCI extension for creating snapshots. Final design of OCCI extension for resizing running VMs. Candidate version of the design for VM relocation within sites. |
Deliverable 4.2 (snapshots) Deliverable 4.3 (resize) Candidate document for final review (relocation) |
A. Lopez |
|
10 | Task 4.2 | OCCI support for Azure backend | New rOCCI release, supporting MS Azure. | A. Lopez | |
10 | Task 4.4 |
First step of integration with FedCloud (AppDB, accounting, brokering, ...)
First implementation of GPU support in CREAM |
Tools and configuration manual, possible some demonstration
GPU-enabled CREAM prototype released for testing |
M.Verlato |
|
10 | Task 4.1 | First Open Data Pilot Deployment | The software realizing minimal valuable use case should be deployed as a pilot. | Lukasz Dutka | |
11 | |||||
12 |
Task 4.2 |
Initial implementation of OCCI extensions. Final design of interactions to relocate running VMs within sites. OCCI 1.2 preview release |
OCCI support for resizing and/or snapshots Deliverable 4.4 (relocation) Initial OCCI support for OCCI 1.2 |
A. Lopez |
|
12 | Task 4.3 |
First step of integration with FedCloud | Initial tests on SSO and VOSpace
|
G. Taffoni S. Gaudet |
|
12 | Task 4.4 |
Revision of available technologies, further improvement and extension of supporting GPUs in FedCloud
End of testing of GPU-enabled CREAM prototype and feedback collection |
Technical report contributing to Project Periodic Report (first period)
Official final CREAM release with full GPU support |
M.Verlato |