EGI-Engage:Deliverables and Milestones
Jump to navigation
Jump to search
Deliverables
Milestones
Deliverables
Code | Title | WP(s) | Lead Participant | Type | Dissemination level | Delivery PM | Description |
---|---|---|---|---|---|---|---|
D 1.1 | Quality plan for Period 1 | WP 1 | EGI.eu | R | PU | M03 | |
D 2.1 | Communications, Dissemination and Engagement Strategy | WP 2 | EGI.eu | R | PU | M03 | |
D 2.2 | Master Model for SME engagement | WP 2 | EGI.eu | R | PU | M06 | |
D 2.3 | Concept of EGI Marketplace | WP 2 | SWING | R | PU | M06 | |
D 2.4 | Data Management Plan | WP 2 | EGI.eu | R | PU | M06 | |
D 3.1 | Technical design of the new Accounting Portal and implementation plan | WP 3 | CSIC | R | PU | M06 | |
D 4.1 | CANFAR integration roadmap | WP 4 | INFN | R | PU | M06 | |
D 1.2 | Risk analysis and risk response for Period 1 | WP 1 | EGI.eu | R | PU | M08 | |
D 4.2 | VM snapshot support: OCCI extension, final specification | WP 4 | CSIC | OTHER | PU | M09 | |
D 4.3 | Resource template changes: OCCI extension, final specification | WP 4 | CSIC | OTHER | PU | M09 | |
D 6.1 | Assisted pattern recognition tools integrated with EGI for citizen science | WP 6 | CSIC | OTHER | PU | M09 | |
D 6.2 | Data repository for DARIAH | WP 6 | INFN | OTHER | PU | M11 | |
D 2.5 | EGI Governance: Analysis and Recommendations | WP 2 | EGI.eu | R | PU | M12 | |
D 2.6 | Report on data sharing policies and legal framework in fishery and marine sciences data sector | WP 2 | FAO | R | PU | M12 | |
D 2.7 | Market Report on the fishery and marine sciences data sector | WP 2 | Engineering | R | PU | M12 | |
D 3.2 | Design of the EGI Service Registry and Marketplace | WP 3 | SWING | R | PU | M12 | |
D 3.3 | Accounting Repository release | WP 3 | STFC | OTHER | PU | M12 | |
D 3.4 | First release of the operational tools WP 3 | CNRS | OTHER | PU | M12 | ||
D 4.4 | Relocating VM instances between providers, final specification | WP 4 | CSIC | OTHER | PU | M12 | |
D 4.5 | Deployment of a gCube release with Federated Cloud support | WP 4 | Engineering | OTHER | PU | M12 | |
D 6.3 | Production portal for EISCAT_3D | WP 6 | EISCAT | OTHER | PU | M12 | |
D 6.4 | Fully integrated MoBRAIN web portal | WP 6 | GNUBILA | OTHER | PU | M12 | |
D 6.5 | Final version of Multi-Source Distributed Real-Time Search and Information Retrieval application | WP 6 | GWDG | OTHER | PU | M12 | |
D 6.6 | Data flow handler and basic R tools to integrate and process data from Ecological Observatories on EGI | WP 6 | CSIC | DEM | PU | M12 | |
D 6.7 | Implementation and evaluation of AMBER and/or GROMACS | WP 6 | CIRMMP | R | PU | M13 | |
D 1.3 | Report of quality status and quality plan for Period 2 | WP 1 | EGI.eu | R | PU | M14 | |
D 3.5 | First release of the new Accounting Portal deployed in production | WP 3 | CSIC | OTHER | PU | M14 | |
D 6.8 | Analysis of requirements on biobank and study workflows | WP 6 | BBMRI ERIC | R | PU | M14 | |
D 6.9 | web portals for tsunami wave propagation simulations and for WRF-based weather simulation | WP 6 | AS | OTHER | PU | M14 | |
D 2.8 | Communications, Dissemination and Engagement Report and Updated Strategy | WP 2 | EGI.eu | R | PU | M15 | |
D 2.9 | EGI Sustainability and Business Development Plan | WP 2 | EGI.eu | R | PU | M15 | |
D 3.6 | Analysis on techniques to manage big data on the EGI accounting system | WP 3 | STFC | R | PU | M15 | |
D 4.6 | e-Infrastructures integration report | WP 4 | INFN | R | PU | M15 | |
D 5.1 | Report on the evolution of the EGI Operations | WP 5 | EGI.eu | R | PU | M15 | |
D 5.2 | Platforms for the long-tail of science | WP 5 | CNR | R | PU | M15 | |
D 6.10 | Infrastructure tests and best usage practices for life science service providers | WP 6 | CSC | R | PU | M15 | |
D 6.11 | Security toolset release for BBMRI-ERIC | WP 6 | SNIC/KTH | OTHER | PU | M15 | |
D 6.12 | GPGPU-enabled web portal(s) for MoBrain | WP 6 | CIRMMP | OTHER | PU | M16 | |
D 2.10 | Market Analysis Report of selected sectors | WP 2 | GRNET | R | PU | M18 | |
D 3.7 | First release of the EGI Service Registry and Marketplace prototype | WP 3 | SWING | DEM | PU | M18 | |
D 6.13 | EPOS EGI pilot incorporating data retrieval, transfer and linkage | WP 6 | SURFsara/KNMI | DEM | PU | M18 | |
D 1.4 | Risk analysis and risk response for Period 2 | WP 1 | EGI.eu | R | PU | M20 | |
D 3.8 | First data accounting prototype | WP 3 | STFC | DEM | PU | M20 | |
D 4.7 | Open Data Platform First Prototype | WP 4 | CYFRONET | DEM | PU | M20 | |
D 6.14 | Scipion cloud deployment for MoBrain | WP 6 | CSIC | OTHER | PU | M21 | |
D 2.11 | Cross-border procurement of e-Infrastructure services: Opportunities, Barriers, Use cases, Best Practices | WP 2 | CERN | R | PU | M24 | |
D 3.9 | Identity Management for Distributed User Communities | WP 3 | GRNET | R | PU | M24 | |
D 3.10 | Second release of the new Accounting Portal deployed in production | WP 3 | CSIC | OTHER | PU | M24 | |
D 3.11 | Second release of the operational tools | WP 3 | CNRS | OTHER | PU | M24 | |
D 3.12 | Second release of the Accounting Repository | WP 3 | STFC | OTHER | PU | M24 | |
D 6.15 | Demonstrator for ELIXIR workflows implemented in the EGI Federated cloud | WP 6 | CESNET | DEM | PU | M24 | |
D 6.16 | Evaluated cloud environment and demonstrator of analysis workflow for biobank studies | WP 6 | BBMRI ERIC | DEM | PU | M24 | |
D 6.17 | Production level gateway for Arts and Humanities | WP 6 | MTA SZTAKI | OTHER | PU | M24 | |
D 6.18 | Report on the installed LifeWatch applications and their usage record | WP 6 | CSIC | R | PU | M24 | |
D 6.19 | EPOS EGI pilot integrating computational resources and services | WP 6 | CYFRONET | DEM | PU | M24 | |
D 6.20 | Application of the simulation portals for scientific scenario in disaster mitigation | WP 6 | AS | DEM | PU | M24 | |
D 5.3 | Evolution of security policies, procedures and best practices | WP 5 | STFC | R | PU | M25 | |
D 3.13 | Second release of the EGI Service Registry and Marketplace prototype | WP 3 | SWING | DEM | PU | M26 | |
D 3.14 | Report on Data Accounting | WP 3 | STFC | R | PU | M27 | |
D 4.8 | Cross-infrastructure case studies report | WP 4 | INFN | R | PU | M27 | |
D 2.12 | EGI Governance: Report on Adoption | WP 2 | EGI.eu | R | PU | M28 | |
D 3.15 | Second data accounting prototype | WP 3 | STFC | DEM | PU | M28 | |
D 3.16 | Final report on EGI Service Registry and Marketplace | WP 3 | SWING | R | PU | M28 | |
D 6.21 | Second version of enhanced portal for EISCAT_3D | WP 6 | EISCAT | OTHER | PU | M28 | |
D 1.5 | Report of quality status for Period 2 | WP 1 | EGI.eu | R | PU | M29 | |
D 4.9 | Open Data Platform: Demonstrator, Experience Report and Use Cases | WP 4 | CYFRONET | R | PU | M29 | |
D 6.22 | Design larger scale multi-hazards simulation attempting to reduce the uncertainty of climate change assessment | WP 6 | AS | DEM | PU | M29 | |
D 2.13 | EGI Sustainability and Business Development Plan | WP 2 | EGI.eu | R | PU | M30 | |
D 2.14 | Final Report on Communications, Dissemination and Engagement | WP 2 | EGI.eu | R | PU | M30 | |
D 3.17 | Final release of the accounting repository | WP 3 | STFC | OTHER | PU | M30 | |
D 3.18 | Final release of the Operational tools | WP 3 | CNRS | OTHER | PU | M30 | |
D 3.19 | Final release of the new Accounting Portal deployed in production | WP 3 | CSIC | OTHER | PU | M30 | |
D 4.10 | Final CANFAR integration release | WP 4 | NFN | DEM | PU | M30 | |
D 5.4 | Status report and evolution of operations after the project | WP 5 | EGI.eu | R | PU | M30 | |
D 6.23 | Report on evaluation of EPOS EGI pilot studies | WP 6 | INFN/INGV | R | PU | M30 |
Milestones
Milestone | Title | Related WP | Delivery PM | Means of verification |
---|---|---|---|---|
M 1.1 | Execution plan | WP 1 | M02 | Staff for each partner per each task is identified and communicated to the project office, the reporting lines, the project management and governance structures are defined and approved |
M 1.2 | First intermediate report | WP 1 | M08 | A quarterly report describing the status of each activity within the project (M01 – M07) is approved |
M 1.3 | Second intermediate report | WP 1 | M23 | A quarterly report describing the status of each activity within the project (M16 – M22) is approved |
M 2.1 | Website and templates | WP 2 | M01 | Project information is available on the Web and document/presentation templates are defined |
M 2.2 | Technical Forum 2015 is organised | WP 2 | M12 | The event took place and a report is published with the main indicators including user satisfaction |
M 2.3 | The EGI website is reviewed | WP 2 | M13 | The website is reviewed and a number of recommended changes have been applied |
M 2.4 | EGI Service management practices are audited | WP 2 | M15 | EGI service management practices are audited by an external FitSM consultant |
M 2.5 | Technical Forum 2016 is organised | WP 2 | M24 | The event took place and a report is published with the main indicators including user satisfaction |
M 2.6 | The EGI website is reviewed | WP 2 | M25 | The website is reviewed and a number of recommended changes have been applied |
M 2.7 | EGI Service management practices are audited | WP 2 | M29 | EGI service management practices are audited by an external FitSM consultants |
M 3.1 | Operational tools development roadmap agreed | WP 3 | M04 | The operational tools development roadmap is agreed |
M 3.2 | User requirements on data accounting collected | WP 3 | M12 | The user requirements on Data Accounting are agreed and documented |
M 3.3 | Operational tools development roadmap revised | WP 3 | M16 | The operational tools development roadmap is revised and documented |
M 3.4 | Pilot services and best practices to enable federated AAI solutions released | WP 3 | M16 | Pilot services and best practices to enable federated AAI solutions for EGI services are available for the VREs and CCs |
M 3.5 | The first version of the EGI Marketplace is demonstrated | WP 3, WP 2 | M18 | Demo showcased at EGI Technical Forum and made available online |
M 3.6 | The second version of the EGI Marketplace is demonstrated | WP 3, WP 2 | M26 | Demo showcased at EGI Technical Forum and made available online |
M 4.1 | Open Data Platform: requirements and implementation plans | WP 4 | M06 | Final selection of the technologies used to create Open Data Access Platform agreed. The report includes requirements and use cases from selected communities interested in open data |
M 4.2 | Launch of call for cross e-Infrastructure case studies | WP 4 | M15 | A call for participation for cross e-Infrastructure case studies is published |
M 4.3 | Open Data Platform in the Production | WP 4 | M30 | The Open Data Platform is released in the production environment |
M 5.1 | Platform for the long-tail of science is available | WP 5 | M10 | The services to enable easy access to EGI resources are production-ready. |
M 5.2 | e-CEO challenges run on EGI resources | WP 5 | M15 | The e-CEO tool for the ESA data challenge is using also EGI resources to run the data analysis tasks |
M 5.3 | VREs for the fishery and marine sciences community are deployed in production | WP 5 | M18 | Services for the fishery and marine sciences are available and production-ready on EGI resources |
M 6.1 | Joint training program for the first period is agreed | WP 6 | M03 | The plan is defined by the competence centres, the partner e-Infrastructures and partner projects of EGI-Engage |
M 6.2 | Security and privacy requirements and secure storage architectural design are agreed | WP 6 | M06 | Requirements are approved by the BBMRI Research Infrastructure community and the developers of the secure storage solution verified and accepted the design |
M 6.3 | Life science requirements analysis and driver use case(s) with implementation roadmap are agreed | WP 6 | M12 | Requirements are approved by the ELIXIR Research Infrastructure community |
M 6.4 | EPOS requirements analysis and outline of pilot use cases are agreed | WP 6 | M12 | Requirements and pilot use cases are approved by the EPOS Research Infrastructure community |
M 6.5 | Joint training program for the second period is agreed | WP 6 | M15 | The plan is endorsed by the competence centres, the partner e-Infrastructures and partner projects of EGI-Engage |