Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "EGI-Engage:Deliverables and Milestones"

From EGIWiki
Jump to navigation Jump to search
Line 1: Line 1:
{{Template:EGI-Engage menubar}} {{TOC_right}}  
{{Template:EGI-Engage menubar}} {{TOC_right}}  


<br>
<br>  


= Deliverables<br> =
= Deliverables<br> =


{| class="wikitable"
{| class="wikitable"
Line 9: Line 9:
! Code  
! Code  
! Title  
! Title  
! WP(s)
! Lead Participant
! Type
! Dissemination level
! Delivery PM  
! Delivery PM  
! Description<br>
! Description<br>
|-
|-
! D1.1<br>
!D 1.1
| Quality plan for Period 1 (R)<br>
|Quality plan for Period 1
| M03<br>
|WP 1
| <br>
|EGI.eu
|R
|PU
|M03
|
|-
!D 2.1
|Communications, Dissemination and Engagement Strategy
|WP 2
|EGI.eu
|R
|PU
|M03
|
|-
|-
! D1.2<br>
!D 2.2
| Risk analysis and risk response for Period 1 (R)<br>
|Master Model for SME engagement
| M08<br>
|WP 2
| <br>
|EGI.eu
|R
|PU
|M06
|
|-
|-
! D1.3<br>
!D 2.3
| Report of quality status and quality plan for Period 2 (R)<br>
|Concept of EGI Marketplace
| M14<br>
|WP 2
| <br>
|SWING
|R
|PU
|M06
|
|-
|-
! D1.4<br>
!D 2.4
| Risk analysis and risk response for Period 2 (R)<br>
|Data Management Plan
| M20<br>
|WP 2
| <br>
|EGI.eu
|R
|PU
|M06
|
|-
|-
! D1.5<br>
!D 3.1
| Report of quality status for Period 2 (R)<br>
|Technical design of the new Accounting Portal and implementation plan
| M29<br>
|WP 3
| <br>
|CSIC
|}
|R
 
|PU
<br>
|M06
 
|
<br>
 
= Milestones<br> =
 
{| class="wikitable"
|-
|-
! Milestone
!D 4.1
! Title
|CANFAR integration roadmap
! Related WP  
|WP 4
! Delivery PM
|INFN
! Means of verification
|R
|PU
|M06
|
|-
|-
! M 1.1
!D 1.2
|Execution plan
|Risk analysis and risk response for Period 1
|WP 1
|WP 1
|M02
|EGI.eu
|Staff for each partner per each task is identified and communicated to the project office, the reporting lines, the project management and governance structures are defined and approved
|R
|PU
|M08
|
|-
!D 4.2
|VM snapshot support: OCCI extension, final specification
|WP 4
|CSIC
|OTHER
|PU
|M09
|
|-
!D 4.3
|Resource template changes: OCCI extension, final specification
|WP 4
|CSIC
|OTHER
|PU
|M09
|
|-
!D 6.1
|Assisted pattern recognition tools integrated with EGI for citizen science
|WP 6
|CSIC
|OTHER
|PU
|M09
|
|-
!D 6.2
|Data repository for DARIAH
|WP 6
|INFN
|OTHER
|PU
|M11
|
|-
!D 2.5
|EGI Governance: Analysis and Recommendations
|WP 2
|EGI.eu
|R
|PU
|M12
|
|-
!D 2.6
|Report on data sharing policies and legal framework in fishery and marine sciences data sector
|WP 2
|FAO
|R
|PU
|M12
|
|-
!D 2.7
|Market Report on the fishery and marine sciences data sector
|WP 2
|Engineering
|R
|PU
|M12
|
|-
!D 3.2
|Design of the EGI Service Registry and Marketplace
|WP 3
|SWING
|R
|PU
|M12
|
|-
!D 3.3
|Accounting Repository release
|WP 3
|STFC
|OTHER
|PU
|M12
|
|-
!D 3.4
|First release of the operational tools WP 3
|CNRS
|OTHER
|PU
|M12
|
|-
!D 4.4
|Relocating VM instances between providers, final specification
|WP 4
|CSIC
|OTHER
|PU
|M12
|
|-
!D 4.5
|Deployment of a gCube release with Federated Cloud support
|WP 4
|Engineering
|OTHER
|PU
|M12
|
|-
!D 6.3
|Production portal for EISCAT_3D
|WP 6
|EISCAT
|OTHER
|PU
|M12
|
|-
!D 6.4
|Fully integrated MoBRAIN web portal
|WP 6
|GNUBILA
|OTHER
|PU
|M12
|
|-
|-
!M 1.2
!D 6.5
|First intermediate report
|Final version of Multi-Source Distributed Real-Time Search and Information Retrieval application
|WP 6
|GWDG
|OTHER
|PU
|M12
|
|-
!D 6.6
|Data flow handler and basic R tools to integrate and process data from Ecological Observatories on EGI
|WP 6
|CSIC
|DEM
|PU
|M12
|
|-
!D 6.7
|Implementation and evaluation of AMBER and/or GROMACS
|WP 6
|CIRMMP
|R
|PU
|M13
|
|-
!D 1.3
|Report of quality status and quality plan for Period 2
|WP 1
|WP 1
|M08
|EGI.eu
|A quarterly report describing the status of each activity within the project (M01 – M07) is approved
|R
|PU
|M14
|-
!D 3.5
|First release of the new Accounting Portal deployed in production
|WP 3
|CSIC
|OTHER
|PU
|M14
|
|-
|-
!M 1.3
!D 6.8
|Second intermediate report
|Analysis of requirements on biobank and study workflows
|WP 1
|WP 6
|M23
|BBMRI ERIC
|A quarterly report describing the status of each activity within the project (M16 – M22) is approved
|R
|PU
|M14
|
|-
!D 6.9
|web portals for tsunami wave propagation simulations and for WRF-based weather simulation
|WP 6
|AS
|OTHER
|PU
|M14
|
|-
|-
!M 2.1
!D 2.8
|Website and templates
|Communications, Dissemination and Engagement Report and Updated Strategy
|WP 2
|WP 2
|M01
|EGI.eu
|Project information is available on the Web and document/presentation templates are defined
|R
|PU
|M15
|
|-
|-
!M 2.2
!D 2.9
|Technical Forum 2015 is organised
|EGI Sustainability and Business Development Plan
|WP 2
|WP 2
|M12
|EGI.eu
|The event took place and a report is published with the main indicators including user satisfaction
|R
|PU
|M15
|
|-
!D 3.6
|Analysis on techniques to manage big data on the EGI accounting system
|WP 3
|STFC
|R
|PU
|M15
|
|-
!D 4.6
|e-Infrastructures integration report
|WP 4
|INFN
|R
|PU
|M15
|
|-
!D 5.1
|Report on the evolution of the EGI Operations
|WP 5
|EGI.eu
|R
|PU
|M15
|
|-
!D 5.2
|Platforms for the long-tail of science
|WP 5
|CNR
|R
|PU
|M15
|
|-
!D 6.10
|Infrastructure tests and best usage practices for life science service providers
|WP 6
|CSC
|R
|PU
|M15
|
|-
!D 6.11
|Security toolset release for BBMRI-ERIC
|WP 6
|SNIC/KTH
|OTHER
|PU
|M15
|
|-
!D 6.12
|GPGPU-enabled web portal(s) for MoBrain
|WP 6
|CIRMMP
|OTHER
|PU
|M16
|
|-
|-
!M 2.3
!D 2.10
|The EGI website is reviewed
|Market Analysis Report of selected sectors
|WP 2
|WP 2
|M13
|GRNET
|The website is reviewed and a number of recommended changes have been applied
|R
|PU
|M18
|
|-
|-
!M 2.4
!D 3.7
|EGI Service management practices are audited
|First release of the EGI Service Registry and Marketplace prototype
|WP 3
|SWING
|DEM
|PU
|M18
|
|-
!D 6.13
|EPOS EGI pilot incorporating data retrieval, transfer and linkage
|WP 6
|SURFsara/KNMI
|DEM
|PU
|M18
|
|-
!D 1.4
|Risk analysis and risk response for Period 2
|WP 1
|EGI.eu
|R
|PU
|M20
|
|-
!D 3.8
|First data accounting prototype
|WP 3
|STFC
|DEM
|PU
|M20
|
|-
!D 4.7
|Open Data Platform First Prototype
|WP 4
|CYFRONET
|DEM
|PU
|M20
|
|-
!D 6.14
|Scipion cloud deployment for MoBrain
|WP 6
|CSIC
|OTHER
|PU
|M21
|
|-
!D 2.11
|Cross-border procurement of e-Infrastructure services: Opportunities, Barriers, Use cases, Best Practices
|WP 2
|WP 2
|M15
|CERN
|EGI service management practices are audited by an external FitSM consultant
|R
|PU
|M24
|
|-
!D 3.9
|Identity Management for Distributed User Communities
|WP 3
|GRNET
|R
|PU
|M24
|
|-
!D 3.10
|Second release of the new Accounting Portal deployed in production
|WP 3
|CSIC
|OTHER
|PU
|M24
|
|-
!D 3.11
|Second release of the operational tools
|WP 3
|CNRS
|OTHER
|PU
|M24
|
|-
!D 3.12
|Second release of the Accounting Repository
|WP 3
|STFC
|OTHER
|PU
|M24
|
|-
!D 6.15
|Demonstrator for ELIXIR workflows implemented in the EGI Federated cloud
|WP 6
|CESNET
|DEM
|PU
|M24
|
|-
!D 6.16
|Evaluated cloud environment and demonstrator of analysis workflow for biobank studies
|WP 6
|BBMRI ERIC
|DEM
|PU
|M24
|
|-
!D 6.17
|Production level gateway for Arts and Humanities
|WP 6
|MTA SZTAKI
|OTHER
|PU
|M24
|
|-
!D 6.18
|Report on the installed LifeWatch applications and their usage record
|WP 6
|CSIC
|R
|PU
|M24
|
|-
!D 6.19
|EPOS EGI pilot integrating computational resources and services
|WP 6
|CYFRONET
|DEM
|PU
|M24
|
|-
!D 6.20
|Application of the simulation portals for scientific scenario in disaster mitigation
|WP 6
|AS
|DEM
|PU
|M24
|
|-
!D 5.3
|Evolution of security policies, procedures and best practices
|WP 5
|STFC
|R
|PU
|M25
|
|-
!D 3.13
|Second release of the EGI Service Registry and Marketplace prototype
|WP 3
|SWING
|DEM
|PU
|M26
|
|-
!D 3.14
|Report on Data Accounting
|WP 3
|STFC
|R
|PU
|M27
|
|-
!D 4.8
|Cross-infrastructure case studies report
|WP 4
|INFN
|R
|PU
|M27
|
|-
|-
!M 2.5
!D 2.12
|Technical Forum 2016 is organised
|EGI Governance: Report on Adoption
|WP 2
|WP 2
|M24
|EGI.eu
|The event took place and a report is published with the main indicators including user satisfaction
|R
|PU
|M28
|
|-
!D 3.15
|Second data accounting prototype
|WP 3
|STFC
|DEM
|PU
|M28
|
|-
|-
!M 2.6
!D 3.16
|The EGI website is reviewed
|Final report on EGI Service Registry and Marketplace
|WP 3
|SWING
|R
|PU
|M28
|
|-
!D 6.21
|Second version of enhanced portal for EISCAT_3D
|WP 6
|EISCAT
|OTHER
|PU
|M28
|
|-
!D 1.5
|Report of quality status for Period 2
|WP 1
|EGI.eu
|R
|PU
|M29
|
|-
!D 4.9
|Open Data Platform: Demonstrator, Experience Report and Use Cases
|WP 4
|CYFRONET
|R
|PU
|M29
|
|-
!D 6.22
|Design larger scale multi-hazards simulation attempting to reduce the uncertainty of climate change assessment
|WP 6
|AS
|DEM
|PU
|M29
|
|-
!D 2.13
|EGI Sustainability and Business Development Plan
|WP 2
|WP 2
|M25
|EGI.eu
|The website is reviewed and a number of recommended changes have been applied
|R
|PU
|M30
|
|-
|-
!M 2.7
!D 2.14
|EGI Service management practices are audited
|Final Report on Communications, Dissemination and Engagement
|WP 2
|WP 2
|M29
|EGI.eu
|EGI service management practices are audited by an external FitSM consultants
|R
|PU
|M30
|
|-
|-
!M 3.1
!D 3.17
|Operational tools development roadmap agreed
|Final release of the accounting repository
|WP 3
|WP 3
|M04
|STFC
|The operational tools development roadmap is agreed
|OTHER
|PU
|M30
|
|-
|-
!M 3.2
!D 3.18
|User requirements on data accounting collected
|Final release of the Operational tools
|WP 3
|WP 3
|M12
|CNRS
|The user requirements on Data Accounting are agreed and documented
|OTHER
|PU
|M30
|
|-
|-
!M 3.3
!D 3.19
|Operational tools development roadmap revised
|Final release of the new Accounting Portal deployed in production
|WP 3
|WP 3
|M16
|CSIC
|The operational tools development roadmap is revised and documented
|OTHER
|PU
|M30
|
|-
|-
!M 3.4
!D 4.10
|Pilot services and best practices to enable federated AAI solutions released
|Final CANFAR integration release
|WP 3
|WP 4
|M16
|NFN
|Pilot services and best practices to enable federated AAI solutions for EGI services are available for the VREs and CCs
|DEM
|PU
|M30
|
|-
!D 5.4
|Status report and evolution of operations after the project
|WP 5
|EGI.eu
|R
|PU
|M30
|
|-
!D 6.23
|Report on evaluation of EPOS EGI pilot studies
|WP 6
|INFN/INGV
|R
|PU
|M30
|
|}
 
<br>
 
<br>
 
= Milestones<br>  =
 
{| class="wikitable"
|-
! Milestone
! Title
! Related WP
! Delivery PM
! Means of verification
|-
! M 1.1
| Execution plan
| WP 1
| M02
| Staff for each partner per each task is identified and communicated to the project office, the reporting lines, the project management and governance structures are defined and approved
|-
! M 1.2
| First intermediate report
| WP 1
| M08
| A quarterly report describing the status of each activity within the project (M01 – M07) is approved
|-
! M 1.3
| Second intermediate report
| WP 1
| M23
| A quarterly report describing the status of each activity within the project (M16 – M22) is approved
|-
! M 2.1
| Website and templates
| WP 2
| M01
| Project information is available on the Web and document/presentation templates are defined
|-
! M 2.2
| Technical Forum 2015 is organised
| WP 2
| M12
| The event took place and a report is published with the main indicators including user satisfaction
|-
! M 2.3
| The EGI website is reviewed
| WP 2
| M13
| The website is reviewed and a number of recommended changes have been applied
|-
! M 2.4
| EGI Service management practices are audited
| WP 2
| M15
| EGI service management practices are audited by an external FitSM consultant
|-
! M 2.5
| Technical Forum 2016 is organised
| WP 2
| M24
| The event took place and a report is published with the main indicators including user satisfaction
|-
! M 2.6
| The EGI website is reviewed
| WP 2
| M25
| The website is reviewed and a number of recommended changes have been applied
|-
! M 2.7
| EGI Service management practices are audited
| WP 2
| M29
| EGI service management practices are audited by an external FitSM consultants
|-
! M 3.1
| Operational tools development roadmap agreed
| WP 3
| M04
| The operational tools development roadmap is agreed
|-
! M 3.2
| User requirements on data accounting collected
| WP 3
| M12
| The user requirements on Data Accounting are agreed and documented
|-
! M 3.3
| Operational tools development roadmap revised
| WP 3
| M16
| The operational tools development roadmap is revised and documented
|-
! M 3.4  
| Pilot services and best practices to enable federated AAI solutions released  
| WP 3  
| M16  
| Pilot services and best practices to enable federated AAI solutions for EGI services are available for the VREs and CCs
|-
|-
!M 3.5
! M 3.5  
|The first version of the EGI Marketplace is demonstrated
| The first version of the EGI Marketplace is demonstrated  
|WP 3, WP 2
| WP 3, WP 2  
|M18
| M18  
|Demo showcased at EGI Technical Forum and made available online
| Demo showcased at EGI Technical Forum and made available online
|-
|-
!M 3.6
! M 3.6  
|The second version of the EGI Marketplace is demonstrated
| The second version of the EGI Marketplace is demonstrated  
|WP 3, WP 2
| WP 3, WP 2  
|M26
| M26  
|Demo showcased at EGI Technical Forum and made available online
| Demo showcased at EGI Technical Forum and made available online
|-
|-
!M 4.1
! M 4.1  
|Open Data Platform: requirements and implementation plans
| Open Data Platform: requirements and implementation plans  
|WP 4
| WP 4  
|M06
| M06  
|Final selection of the technologies used to create Open Data Access Platform agreed. The report includes requirements and use cases from selected communities interested in open data
| Final selection of the technologies used to create Open Data Access Platform agreed. The report includes requirements and use cases from selected communities interested in open data
|-
|-
!M 4.2
! M 4.2  
|Launch of call for cross e-Infrastructure case studies
| Launch of call for cross e-Infrastructure case studies  
|WP 4
| WP 4  
|M15
| M15  
|A call for participation for cross e-Infrastructure case studies is published
| A call for participation for cross e-Infrastructure case studies is published
|-
|-
!M 4.3
! M 4.3  
|Open Data Platform in the Production
| Open Data Platform in the Production  
|WP 4
| WP 4  
|M30
| M30  
|The Open Data Platform is released in the production environment
| The Open Data Platform is released in the production environment
|-
|-
!M 5.1
! M 5.1  
|Platform for the long-tail of science is available
| Platform for the long-tail of science is available  
|WP 5
| WP 5  
|M10
| M10  
|The services to enable easy access to EGI resources are production-ready.
| The services to enable easy access to EGI resources are production-ready.
|-
|-
!M 5.2
! M 5.2  
|e-CEO challenges run on EGI resources
| e-CEO challenges run on EGI resources  
|WP 5
| WP 5  
|M15
| M15  
|The e-CEO tool for the ESA data challenge is using also EGI resources to run the data analysis tasks
| The e-CEO tool for the ESA data challenge is using also EGI resources to run the data analysis tasks
|-
|-
!M 5.3
! M 5.3  
|VREs for the fishery and marine sciences community are deployed in production
| VREs for the fishery and marine sciences community are deployed in production  
|WP 5
| WP 5  
|M18
| M18  
|Services for the fishery and marine sciences are available and production-ready on EGI resources
| Services for the fishery and marine sciences are available and production-ready on EGI resources
|-
|-
!M 6.1
! M 6.1  
|Joint training program for the first period is agreed
| Joint training program for the first period is agreed  
|WP 6
| WP 6  
|M03
| M03  
|The plan is defined by the competence centres, the partner e-Infrastructures and partner projects of EGI-Engage
| The plan is defined by the competence centres, the partner e-Infrastructures and partner projects of EGI-Engage
|-
|-
!M 6.2
! M 6.2  
|Security and privacy requirements and secure storage architectural design are agreed
| Security and privacy requirements and secure storage architectural design are agreed  
|WP 6
| WP 6  
|M06
| M06  
|Requirements are approved by the BBMRI Research Infrastructure community and the developers of the secure storage solution verified and accepted the design
| Requirements are approved by the BBMRI Research Infrastructure community and the developers of the secure storage solution verified and accepted the design
|-
|-
!M 6.3
! M 6.3  
|Life science requirements analysis and driver use case(s) with implementation roadmap are agreed
| Life science requirements analysis and driver use case(s) with implementation roadmap are agreed  
|WP 6
| WP 6  
|M12
| M12  
|Requirements are approved by the ELIXIR Research Infrastructure community
| Requirements are approved by the ELIXIR Research Infrastructure community
|-
|-
!M 6.4
! M 6.4  
|EPOS requirements analysis and outline of pilot use cases are agreed
| EPOS requirements analysis and outline of pilot use cases are agreed  
|WP 6
| WP 6  
|M12
| M12  
|Requirements and pilot use cases are approved by the EPOS Research Infrastructure community
| Requirements and pilot use cases are approved by the EPOS Research Infrastructure community
|-
|-
!M 6.5
! M 6.5  
|Joint training program for the second period is agreed
| Joint training program for the second period is agreed  
|WP 6
| WP 6  
|M15
| M15  
|The plan is endorsed by the competence centres, the partner e-Infrastructures and partner projects of EGI-Engage
| The plan is endorsed by the competence centres, the partner e-Infrastructures and partner projects of EGI-Engage
|}
|}


<br>
<br>  


<br>
<br>  


<br>
<br>  


[[Category:EGI-Engage]]
[[Category:EGI-Engage]]

Revision as of 12:49, 29 January 2015

EGI-Engage project: Main page WP1(NA1) WP3(JRA1) WP5(SA1) PMB Deliverables and Milestones Quality Plan Risk Plan Data Plan
Roles and
responsibilities
WP2(NA2) WP4(JRA2) WP6(SA2) AMB Software and services Metrics Project Office Procedures




Deliverables

Code Title WP(s) Lead Participant Type Dissemination level Delivery PM Description
D 1.1 Quality plan for Period 1 WP 1 EGI.eu R PU M03
D 2.1 Communications, Dissemination and Engagement Strategy WP 2 EGI.eu R PU M03
D 2.2 Master Model for SME engagement WP 2 EGI.eu R PU M06
D 2.3 Concept of EGI Marketplace WP 2 SWING R PU M06
D 2.4 Data Management Plan WP 2 EGI.eu R PU M06
D 3.1 Technical design of the new Accounting Portal and implementation plan WP 3 CSIC R PU M06
D 4.1 CANFAR integration roadmap WP 4 INFN R PU M06
D 1.2 Risk analysis and risk response for Period 1 WP 1 EGI.eu R PU M08
D 4.2 VM snapshot support: OCCI extension, final specification WP 4 CSIC OTHER PU M09
D 4.3 Resource template changes: OCCI extension, final specification WP 4 CSIC OTHER PU M09
D 6.1 Assisted pattern recognition tools integrated with EGI for citizen science WP 6 CSIC OTHER PU M09
D 6.2 Data repository for DARIAH WP 6 INFN OTHER PU M11
D 2.5 EGI Governance: Analysis and Recommendations WP 2 EGI.eu R PU M12
D 2.6 Report on data sharing policies and legal framework in fishery and marine sciences data sector WP 2 FAO R PU M12
D 2.7 Market Report on the fishery and marine sciences data sector WP 2 Engineering R PU M12
D 3.2 Design of the EGI Service Registry and Marketplace WP 3 SWING R PU M12
D 3.3 Accounting Repository release WP 3 STFC OTHER PU M12
D 3.4 First release of the operational tools WP 3 CNRS OTHER PU M12
D 4.4 Relocating VM instances between providers, final specification WP 4 CSIC OTHER PU M12
D 4.5 Deployment of a gCube release with Federated Cloud support WP 4 Engineering OTHER PU M12
D 6.3 Production portal for EISCAT_3D WP 6 EISCAT OTHER PU M12
D 6.4 Fully integrated MoBRAIN web portal WP 6 GNUBILA OTHER PU M12
D 6.5 Final version of Multi-Source Distributed Real-Time Search and Information Retrieval application WP 6 GWDG OTHER PU M12
D 6.6 Data flow handler and basic R tools to integrate and process data from Ecological Observatories on EGI WP 6 CSIC DEM PU M12
D 6.7 Implementation and evaluation of AMBER and/or GROMACS WP 6 CIRMMP R PU M13
D 1.3 Report of quality status and quality plan for Period 2 WP 1 EGI.eu R PU M14
D 3.5 First release of the new Accounting Portal deployed in production WP 3 CSIC OTHER PU M14
D 6.8 Analysis of requirements on biobank and study workflows WP 6 BBMRI ERIC R PU M14
D 6.9 web portals for tsunami wave propagation simulations and for WRF-based weather simulation WP 6 AS OTHER PU M14
D 2.8 Communications, Dissemination and Engagement Report and Updated Strategy WP 2 EGI.eu R PU M15
D 2.9 EGI Sustainability and Business Development Plan WP 2 EGI.eu R PU M15
D 3.6 Analysis on techniques to manage big data on the EGI accounting system WP 3 STFC R PU M15
D 4.6 e-Infrastructures integration report WP 4 INFN R PU M15
D 5.1 Report on the evolution of the EGI Operations WP 5 EGI.eu R PU M15
D 5.2 Platforms for the long-tail of science WP 5 CNR R PU M15
D 6.10 Infrastructure tests and best usage practices for life science service providers WP 6 CSC R PU M15
D 6.11 Security toolset release for BBMRI-ERIC WP 6 SNIC/KTH OTHER PU M15
D 6.12 GPGPU-enabled web portal(s) for MoBrain WP 6 CIRMMP OTHER PU M16
D 2.10 Market Analysis Report of selected sectors WP 2 GRNET R PU M18
D 3.7 First release of the EGI Service Registry and Marketplace prototype WP 3 SWING DEM PU M18
D 6.13 EPOS EGI pilot incorporating data retrieval, transfer and linkage WP 6 SURFsara/KNMI DEM PU M18
D 1.4 Risk analysis and risk response for Period 2 WP 1 EGI.eu R PU M20
D 3.8 First data accounting prototype WP 3 STFC DEM PU M20
D 4.7 Open Data Platform First Prototype WP 4 CYFRONET DEM PU M20
D 6.14 Scipion cloud deployment for MoBrain WP 6 CSIC OTHER PU M21
D 2.11 Cross-border procurement of e-Infrastructure services: Opportunities, Barriers, Use cases, Best Practices WP 2 CERN R PU M24
D 3.9 Identity Management for Distributed User Communities WP 3 GRNET R PU M24
D 3.10 Second release of the new Accounting Portal deployed in production WP 3 CSIC OTHER PU M24
D 3.11 Second release of the operational tools WP 3 CNRS OTHER PU M24
D 3.12 Second release of the Accounting Repository WP 3 STFC OTHER PU M24
D 6.15 Demonstrator for ELIXIR workflows implemented in the EGI Federated cloud WP 6 CESNET DEM PU M24
D 6.16 Evaluated cloud environment and demonstrator of analysis workflow for biobank studies WP 6 BBMRI ERIC DEM PU M24
D 6.17 Production level gateway for Arts and Humanities WP 6 MTA SZTAKI OTHER PU M24
D 6.18 Report on the installed LifeWatch applications and their usage record WP 6 CSIC R PU M24
D 6.19 EPOS EGI pilot integrating computational resources and services WP 6 CYFRONET DEM PU M24
D 6.20 Application of the simulation portals for scientific scenario in disaster mitigation WP 6 AS DEM PU M24
D 5.3 Evolution of security policies, procedures and best practices WP 5 STFC R PU M25
D 3.13 Second release of the EGI Service Registry and Marketplace prototype WP 3 SWING DEM PU M26
D 3.14 Report on Data Accounting WP 3 STFC R PU M27
D 4.8 Cross-infrastructure case studies report WP 4 INFN R PU M27
D 2.12 EGI Governance: Report on Adoption WP 2 EGI.eu R PU M28
D 3.15 Second data accounting prototype WP 3 STFC DEM PU M28
D 3.16 Final report on EGI Service Registry and Marketplace WP 3 SWING R PU M28
D 6.21 Second version of enhanced portal for EISCAT_3D WP 6 EISCAT OTHER PU M28
D 1.5 Report of quality status for Period 2 WP 1 EGI.eu R PU M29
D 4.9 Open Data Platform: Demonstrator, Experience Report and Use Cases WP 4 CYFRONET R PU M29
D 6.22 Design larger scale multi-hazards simulation attempting to reduce the uncertainty of climate change assessment WP 6 AS DEM PU M29
D 2.13 EGI Sustainability and Business Development Plan WP 2 EGI.eu R PU M30
D 2.14 Final Report on Communications, Dissemination and Engagement WP 2 EGI.eu R PU M30
D 3.17 Final release of the accounting repository WP 3 STFC OTHER PU M30
D 3.18 Final release of the Operational tools WP 3 CNRS OTHER PU M30
D 3.19 Final release of the new Accounting Portal deployed in production WP 3 CSIC OTHER PU M30
D 4.10 Final CANFAR integration release WP 4 NFN DEM PU M30
D 5.4 Status report and evolution of operations after the project WP 5 EGI.eu R PU M30
D 6.23 Report on evaluation of EPOS EGI pilot studies WP 6 INFN/INGV R PU M30



Milestones

Milestone Title Related WP Delivery PM Means of verification
M 1.1 Execution plan WP 1 M02 Staff for each partner per each task is identified and communicated to the project office, the reporting lines, the project management and governance structures are defined and approved
M 1.2 First intermediate report WP 1 M08 A quarterly report describing the status of each activity within the project (M01 – M07) is approved
M 1.3 Second intermediate report WP 1 M23 A quarterly report describing the status of each activity within the project (M16 – M22) is approved
M 2.1 Website and templates WP 2 M01 Project information is available on the Web and document/presentation templates are defined
M 2.2 Technical Forum 2015 is organised WP 2 M12 The event took place and a report is published with the main indicators including user satisfaction
M 2.3 The EGI website is reviewed WP 2 M13 The website is reviewed and a number of recommended changes have been applied
M 2.4 EGI Service management practices are audited WP 2 M15 EGI service management practices are audited by an external FitSM consultant
M 2.5 Technical Forum 2016 is organised WP 2 M24 The event took place and a report is published with the main indicators including user satisfaction
M 2.6 The EGI website is reviewed WP 2 M25 The website is reviewed and a number of recommended changes have been applied
M 2.7 EGI Service management practices are audited WP 2 M29 EGI service management practices are audited by an external FitSM consultants
M 3.1 Operational tools development roadmap agreed WP 3 M04 The operational tools development roadmap is agreed
M 3.2 User requirements on data accounting collected WP 3 M12 The user requirements on Data Accounting are agreed and documented
M 3.3 Operational tools development roadmap revised WP 3 M16 The operational tools development roadmap is revised and documented
M 3.4 Pilot services and best practices to enable federated AAI solutions released WP 3 M16 Pilot services and best practices to enable federated AAI solutions for EGI services are available for the VREs and CCs
M 3.5 The first version of the EGI Marketplace is demonstrated WP 3, WP 2 M18 Demo showcased at EGI Technical Forum and made available online
M 3.6 The second version of the EGI Marketplace is demonstrated WP 3, WP 2 M26 Demo showcased at EGI Technical Forum and made available online
M 4.1 Open Data Platform: requirements and implementation plans WP 4 M06 Final selection of the technologies used to create Open Data Access Platform agreed. The report includes requirements and use cases from selected communities interested in open data
M 4.2 Launch of call for cross e-Infrastructure case studies WP 4 M15 A call for participation for cross e-Infrastructure case studies is published
M 4.3 Open Data Platform in the Production WP 4 M30 The Open Data Platform is released in the production environment
M 5.1 Platform for the long-tail of science is available WP 5 M10 The services to enable easy access to EGI resources are production-ready.
M 5.2 e-CEO challenges run on EGI resources WP 5 M15 The e-CEO tool for the ESA data challenge is using also EGI resources to run the data analysis tasks
M 5.3 VREs for the fishery and marine sciences community are deployed in production WP 5 M18 Services for the fishery and marine sciences are available and production-ready on EGI resources
M 6.1 Joint training program for the first period is agreed WP 6 M03 The plan is defined by the competence centres, the partner e-Infrastructures and partner projects of EGI-Engage
M 6.2 Security and privacy requirements and secure storage architectural design are agreed WP 6 M06 Requirements are approved by the BBMRI Research Infrastructure community and the developers of the secure storage solution verified and accepted the design
M 6.3 Life science requirements analysis and driver use case(s) with implementation roadmap are agreed WP 6 M12 Requirements are approved by the ELIXIR Research Infrastructure community
M 6.4 EPOS requirements analysis and outline of pilot use cases are agreed WP 6 M12 Requirements and pilot use cases are approved by the EPOS Research Infrastructure community
M 6.5 Joint training program for the second period is agreed WP 6 M15 The plan is endorsed by the competence centres, the partner e-Infrastructures and partner projects of EGI-Engage