Agenda-27-02-2012
Jump to navigation
Jump to search
Main | EGI.eu operations services | Support | Documentation | Tools | Activities | Performance | Technology | Catch-all Services | Resource Allocation | Security |
Detailed agenda: Grid Operations Meeting 27 February 2012 14h00 Amsterdam time
EVO direct link | Pwd: gridops |
EVO details | Indico page |
1. Middleware releases and staged rollout
1.1 EMI-1 release status
1.2 Staged Rollout
UMD-1
Preparing the products for the UMD1.6 by the end of March.
Under staged rollout are:
- EMI:
- UNICORE XUUDB 1.3.3
- UNICORE Gateway 4.2.0
- UNICORE UVOS 1.5.0
- IGE:
- Gridway 5.8.2
Under verification or to be verified:
- EMI:
- dCache 1.9.15
- BDII site 1.1.0 (includes BDI core 1.2.0)
- Storm 1.8.2
- LFC Oracle 1.8.2
- UNICORE TSI 4.2.0
- UNICORE/X 4.2.0
- IGE:
- GridFTP 5.2.0
- GRAM5 5.2.0
- RLS 5.2.0
- Myproxy 5.5.2
- GSISSH 4.3.4
- GridSAM 2.3.0
- GSISSHTerm 1.3.2
- SAGA 1.6.1
2. Operational Issues
2.2 Service/Site decommissioning procedures
3. AOB
3.2 Next meetings
12 March 2012, h14:00 Amsterdam time.