Difference between revisions of "Agenda-26-09-2011"
Jump to navigation
Jump to search
(One intermediate revision by one other user not shown) | |||
Line 1: | Line 1: | ||
{{Template:Op menubar}} | {{Template:Op menubar}} | ||
[[Category:Grid Operations Meetings]] | |||
= Detailed agenda: Grid Operations Meeting 26 September 2011 14h00 Amsterdam time = | = Detailed agenda: Grid Operations Meeting 26 September 2011 14h00 Amsterdam time = | ||
Line 51: | Line 52: | ||
*Staged rollout state: | *Staged rollout state: | ||
**EMI-MPI 1.0.1: issues found in staged rollout, will be waiting for the next update to fix them | **EMI-MPI 1.0.1: issues found in staged rollout, will be waiting for the next update to fix them | ||
**WMS 3.3.3: Two main issues found: | **WMS 3.3.3: Two main issues found: | ||
***Stability problems when DLI is used in the JDL, affects only some limited use cases. | ***Stability problems when DLI is used in the JDL, affects only some limited use cases. | ||
***Purging of proxy dirs: EMI WMS stops accepting jobs after 31999th submission for the same DN, this is due to a limit of the number of entries in the inode for ext3 filesystems. | ***Purging of proxy dirs: EMI WMS stops accepting jobs after 31999th submission for the same DN, this is due to a limit of the number of entries in the inode for ext3 filesystems. | ||
*Upcoming: | |||
**CA 1.41 | |||
**AMGA | |||
**BDII site 1.1.0 | |||
**BDII top 1.1.0 | |||
**FTS 2.2.6 | |||
=== 1.3 Interoperability === | === 1.3 Interoperability === | ||
Line 65: | Line 72: | ||
==== 3.3 Next meetings ==== | ==== 3.3 Next meetings ==== | ||
10 October 2011 | 10 October 2011 | ||
Latest revision as of 12:35, 15 October 2012
Main | EGI.eu operations services | Support | Documentation | Tools | Activities | Performance | Technology | Catch-all Services | Resource Allocation | Security |
Detailed agenda: Grid Operations Meeting 26 September 2011 14h00 Amsterdam time
EVO direct link | Pwd: gridops |
EVO details | Indico page |
1. Middleware releases and staged rollout
1.1 EMI-1 release status
EMI-1 Update 7
Released on 22 September 2011: Release page
- Minor releases
- ARGUS, v. 1.4.0 : Unbundled some libraries: voms-api, trustmanager, bouncy-castle. New configuration for log files.
- UNICORE TSI & UNCIRE/X, v. 6.4.1: bug fixes and improvements
- Revision releases
- CEMon, v. 1.13.2 : Bug fixes
- gLExec-wn, v. 1.0.1 : Bug fixes (Mitigation for: Proxy Path Length error code)
- UNICORE client, v. 6.4.1 : Improvements.
EMI-1 future work
EMI tasks expected for middle October
- glite-MPI v. 1.1.0
- GFAL/lcg_util v.1.11.19
- StoRM SE v.1.7.2
- LFC v. 1.8.2
- DPM v. 1.8.2
- APEL parsers v.1.0.1
- Hydra v.1.0.1
1.2 Staged Rollout (Mario)
1.2.1 gLite 3.2
- CREAM 1.6.7: staged rollout almost finished
- FTS 2.2.5: still in same situation as 2 weeks ago, no EA
1.2.2 UMD1
- Staged rollout state:
- EMI-MPI 1.0.1: issues found in staged rollout, will be waiting for the next update to fix them
- WMS 3.3.3: Two main issues found:
- Stability problems when DLI is used in the JDL, affects only some limited use cases.
- Purging of proxy dirs: EMI WMS stops accepting jobs after 31999th submission for the same DN, this is due to a limit of the number of entries in the inode for ext3 filesystems.
- Upcoming:
- CA 1.41
- AMGA
- BDII site 1.1.0
- BDII top 1.1.0
- FTS 2.2.6
1.3 Interoperability
2. Operational Issues
gLite 3.2 critical bugs and patches
3. AOB
3.3 Next meetings
10 October 2011