Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Agenda-24-02-2014

From EGIWiki
Jump to navigation Jump to search
Audio conference link Conference system is Adobe Connect, no password required.
Audio conference details Indico page



1. Middleware releases and staged rollout

1.1 News from URT

  • ARC: minor release expected for mid March
  • WMS: new release expected for the end of February (fixing the openssl compatibility)
  • New SAM probes expected for CREAM, QCG and ARC. SAM team (currently supporting the migration of the central instance) will not be able to release them before the end of April. The new consortium will release the probes, but - considering that completing the migration is a priority - it is likely that the new probes will be available in SAM after May.

1.2 UMD release

1.3 Staged rollout updates

1.4 Next releases

  • UMD-3 expected for the end of March

2. Operational issues

2.1 Report from DMSU

WMS - Argus SSL connection errors - Signature does not match

GGUS #101486

There are random SSL connection errors between our WMS and our Argus (@NGI_GRNET). It is not yet clear if it is the same issue with Java 7 affecting ARGUS some months ago (see https://wiki.egi.eu/wiki/Agenda-07-10-2013#2.2_Connection_problems_for_Argus )

2.1 EMI-2 decommision calendar

Reminder:

  • Sites will start to receive alarms on Monday March 3rd
  • Probes are ready and deployed in midmon, and Sites and ROD can check which are the services to upgrade by: xx-02-2014
  • More information software retirement calendar wiki page
  • Matt Doidge is working on the EMI-3 WN tarball. A first version is expected at the beginning of March. Sites interested in the tarball version of the WN are encouraged to contact João Pina, and support the WN staged rollout.

2.1 GLUE2 validation

The number of Site BDIIs failing GLUE Validator reduced to 73 instances, currently failing in midmon. This number is compliant with PRCEDURE06, which demands 75% of the sites OK before a probe turns into Operational. Possible timeline:

  • Broadcast to ROD and Sites on March 3rd
  • Probe will be set OPERATIONAL on March 10th
  • Sites will have other two weeks to fix the Site-BDII before receiving alarms

For any comment, question or suggestion, contact operations[at]egi.eu

3. AOB

3.1 Next meeting

4. Minutes