Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "Agenda-02-05-2011"

From EGIWiki
Jump to navigation Jump to search
Line 1: Line 1:
{{Template:Op menubar}}  
{{Template:Op menubar}}  


= Detailed agenda: Grid Operations Meeting 02 May 2011 =
= Detailed agenda: Grid Operations Meeting 02 May 2011 =


=== 1. Middleware releases and staged rollout  ===
=== 1. Middleware releases and staged rollout  ===


==== 1.1. Update on the status of EMI-1 release (Cristina) ====
==== 1.1. Update on the status of EMI-1 release (Cristina) ====


==== 1.2. Staged Rollout (Mario) ====
==== 1.2. Staged Rollout (Mario) ====
 
#SAM&nbsp;Update 10.1 under staged rollout (Update 10 was rejected in staged rollout)<br>
#gLite 3.1 and 3.2 components are "stalled"&nbsp;in certification or verification (FTS&nbsp;and L&amp;B).<br>
 
==== 1.3 Feedback from EAs to change into EMI1 components for the staged rollout<br> ====
 
Most components already covered, including ARC&nbsp;and Unicore ones. But some gLite components still missing, or with only 1 EA.<br>
 
EAs that did not yet send feedback, please do so. Plans to move to EMI components or not.<br>
 
https://www.egi.eu/earlyAdopters/teams<br>
 
==== 1.4 Interoperability<br> ====
 
ARC&nbsp;probes have already been integrated into SAM/Nagios framework.<br>
 
Task force for Unicore and Globus integration underway:<br>
 
*The first Globus integration task force meeting: this week Wednesday https://www.egi.eu/indico/conferenceDisplay.py?confId=469
*The next UNICORE integration task force meeting: this week Friday:&nbsp;https://www.egi.eu/indico/conferenceDisplay.py?confId=465<br>


#'''gLite 3.1'''


#'''gLite 3.2'''


=== 2. Operational Issues  ===
=== 2. Operational Issues  ===
Line 35: Line 53:


=== 3. AOB  ===
=== 3. AOB  ===
==== 3.1 Workshops for site managers @ EGI Technical Forum ====
Currently EGI.eu is collecting topics for the TF in September in Lyon.


Would NGI be interested in a workshop dedicated to Site Managers?
==== 3.1 Workshops for site managers @ EGI Technical Forum  ====
Which topics should the workshop focus on?
 
Currently EGI.eu is collecting topics for the TF in September in Lyon.


* Monitoring
Would NGI be interested in a workshop dedicated to Site Managers? Which topics should the workshop focus on?
* Accounting
* Virtualization
* ..


The proposal would be to have few topics (two or three) to be exposed and discussed extensively.
*Monitoring
*Accounting
*Virtualization
*..


==== 3.2 Next meeting ====
The proposal would be to have few topics (two or three) to be exposed and discussed extensively.
 
==== 3.2 Next meeting ====


Proposal: Monday 16 of May 14:00  
Proposal: Monday 16 of May 14:00  


[[Category:GridOpsMeeting]]
[[Category:GridOpsMeeting]]
<br>

Revision as of 12:58, 2 May 2011

Main EGI.eu operations services Support Documentation Tools Activities Performance Technology Catch-all Services Resource Allocation Security



Detailed agenda: Grid Operations Meeting 02 May 2011

1. Middleware releases and staged rollout

1.1. Update on the status of EMI-1 release (Cristina)

1.2. Staged Rollout (Mario)

  1. SAM Update 10.1 under staged rollout (Update 10 was rejected in staged rollout)
  2. gLite 3.1 and 3.2 components are "stalled" in certification or verification (FTS and L&B).

1.3 Feedback from EAs to change into EMI1 components for the staged rollout

Most components already covered, including ARC and Unicore ones. But some gLite components still missing, or with only 1 EA.

EAs that did not yet send feedback, please do so. Plans to move to EMI components or not.

https://www.egi.eu/earlyAdopters/teams

1.4 Interoperability

ARC probes have already been integrated into SAM/Nagios framework.

Task force for Unicore and Globus integration underway:


2. Operational Issues

2.1 gLite 3.2 VOMSes not published

Most probably not all the gLite 3.2 VOMS services are correctly published in the information system.

NB:For Resource BDII need to be added to the site BDII, as any other service in the site.

gLite 3.1 VOMS doesn't have information provider.

2.2 older WMSes update

WMSes update to 3.1.30 or newer. Old WMSes:

  • egee-rb-09.cnaf.infn.it (updated but no publishing correctly the information)
  • gilda-wms-02.ct.infn.it
  • wms011.cnaf.infn.it (updated but no publishing correctly the information)
  • wms015.cnaf.infn.it (updated but no publishing correctly the information)
  • wms-dgrid.gridka.de
  • wmslb101.grid.ucy.ac.cy

3. AOB

3.1 Workshops for site managers @ EGI Technical Forum

Currently EGI.eu is collecting topics for the TF in September in Lyon.

Would NGI be interested in a workshop dedicated to Site Managers? Which topics should the workshop focus on?

  • Monitoring
  • Accounting
  • Virtualization
  • ..

The proposal would be to have few topics (two or three) to be exposed and discussed extensively.

3.2 Next meeting

Proposal: Monday 16 of May 14:00