Difference between revisions of "EGI-InSPIRE:Serbia-QR12"
Jump to navigation
Jump to search
m (moved OMB:Serbia-QR12 to EGI-InSPIRE:Serbia-QR12) |
|
(No difference)
|
Revision as of 10:33, 8 January 2015
Main | EGI.eu operations services | Support | Documentation | Tools | Activities | Performance | Technology | Catch-all Services | Resource Allocation | Security |
Inspire reports menu: | Home • | SA1 weekly Reports • | SA1 Task QR Reports • | NGI QR Reports • | NGI QR User support Reports |
Quarterly Report Number | NGI Name | Partner Name | Author |
---|---|---|---|
QR12 | NGI_AEGIS | Institute of Physics Belgrade | Dusan Vudragovic |
1. MEETINGS AND DISSEMINATION
Note: Complete the tables below by adding as many rows as needed.
1.1. CONFERENCES/WORKSHOPS ORGANISED
Date | Location | Title | Participants | Outcome (Short report & Indico URL) |
---|---|---|---|---|
1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED
Date | Location | Title | Participants | Outcome (Short report & Indico URL) |
---|---|---|---|---|
16 and 18 March 2013 | Faculty of Sciences, University of Novi Sad and Faculty of Physics, University of Belgrade | 2013 International Particle Physics MasterClass | 60 | The 2013 International Particle Physics MasterClass (http://www.physicsmasterclasses.org/) in Serbia was organized by the University of Belgrade, in collaboration with the European Particle Physics Outreach Group, and was held on 16 March 2013 at the Faculty of Sciences, University of Novi Sad and on 18 March at the Faculty of Physics, University of Belgrade. IPB's Dusan Vudragovic and Vladimir Slavnic gave a talk to high school students on utilization of the Serbian Grid and High Performance Computing (HPC) resources.
The aim of the MasterClass is to introduce an exciting and rapidly developing scientific field dealing with some of the fundamental secrets of the nature to the 4th-year high school students. The lectures given by active researchers and university professors bring insight into topics and methods of fundamental research of matter, but distributed computing infrastructures are presented as well. During the Grid and HPC computing session, the aims of EGI-InSPIRE project are presented. Event URL (in Serbian) |
1.3. PUBLICATIONS
Publication title | Journal / Proceedings title | Journal references Volume number Issue Pages from - to |
Authors 1. 2. 3. Et al? |
---|---|---|---|
Lattice Dynamics of KNi2Se2 | Phys. Rev. B | 87 (2013) 144305; DOI: 10.1103/PhysRevB.87.144305 | 1. N. Lazarevic 2. M. M. Radonjic 3. M. Scepanovic Et al. |
Geometric Resonances in Bose-Einstein Condensates with Two- and Three-body Interactions | J. Phys. B: At. Mol. Opt. Phys. | 46 (2013) 065303; DOI: 10.1088/0953-4075/46/6/065303 | 1. H. Al-Jibbouri 2. I. Vidanovic 3. A. Balaz Et al. |
Spin Modulation Instabilities and Phase Separation Dynamics in Trapped Two-component Bose Condensates | New J. Phys. | 15 (2013) 035008; DOI: 10.1088/1367-2630/15/3/035008 | 1. I. Vidanovic 2. N. J. van Druten 3. M. Haque |
A Comparative Study of Electronic Properties of Disordered Conjugated Polymers | Phys. Chem. Chem. Phys. | 15 (2013) 3542; DOI: 10.1039/C3CP43115K | 1. N. Vukmirovic |
Monte Carlo Simulations of Crystalline Organic Semiconductors | SJEE | 10 (2013) 125-134; DOI: 10.2298/SJEE1301125M | 1. M. Mladenovic 2. I. E. Stankovic |
Efficient Routing on Small Complex Networks Without Buffers | Physica A | 392 (2013) 2294; DOI: 10.1016/j.physa.2013.01.033 | 1. J. Smiljanic 2. I. E. Stankovic |
2. ACTIVITY REPORT
2.1. Progress Summary
- Maintenance of CREAM CE, WMS, and LB staged rollout services.
- Participation in staged rollout test for EMI.cream.sl6.x86_64-1.14.3 (https://rt.egi.eu/rt/Ticket/Display.html?id=5008) and emergency release 1.14.4 of EMI-2 CREAM.
- Certification of AEGIS09-FTN-KM Grid site has been finalized, so NGI_AEGIS now provides in total 6 Grid sites.
- Operation of BDII/WMS/LB/VOMS/PX/LFC/Pakiti services for AEGIS, agINFRA, CMPC.AEGIS.RS, ATLAS, CMS, SEEGRID, and SEE VOs.
- Operational support to NGI_BA and NGI_GE.
- Attendance to Operations Management Board and Operations meetings.
- Participation in staged rollout test for EMI.cream-torque.sl6.x86_64-2.0.2 (https://rt.egi.eu/rt/Ticket/Display.html?id=5010).
- Coordination of operation of NGI_AEGIS sites.
- Maintenance and regular update of NGI_AEGIS Nagios box, responsible for monitoring of NGI_AEGIS and NGI_GE.
- Coordination of the migration of EMI-1 components deployed in NGI_AEGIS to EMI-2 or EMI-3. Migration of gLite services (gLite 3.2 DPM, LFC and Worker Nodes) was already successfully completed in the previous period.
- Monitoring the creation of the VT Inter-NGI Usage Report within the Inter NGI Usage Report virtual team.
- Participation in staged rollout test for EMI.wms.sl6.x86_64-3.5.0 (https://rt.egi.eu/rt/Ticket/Display.html?id=5095).
- Providing NGI_AEGIS self-assessment for the EGI-InSPIRE "NGI International Tasks" for milestone MS124 "NGI International Tasks Review" (https://wiki.egi.eu/wiki/NGI_International_Task_Review_MS124).
- Dealing in timely manner with all security issues broadcasted by the EGI-CSIRT team. (e.g. DPM SQL injection vulnerability, Linux kernel ptrace vulnerability, vulnerability in CREAM Axis2 configuration, etc.).
- Participation in staged rollout test for EMI.lb.sl6.x86_64-4.0.4 (https://rt.egi.eu/rt/Ticket/Display.html?id=5117).
- Participation in EGI Resource Allocation Task Force (https://wiki.egi.eu/wiki/Resource_Allocation_Task_Force). NGI_AEGIS contributed its resources to the pool of shared resources for the implementation of an RA testbed.
- All NGI_AEGIS Grid sites participated in the survey on Use of configuration management tools in the EGI resource centres.
- Update of CA RPMs: EGI Trust Anchor release 1.52-1.
- Reporting the issue concerning accessibility of xGUS Helpdesk instances (https://ggus.eu/ws/ticket_info.php?ticket=93638).
- Participating in tests being executed after each GGUS release for testing the functionality of each interface from GGUS to any external ticketing system (https://helpdesk.aegis.rs/index.php?mode=ticket_info&ticket_id=107 and https://helpdesk.aegis.rs/index.php?mode=ticket_info&ticket_id=110).
- Maintenance of NGI_AEGIS Helpdesk (https://helpdesk.aegis.rs/): adding new sites, support teams and users.
- Operation of AEGIS CA (http://ca.aegis.rs/).
- Maintenance and update of the AEGIS web site (http://www.aegis.rs/).
2.2. Main Achievements
- Certification of AEGIS09-FTN-KM Grid site from Kosovska Mitrovica has been successfully finalized. NGI_AEGIS participates with 6 Grid sites in EGI-InSPIRE infrastructure.
2.3. Issues and mitigation
Issue Description | Mitigation Description |
---|---|