== Ticket LifeCycle == | == Ticket LifeCycle == | ||
Line 82: | Line 85: | ||
Insert any question / issue you may have here to keep track of them | Insert any question / issue you may have here to keep track of them | ||
* '''Define Scope of a Release (e.g. delta to a respective base Bundle or not ?)''' | |||
* '''Define / Finalize the Relese Metadata Schema.''' | |||
[[EGI REPO Team Issues]] | |||
== Related Info == | == Related Info == | ||
Line 92: | Line 98: | ||
[[Feedback from M. Drescher]] | [[Feedback from M. Drescher]] | ||
[[NSRW_feedback_Milos_and_Ales]] | |||
Current Quality Criteria: [[EGI-InSPIRE:UMDQualityCriteria]] | |||
The current template for Quality Criteria verification can be found [https://documents.egi.eu/secure/ShowDocument?docid=208 here]. | |||
[https://documents.egi.eu/secure/ShowDocument?docid=46 MS501] | [https://documents.egi.eu/secure/ShowDocument?docid=46 MS501] | ||
Line 105: | Line 117: | ||
[[NGI_CZ:RT_GGUS_Integration]] | [[NGI_CZ:RT_GGUS_Integration]] | ||
[[NSRW_IMPLEMENTATION_RT]] | |||
[[Quality_Assurance:Main_Page]] | |||
[https://documents.egi.eu/secure/ShowDocument?docid=55 Metrics] | |||
[[Internal TPs Process for a new software release]] | |||
[[ | --[[User:Kkoum|Kkoum]] 07:17, 28 September 2010 (UTC) |
Latest revision as of 23:19, 24 December 2014
EGI Inspire Main page |
Ticket LifeCycle
- The SW Provider creates a Ticket in GGUS accompanied with all the necessary info
- The ticket is transferred from GGUS to RT, the RepoAction field of the ticket is “MoveToUnverified“
- Upon RepoAction field change, the RT Notifies the Repo that there is a ticket to be processed
- The Repo Processes the ticket
- Downloads the software bundle and puts it on the “Unverified” Repository
- The Repo parses the attached xml
- Based on the metadata contained at both, the ticket itself and the attached xml, the Repo performs the necessary actions
- Upon success: The Repo updates the RT setting the RepoStatus of the ticket to “Unverified” + the Uri where the new software can be found, etc.
- In case of a failure: The Repo updates the RT, setting the RepoStatus of the ticket to “Failed”, plus it updates the ticket with a comment that contains the info related to the failure
- In both 4.3 cases, the RT Notifies the EGI Technology Unit group (i.e the Ticket is Assigned to the EGI TUG)
- EGI TUG -- The ticket is assigned a verifier
- EGI TUG -- The verifier checks the information available and fills the GQC template and the SQC template for the component .
- EGI TUG -- If the verification is OK, the ticket is moved to Stage-rollout (see step 6) and the SP get a notification
- EGI TUG -- If the verification is not OK, and minor issues are found, the SP is notified and has 1-2 days (depending on the type of release) to solve or clarify the issues. The ticket is moved to Verified-issues
- EGI TUG -- If the verification is not OK, and has major issues or the grace-period has passed without correcting the issues, the ticket is moved to Rejected and the SP get a notification
- If the TUG team decide that the release it is ready to move to stage-rollout phase, the RepoAction field of the ticket it is marked as MoveToStageRollOut
- Upon RepoAction field change, the RT Notifies the Repo that there is a ticket to be processed
- The Repo Processes the ticket
- Move the SW to stage-rollout
- The Repo updates the RT setting the RepoStatus of the ticket to “Stage-Rollout” + the Uri where the new software can be found, etc.
- RT Notifies the EA and/or MarioD or whoever is responsible to handle the stage-rollout process (MarioD?? any suggestion on this?)
- If everything it is OK, MarioD change the RepoAction field to “MoveToProduction”
- Upon RepoAction field change, the RT Notifies the Repo that there is a ticket to be processed
- The Repo Processes the ticket
- Move the SW to production
- The Repo updates the RT setting the RepoStatus of the ticket to “Production” + the Uri where the new software can be found, etc.
…. and the life goes on ….
...
Required Fields
RepoAction : Actions to Be Performed by the Repo, Values MoveToUnverified,MoveToStageRollOut,MoveToProduction,Reject,Depreceate
RepoStatus : Response to RepoActions, Values Uverified,StateRollOut,Production,Depreceated,Failed
Work Flow
Proposed Structure for the Repository
stagerollout
/sw/stagerollout/CAs/egi/ /sw/stagerollout/CAs/lcg/ /sw/stagerollout/umd/1.0/….. /sw/stagerollout/globus/x/x.y/….. /sw/stagerollout/jra1/nagios/ /sw/stagerollout/jra1-sw1 /sw/stagerollout/jra1-sw2 /sw/stagerollout/……….
Production
/sw/production/CAs/egi/ /sw/production/CAs/lcg/ /sw/production/umd/1.0/….. /sw/production/globus/x/x.y/….. /sw/production/jra1/nagios/ /sw/production/jra1/jra1-sw1/ /sw/production/jra1/jra1-sw2/ /sw/production/……….
MetaData
NRMS New Release MetaDATA schema
Ticket Status Values
Questions/Issues
Insert any question / issue you may have here to keep track of them
- Define Scope of a Release (e.g. delta to a respective base Bundle or not ?)
- Define / Finalize the Relese Metadata Schema.
Related Info
Current Quality Criteria: EGI-InSPIRE:UMDQualityCriteria
The current template for Quality Criteria verification can be found here.
Internal TPs Process for a new software release
--Kkoum 07:17, 28 September 2010 (UTC)