Difference between revisions of "Agenda-09-01-2012"
Jump to navigation
Jump to search
(9 intermediate revisions by 4 users not shown) | |||
Line 1: | Line 1: | ||
{{Template:Op menubar}} | {{Template:Op menubar}} | ||
[[Category:Grid Operations Meetings]] | |||
= Detailed agenda: Grid Operations Meeting 09 January 2012 14h00 Amsterdam time = | = Detailed agenda: Grid Operations Meeting 09 January 2012 14h00 Amsterdam time = | ||
Line 18: | Line 19: | ||
=== 1.2 Staged Rollout === | === 1.2 Staged Rollout === | ||
==== 1.2.1 gLite 3.2 security patches ==== | ==== 1.2.1 gLite 3.2 security patches ==== | ||
Two gLite 3.2 security patches will soon come to staged rollout, will need fast response and testing: | Two gLite 3.2 security patches will soon come to staged rollout, will need fast response and testing: | ||
*Torque Utils, Server, Clients | |||
*Torque Utils, Server, Clients | |||
*APEL Publisher | *APEL Publisher | ||
==== 1.2.2 UMD1 ==== | ==== 1.2.2 UMD1 ==== | ||
There are several updates under verification and staged rollout. The target freeze date to have the staged rollout done and reports published is on the 23 January. The UMD1.5 release is scheduled for the 30 January. The schedule is [[UMD_1.5.0_Contents ]] | |||
Status of candidate products: | |||
*In staged rollout: | |||
*In staged rollout: | **DPM 1.8.2 | ||
**DPM 1.8.2 | **LFC (Mysql) 1.8.2 | ||
**LFC (Mysql) 1.8.2 | **Storm 1.8.1 | ||
*In verification: | |||
**Storm 1.8.1 | **UNICORE UVOS 1.5.0 | ||
**UNICORE UVOS 1.5.0 | *To be verified: | ||
*To be verified: | **WMS 3.3.4 | ||
** | **LB 3.1.0 | ||
**LB 3.1.0 | **MPI 1.2.0 | ||
**MPI 1.2.0 | **UNICORE Gateway 4.2.0 | ||
**UNICORE Gateway 4.2.0 | **UNICORE XUUDB 1.3.3 | ||
**UNICORE XUUDB 1.3.3 | **IGE Gridsam 2.3.0 | ||
**IGE Gridsam 2.3.0 | |||
**IGE Gridway 5.8.1 | **IGE Gridway 5.8.1 | ||
== 2. Operational Issues == | == 2. Operational Issues == | ||
=== 2.1 Requirements === | |||
The current requirements submission campaign closes on '''January 19th'''. In the following days they will be collected to be presented during the F2F OMB meeting. | |||
=== 2.2 Sites 'suspended' or 'candidate' === | |||
As discussed in [[Agenda-21-11-2011|one of the previous meetings]], the sites in suspended or candidate status for too long ( before 01 June 2011) should be closed. | |||
* COD received some GGUS tickets about sites that will be certified in the next months to not be closed. | |||
* The other sites 'suspended' or 'candidate' for more than 6 months will be closed without further warning | |||
== 3. AOB == | == 3. AOB == | ||
Line 53: | Line 60: | ||
=== 3.2 Next meetings === | === 3.2 Next meetings === | ||
January 20th 2012 | |||
Latest revision as of 17:16, 29 November 2012
Main | EGI.eu operations services | Support | Documentation | Tools | Activities | Performance | Technology | Catch-all Services | Resource Allocation | Security |
Detailed agenda: Grid Operations Meeting 09 January 2012 14h00 Amsterdam time
EVO direct link | Pwd: gridops |
EVO details | Indico page |
1. Middleware releases and staged rollout
1.1 EMI-1 release status
1.2 Staged Rollout
1.2.1 gLite 3.2 security patches
Two gLite 3.2 security patches will soon come to staged rollout, will need fast response and testing:
- Torque Utils, Server, Clients
- APEL Publisher
1.2.2 UMD1
There are several updates under verification and staged rollout. The target freeze date to have the staged rollout done and reports published is on the 23 January. The UMD1.5 release is scheduled for the 30 January. The schedule is UMD_1.5.0_Contents
Status of candidate products:
- In staged rollout:
- DPM 1.8.2
- LFC (Mysql) 1.8.2
- Storm 1.8.1
- In verification:
- UNICORE UVOS 1.5.0
- To be verified:
- WMS 3.3.4
- LB 3.1.0
- MPI 1.2.0
- UNICORE Gateway 4.2.0
- UNICORE XUUDB 1.3.3
- IGE Gridsam 2.3.0
- IGE Gridway 5.8.1
2. Operational Issues
2.1 Requirements
The current requirements submission campaign closes on January 19th. In the following days they will be collected to be presented during the F2F OMB meeting.
2.2 Sites 'suspended' or 'candidate'
As discussed in one of the previous meetings, the sites in suspended or candidate status for too long ( before 01 June 2011) should be closed.
- COD received some GGUS tickets about sites that will be certified in the next months to not be closed.
- The other sites 'suspended' or 'candidate' for more than 6 months will be closed without further warning
3. AOB
3.2 Next meetings
January 20th 2012