Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Search results

Jump to navigation Jump to search
  • *Initial implementation of the EGI IdP/SP Proxy (SAML2 flows) *Interconnect the EGI IdP/SP Proxy with GOCDB as an AA
    5 KB (521 words) - 14:59, 19 February 2017
  • ...eduGAIN and individual institutions) with the EGI services through an IdP/SP proxy *Idp/SP Proxy based on SimpleSAMLphp
    5 KB (659 words) - 09:44, 25 October 2016
  • ...ly request to connect to a SP and let their users to authenticate on these SP.
    2 KB (382 words) - 17:33, 13 January 2022
  • |components= IdP/SP Proxy. Master Portal for the X509 provisioning. User registration service.
    889 bytes (137 words) - 14:19, 29 November 2019
  • ...ification is OK, the ticket is moved to Stage-rollout (see step 6) and the SP get a notification''' ...'EGI TUG -- If the verification is not OK, and minor issues are found, the SP is notified and has 1-2 days (depending on the type of release) to solve or
    5 KB (749 words) - 23:19, 24 December 2014
  • ...on, you can connect to the EOSC Portal AAI IdP as a SAML Service Provider (SP). Users of your application will be redirected to the EOSC Portal in order ...an XML document, as this is automatically generated by all major SAML 2.0 SP software solutions (e.g., Shibboleth, SimpleSAMLphp, and mod_auth_mellon).
    14 KB (2,061 words) - 17:21, 13 January 2022
  • Please note that as a IdP proxy, OpenConext itslef also acts as an SP towards connected IdPs | OpenConext SP Proxy
    6 KB (797 words) - 11:09, 22 June 2015
  • | https://aai-demo.eosc-portal.eu/proxy/module.php/saml/sp/metadata.php/sso | https://aai.eosc-portal.eu/proxy/module.php/saml/sp/metadata.php/sso
    14 KB (2,067 words) - 17:23, 13 January 2022
  • ...thZ, org.nagios.OIDC-Provider-Config, org.nagios.SAML-IdP, org.nagios.SAML-SP, org.nagios.TTS-MasterPortal-Config, org.nagios.TTS-MasterPortal-Register): Tue Dec 4 09:09:02 CET 2018 One of the two VMs running the IdP/SP Proxy service instance has been disrupted and needs to be reinstalled from
    10 KB (1,607 words) - 17:19, 15 December 2021
  • ...top Grid Federation (http://www.desktopgridfederation.org, http://www.idgf-sp.eu) provides bridges between EGI VOs and Desktop Grid resources in order to ...NGI with strong co-operation with the FP7 IDGF-SP project (http://www.idgf-sp.eu) and the IDGF community (http://www.desktopgridfederation.org).
    3 KB (465 words) - 09:14, 31 October 2018
  • ...heduled due to the significant delay of starting the related project (IDGF-SP project kick-off meeting was held last month). However, we are planning to
    3 KB (422 words) - 11:54, 19 July 2013
  • Leader: Robert Lovas, NGI_HU NIL, FP7 IDGF-SP project coordinator.<br> ...FP7 projects (EDGeS, EDGI, DEGISCO) and the on-going [www.idgf-sp.eu IDGF-SP project].
    12 KB (1,765 words) - 17:16, 18 June 2015
  • *10/05 - DB/SH: Prepare a draft SLA and circulate for comments *10/02 - SP/JG: Extract list of sites publishing storage pricing information and circul *07/02 - JG/SP: Add GOCDB storage extension based on proposed unit/time.
    8 KB (1,244 words) - 13:40, 19 June 2015
  • ...r the [https://refeds.org/category/research-and-scholarship R&amp;S REFEDS SP Category]) will need to use an attribute supplied by an IdP to create/ident **'''Update 20/08/2015: Re-publishing the eppn looks like a no-go:''' The SP needs to first take account of each/every IdP's policy on whether the eppn
    22 KB (3,482 words) - 12:41, 28 October 2021
  • ...for Desktop Grids will be handled by the new project IDGF-SP (http://idgf-sp.eu). In the following quarter support unit for Desktop Grids will be establ
    5 KB (695 words) - 18:55, 6 January 2015
  • ...'' (IdP). The external services must deploy a SAML '''Service Provider''' (SP) like [https://shibboleth.net/products/service-provider.html Shibboleth] or A prospective SP should do the following steps:
    21 KB (3,243 words) - 16:04, 6 February 2020
  • * By mid December GRNET will provide the IdP/SP proxy component * First SP using this proxy will be the GOCDB testing instance
    8 KB (1,089 words) - 15:11, 3 December 2015
  • * join as a SP to eduGAIN * join as a SP to eduGAIN
    12 KB (1,447 words) - 15:33, 24 March 2017
  • &nbsp; &nbsp; an MOU is signed between the IDGF-SP project and EGI.
    6 KB (994 words) - 17:19, 18 June 2015
  • an MOU is signed between the IDGF-SP project and EGI.
    5 KB (947 words) - 16:31, 5 May 2014

View (previous 20 | next 20) (20 | 50 | 100 | 250 | 500)