Activity Reports

NA1

  1. Milestones and Deliverables
    • Progressing MS801 for delivery to PMB this week and final despatch next week
    • gathering QR14 inputs
    • preparing table of outstanding work till current end of InSPIRE.

NA2

NA2.2

  1. News Items/Articles
  2. Case Studies
  3. Media mentions
  4. Events
    • Attending ICT2013 in Vilnius
  5. Community Forum CF14 (RMcL)
    • Setting up of PC. Contacting no show invited members individually - Doodle poll for 1st meeting on 15 Nov
    • Setting up agenda for site visit
    • preparing and participating in LOC meeting
    • Follow up on C4Me issues
    • Developing/refining/sharing room allocation tables
    • Keynote speakers
  6. H2020 workshop (RMcL)
    • progressing invitation to participate and various other issues
  7. Human Networks
    • Meeting with CG and RMcL about handover of various activities
    • Investigated and chased various Champions Travel Request issues (RMcL)
    • Proposed funding Champ travel for H2020 workshop (RMcL)
  8. Webinars (RMcL)
    • Arranged and conducted webinar on High Throughput Data for ENVRI
    • Updating Procedure sheet for webinars.
    • Edit and Upload of recorded webinar to DocDB and Indico.
  9. Other Projects
    • Providing Social Media coverage for CloudWATCH
  10. Deliverables/Milestones
    • Provided input to QR14 and attendant slide
  11. Staffing
    • Outreach Officer and Graphic designers role filled. Successful candidates start later this month
  12. Other
    • Created first draft of white paper on the "Community networks and support” solution

NA2.3

Major work done during the past week by task

Major Events Attended

Major Events Planned

Technical Outreach to New Communities

UCST

EGI-InSPIRE 2.5

  1. AppDB
    • Start assessment of OpenAIRE API to connect AppDB with OpenAIRE (scientific publications)
    • Engagement with: gCube framework team, and Bin2Xcor2sac team
  2. Science Gateway Primer: meeting with Silvia Olabarriaga group; discuss the anatomy of SG's and sync activities.
  1. Webex bookings, indico setup
    • support for Ingemar (setting up JDK/Firefox support was provided)
  2. Investigation of requirements from George Mikuchadze
    • Finding suitable VO (most suitable is DRIHM.EU, can we contact Christian Straube - VO manager ?)
    • Requirements:
      • 1. Local area weather forecast models such as WRF-ARW/NMM (8-16 CPUs)
      • 2. Quantum chemical calculation of macromolecules such as DNA (4 or 8 pair nucleotides) using DFT methods (16-64 CPUs)
      • 3. Interaction of plasma with high intensive laser beams using openmp (maximum number of CPUs per WN)
      • 4. The needed storage space is approx. 5 GB."
  3. PPT TNA2.1/TNA1.7 unspent effort calculation
  4. Survey for NILs summary
  5. GlobusOnline.eu and EGI SSO
    • GGUS user support (Mario Rucio from CERN) for using myproxy.egi.eu

BioVeL

  1. Autumn newsletter proof reading contribution (BioVeL / OpenBio / EGI collaboration)
  2. ENM Play Day
    • Manage 2nd Play Day (15th Nov. 2013 @ 15 CET)
    • Manage 1st Play Day post-mortem topics: ENM WF dependencies; WF tests.
  3. R @ EGI: disseminate findings;engage BioVeL with UNICORE team
  4. EUBON use case meeting

ER-flow

  1. Finding data providers for the 4 ER-flow communities
  2. additional data about VREs

AppDB (dd/mm/yyyy)

CRM (dd/mm/yyyy)

TMP (dd/mm/yyyy)

SA1

report

SA2

SA2.1

SA2.2

SA2.3

Verification status:

RC testing:

New QCv6:

SA2.4

SA4

Summary

The Liferay mini project has completed most of its work, and is extending the scope towards authentication in Liferay and a more thorough evaluaiton of Liferay for replacing the current EGI.eu backoffice. The rOCCI project is continuously fixing bugs and extending the test coverage. The CDMI mini project is releasing the command line client, and the extending documentation and examples. The Slipstream OCCI connector is upgraded to support Slipstream API v2; Slipstream needs to support Ruby runtime since the connector is incorporating the rOCCI client. The AppDeployment team is testing OCCI in OpenStack Havanna, and further implementing the frontend. The CloudCapabilities team is encountering software license issues in private images, which needs to be properly added into the AUP.

TSA4.1 - Management

TSA4.2 - MOOC

no report given

TSA4.3 - Liferay

TSA4.4 - OCCI for CMF

rOCCI framework
rOCCI-server
ToDo for next week
Problems
Delays

TSA4.5 - CDMI in CMF

Progress:
Plans for the next period:
Problems we encounter, but can solve:
Problems and issues we need external help with:

None

TSA4.6 - OCCI CompClouds

Progress:
Problems we encounter, but can solve:

None

Problems and issues we need external help with:

None

TSA4.7 - AppDeployment

Progress:
Plans for next week:

TSA4.8 - CloudCapabilities

Progress:
Plans for next week
Problems we encountered, but can solve in the mini-project:
Problems and issues we need external help with:

TSA4.9 - VAPOR

bi-weekly reporting

TSA4.10 - CompReports

Progress:
Plans for next sprint
Problems we encountered, but can solve:

None

Problems and issues we need external help with

None

TSA4.12 - AllocateFedRes

bi-weekly reporting

JRA1

Report: Inspire_jra1_2013-11-05