Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "Performance"

From EGIWiki
Jump to navigation Jump to search
Line 59: Line 59:


*[[Grid_operations_oversight/CandidateSuspendedSitesList|List]] of CANDIDATE/SUSPENDED sites waiting to be certified
*[[Grid_operations_oversight/CandidateSuspendedSitesList|List]] of CANDIDATE/SUSPENDED sites waiting to be certified
= Links  =
*Definition of Availability and Reliability and related computation algorithm ([https://tomtools.cern.ch/confluence/download/attachments/2261694/Ace_Service_Availability_Computation.pdf?version=1&modificationDate=1314361543000 paper])
*NEW! [https://wiki.egi.eu/wiki/Availability_and_reliability_tests List of Nagios tests] used for availability computation
*[https://tomtools.cern.ch/confluence/display/SAM/ACE Availability Computation Engine (ACE) home page]
*[https://wiki.egi.eu/wiki/Availability_and_reliability_internal_procedure_for_COD COD procedure for oversight of availability and reliability performance]
*Impact of change of suspension policy for under-performing sites: [https://wiki.egi.eu/wiki/Availability_and_reliability_threshold_change_impact report]
<!-- DEPRECATED LINKS
* [https://twiki.cern.ch/twiki/pub/LCG/GridView/Gridview_Service_Availability_Computation.pdf paper]
* [https://twiki.cern.ch/twiki/bin/view/LCG/ACE (Old) Availability Computation Engine] (ACE)
* [https://twiki.cern.ch/twiki/bin/view/EGEE/MonthlyAvailability EGEE-III Comments on site availability and reliability statistics]
*[http://gvdev.cern.ch/GVPC/Excel/ '''(DEPRECATED)''' GridView availability/reliability report generator] (providing access to the database including Nagios results for OPS and  SAM results for VOs)
*[http://gridview015.cern.ch/GVPC/Excel/ACE/ ACE report generator]
*[https://gvdev.cern.ch/ACEVAL/ace_index.php ACE visualization portal]-->

Revision as of 11:05, 22 October 2012

Main EGI.eu operations services Support Documentation Tools Activities Performance Technology Catch-all Services Resource Allocation Security


This page provides:

  • information on the service level targets of Resource Centres and NGIs/EIROs used for performance monthly reports
  • links to MyEGI and the Operations Portal providing on-line access to performance figures
  • links to the monthly performance reports.


Type of

infrastructure

Service Level Statistics Monthly Reports Profile for A/R Computations Service Level Targets OLA
Resource Centres on-line statistics (from Operations Portal, certificate required) RC monthly reports ROC_CRITICAL levels and targets RC OLA
NGI/EIRO Top-BDII on-line statistics (from Operations Portal, certificate required) NGI monthly reports ROC levels and targets RP OLA

Authoritative Top-BDII instances

LIST of NGIs' authoritative Top-BDIIs (used for Availability and Reliability computation)

NGI services in GOCDB

Links

  • Get status transition of a site: example
  • List of CANDIDATE/SUSPENDED sites waiting to be certified

Links

  • Definition of Availability and Reliability and related computation algorithm (paper)