Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "Performance"

From EGIWiki
Jump to navigation Jump to search
Line 12: Line 12:
'''infrastructure'''
'''infrastructure'''
| '''Service Level Targets'''  
| '''Service Level Targets'''  
| OLA
| '''Service Level Statistics'''  
| '''Service Level Statistics'''  
(MyEGI, choose "ROC_CRITICAL" profile)
(MyEGI, choose "ROC_CRITICAL" profile)
Line 18: Line 19:
| '''Resource Centres'''
| '''Resource Centres'''
| [[SLM/RC_Service_Levels|levels and targets]]
| [[SLM/RC_Service_Levels|levels and targets]]
| [ https://documents.egi.eu/document/31 RC OLA]
| [https://grid-monitoring.cern.ch/myegi/sa/ on-line statistics]
| [https://grid-monitoring.cern.ch/myegi/sa/ on-line statistics]
| [[Availability_and_reliability_monthly_statistics#Resource_Centres | monthly reports]]
| [[Availability_and_reliability_monthly_statistics#Resource_Centres | monthly reports]]
Line 23: Line 25:
| '''NGI/EIRO'''
| '''NGI/EIRO'''
| [[SLM/RP_Service_Levels |levels and targets]]
| [[SLM/RP_Service_Levels |levels and targets]]
| [https://documents.egi.eu/document/463 RP OLA]
| [[SLM/RP service level statistics| on-line statistics]]
| [[SLM/RP service level statistics| on-line statistics]]
| [[Availability_and_reliability_monthly_statistics#NGIs.2FEIROs| monthly reports]]
| [[Availability_and_reliability_monthly_statistics#NGIs.2FEIROs| monthly reports]]

Revision as of 08:29, 5 June 2012

Main EGI.eu operations services Support Documentation Tools Activities Performance Technology Catch-all Services Resource Allocation Security



This page provides:

  • information on the service level targets of Resource Centres and NGIs/EIROs used for performance monthly reports
  • links to MyEGI providing on-line access to performance figures
  • links to the monthly performance reports.


Type of

infrastructure

Service Level Targets OLA Service Level Statistics

(MyEGI, choose "ROC_CRITICAL" profile)

Monthly Reports
Resource Centres levels and targets [ https://documents.egi.eu/document/31 RC OLA] on-line statistics monthly reports
NGI/EIRO levels and targets RP OLA on-line statistics monthly reports


Links

  • Get status transition of a site: example
  • List of CANDIDATE/SUSPENDED sites waiting to be certified