Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "Operations and Operations Support"

From EGIWiki
Jump to navigation Jump to search
Line 125: Line 125:
*[[WI08 Unknown report followup|WI08 - Unknown report work instruction]]
*[[WI08 Unknown report followup|WI08 - Unknown report work instruction]]


 
<br>


= Resources  =
= Resources  =
Line 136: Line 136:


*[[Grid operations oversight/OperationsSupportMetrics summary|Operations Support Metrics - reports summary]]-->  
*[[Grid operations oversight/OperationsSupportMetrics summary|Operations Support Metrics - reports summary]]-->  
Definition of [[Operations support metrics|Operations Support metrics]]
=== May 2010-Sep 2011  ===
*Operations Support [https://documents.egi.eu/document/155 metrics]
=== Until April 2010  ===
*EGEE-III Operations Support [https://documents.egi.eu/document/829 metrics]
== Nagios tests  ==
*[[Operations SAM tests|Operations tests list ]]: list of Nagios probes generating alarms for visualization in the Operations Dashboard
*[[Availability SAM tests|Availability and reliability tests list]]: list of Nagios probes whose results are used for Availability and Reliability computation
== OTAG topics  ==
=== Operational Portal: Dashboard  ===
*[http://bit.ly/dZ3RWN RT tickets]
*[[COD Interaction with Dashboard team|COD interactions with Dashboard team (draft)]]
*[[COD OTAG topics|COD topics to be discussed on OTAG meeting]]
== Pages in draft state  ==
*[[Availability procedure improvements|Improvements to Availability Calculation Procedure (draft)]]
*[[Candidate or Suspended sites|Candidate Suspended Sites List]]


<br>  
<br>  


[[Category:Grid_Oversight]]
[[Category:Grid_Oversight]]

Revision as of 16:06, 19 August 2014

Main EGI.eu operations services Support Documentation Tools Activities Performance Technology Catch-all Services Resource Allocation Security


EGI Infrastructure Operations Oversight menu: Home EGI.eu Operations Team Regional Operators (ROD) 




Introduction

This page collects internal materials needed by EGI.eu Operations and EGI Operations Support team to perform the EGI Infrastructure operations oversight activities.

Contact

EGI.eu Operations:

  • GGUS Support Unit:Operations
  • operations @ egi.eu

EGI Operations Support:

  • GGUS Suport Unit: COD
  • operations-support @ mailman.egi.eu

Actions

In this section are collected all work instructions containing detailed information specifying exactly what steps are to be followed to carry out an activity.

Action Responsible
Procedure Instructions and related pages
ROD certification OS
Creation of a new NGI OS
Operations Centre decommission O

Setting a Nagios test to an operations test O

Operational portal dashboard issues O
Availability/reliability followup procedure O
Unknown followup procedure O
Top-level BDII followup procedure O
ROD performance index followup procedure O

Work Instructions


Resources