Difference between revisions of "Operations Manuals"
Jump to navigation
Jump to search
(→FAQs) |
|||
Line 146: | Line 146: | ||
| - | | - | ||
| Grid Oversight (ROD) | | Grid Oversight (ROD) | ||
| [Grid_operations_oversight/ROD_FAQ Grid operations oversight FAQ] | | [[Grid_operations_oversight/ROD_FAQ Grid operations oversight FAQ]] | ||
|} | |} |
Revision as of 12:52, 16 November 2012
Main | EGI.eu operations services | Support | Documentation | Tools | Activities | Performance | Technology | Catch-all Services | Resource Allocation | Security |
Documentation menu: | Home • | Manuals • | Procedures • | Training • | Other • | Contact ► | For: | VO managers • | Administrators |
Manuals
The EGI Operations Manuals are approved technical documents that provide prescriptive guidelines on how to complete a given task. These documents are periodically reviewed, and need to be followed by all partners (as opposed to a best-practice documents that provide optional guidelines).
Number | Category | Title | Comment | Relevant to | Status |
MAN 01 | Operations | Publishing Site Information | Instructions on how to use attributes in the GlueSite object. | Resource Centre administrators | approved |
MAN 02 | Operations | Service Intervention Management | Instructions on how to manage a service intervention, i.e. an action which will involve or lead to the possibility of a loss, or noticeable degradation of a service. | Resource Centre administrators | approved |
MAN 03 | Middleware | MPI-Start Installation and Configuration | Instructions for Resource Centre administrators on how to install and configure MPI-Start | Resource Centre administrators | approved by the MPI-support team |
MAN 04 | Operations | Tool Intervention Management | This manual provides information on how to manage central operational tool unscheduled downtimes. | Central tool administrators | approved, 01 August 2011 |
MAN 05 | Middleware | (EMI.gLite) top-BDII High Availability | Instructions for the implementation of a top-BDII High Availability configuration | Resource Centre administrators | approved, June 2011 (OMB and EMI) |
Troubleshooting and Grid Administration
HowTos
Miscellaneous collection of short HowTos which are relevant to various other documentation, procedures, etc.
Number | Title | Comment | Relevant to | Status |
HOWTO 01 | Site Certification Required Information | Information required in the GOCDB when registering a site/resource centre | Resource Centres, Operations Centres | Ready |
HOWTO 02 | Site Certification Required Documentation | Short list of documentation required to read when registering a site/resource centre | Resource Centres, Operations Centres | Ready |
HOWTO 03 | Site Certification GIIS Check | Information to check GIIS/BDII published information when certifying a site/resource centre | Resource Centres, Operations Centres | Ready |
HOWTO 04 | Site Certification Manual tests | Information for how to manually test services when certifying a site/resource centre | Resource Centres, Operations Centres | Needs work |
HOWTO 05 | How to publish the OS name | Enter the correct values in the site-info.def of your CE | Resource Centres, Operations Centres | Needs work |
HOWTO 06 | How to publish the system architecture | Enter the correct values for GlueHostArchitecturePlatformType | Resource Centres, Operations Centres | Needs work |
HOWTO 07 | How to change the Site-BDII | Step by step how-to | Resource Centres | Review needed |
FAQs
Frequently Asked Questions are question/answer documents providing information on specific technical areas. The FAQ provides a high-level overview of the issue and collection of links for futher investigation .
Number | Area | Title |
FAQ01 | Accounting, Installed Capacity | Using HEP SPEC 06 |
FAQ02 | Middleware | Transition from lcg-CE to CREAM |
FAQ03 | User | Renewing a personal certificate |
- | Grid Administration FAQs | Grid Administration |
- | Support | GGUS FAQs |
- | Site management | GOCDB FAQ |
- | Grid Oversight (ROD) | Grid_operations_oversight/ROD_FAQ Grid operations oversight FAQ |