Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "OMB"

From EGIWiki
Jump to navigation Jump to search
Line 26: Line 26:
===May 2011===
===May 2011===
* ACTION 1. DEADLINE 01 May. Deadline for submission of QR4. Submission of QR4 will follow the same procedure adopted for QR3. Information needs to be supplied on wiki. Links to submit the NGI report and metrics are available at https://wiki.egi.eu/wiki/NGI_QR_Reports_and_Metrics
* ACTION 1. DEADLINE 01 May. Deadline for submission of QR4. Submission of QR4 will follow the same procedure adopted for QR3. Information needs to be supplied on wiki. Links to submit the NGI report and metrics are available at https://wiki.egi.eu/wiki/NGI_QR_Reports_and_Metrics
* ACTION 2. DEADLINE 16 May. At the January OMB meeting we discussed the mechanisms for the monitoring of uncertified sites before they join the production infrastructure. The solution discussed and approved relies on the the NGI Nagios service already deployed in production, which needs to be properly configured to take into account uncertified sites. In addition to configuration, an additional couple of services (WMS and top-BDII) for uncertified sites needs to be deployed.
As this solution is not suitable for small NGIs, EGI will provide one WMS and one top-BDII (catch all) for the NGIs that have such a need. These services will be operated by GRNET/AUTH (task TSA1.8). As these services are not critical, they will be operated in a best-effort manner (no HA configuration will be deployed).
If your NGI is interested please provide feedback.


===April 2011===
===April 2011===

Revision as of 19:29, 18 April 2011

Main EGI.eu operations services Support Documentation Tools Activities Performance Technology Catch-all Services Resource Allocation Security



The Operations Management Board (OMB) is a EGI policy board which aims to define policies needed to provide a reliable transparent infrastructure composed of multiple national infrastructure providers (Terms of Reference).


Contact information noc-managers at mailman dot egi dot eu
Membership NGI Operations Managers, EGI-InSPIRE SA1 task leaders, EGI.eu COO
Meetings OMB on Indico
OMB Documents Document DB
Actions noc-managers queue on EGI Request Tracker

The Operations Manager's Agenda

May 2011

  • ACTION 1. DEADLINE 01 May. Deadline for submission of QR4. Submission of QR4 will follow the same procedure adopted for QR3. Information needs to be supplied on wiki. Links to submit the NGI report and metrics are available at https://wiki.egi.eu/wiki/NGI_QR_Reports_and_Metrics
  • ACTION 2. DEADLINE 16 May. At the January OMB meeting we discussed the mechanisms for the monitoring of uncertified sites before they join the production infrastructure. The solution discussed and approved relies on the the NGI Nagios service already deployed in production, which needs to be properly configured to take into account uncertified sites. In addition to configuration, an additional couple of services (WMS and top-BDII) for uncertified sites needs to be deployed.

As this solution is not suitable for small NGIs, EGI will provide one WMS and one top-BDII (catch all) for the NGIs that have such a need. These services will be operated by GRNET/AUTH (task TSA1.8). As these services are not critical, they will be operated in a best-effort manner (no HA configuration will be deployed).

If your NGI is interested please provide feedback.

April 2011

  • ACTION 1. DEADLINE 06 April. ALL NGIs are invited to specify the list of components from EMI 1.0 that should be integrated in UMD at HIGH PRIORITY. Input needs to be provided here. Information on release notes per component (where available) are accessible from the EMI Release page.

March 2011

  • ACTION 1 (CLOSED). All NGIs to contact sites that deploy gLite 3.1 DPM to check problems and timelines to upgrade to gLite 3.2 or UMD 1.0, and to report the feedbacl to the OMB. In case of many sites with upgrade problems, we will request a memory leak in glite 3.1 DPM (due to a VOMS library) to be fixed by EMI.
  • ACTION 2 (CLOSED). DEADLINE 09 MARCH. To provide input on your self-assessment of NGI international tasks that will be used for MS109. Input is collected on wiki here.

NGI international task metrics will be collected by EGI.eu here

In case of sufficient interest this will be handed as a requirement to EMI.

Previous OMB agendas


Tferrari 09:49, 4 February 2011 (UTC)