EGI-InSPIRE:Sa1 2013-06-18

From EGIWiki
Revision as of 12:20, 19 June 2013 by Ljocha (talk | contribs) (Software Support)
Jump to: navigation, search
Main EGI.eu operations services Support Documentation Tools Activities Performance Technology Catch-all Services Resource Allocation Security


Inspire reports menu: Home SA1 weekly Reports SA1 Task QR Reports NGI QR Reports NGI QR User support Reports


Progress of SA1 issues

Nothing new to report.

Milestones/Deliverables

SA1.1 Activity Management

MEETINGS

ACTIVITIES

SA1.2 Security

  • ongoing work handling the kernel vulnerability CVE-2013-2094
  • prepare final version of the procedure on handling compromised certificates and the emergency suspension
    • present this document at the OMB meeting
  • preparations for the EGI-InSPIRE review
  • SVG: 1 new vulnerability reported

SA1.3 Staged rollout

  • Released on the 12 of June the UMD-2 Update 6
  • UMD-3 activities:
    • Storm 1.1.1 entered into SR;
    • Several unicore products passed SR and are ready to enter production

SA1.3 Integration

  • ongoing work Cloud site certification

SA1.4 Central tools

  • FedCloud monitoring
    • modified accounting probe to be consistent with APEL-Pub
    • work on the OCCI probe for OpenStack endpoints
  • Analysis of Central-LFC endpoints monitoring
    • several NGIs are missing tests which causes UNKNOWNs in ROC_OPERATORS profile
  • Presenting SAM status at the OMB

SA1.5 Accounting

Repository

Portal

SA1.6 Helpdesk

  • Ticket monitoring
  • preparing next release and implementing feature requests

SA1.7 Support

ho == Software Support == 6!-- A Krenek -->

DMSU tickets flow Jun 9 -- 15
assigned 2
back to tpm 0
reassigned to 3rd level 1
solved 2
open DMSU tickets status
assigned 0
in progress 0
waiting for reply 2
on hold 2

Network Support

SA1.8 Availability and core services

Documentation

  • Procedure 17 - applying comments from NGIS

Meetings