Difference between revisions of "EGI-InSPIRE:SA1.8-QR8"
Jump to navigation
Jump to search
m (moved SA1.8-QR8 to EGI-InSPIRE:SA1.8-QR8) |
|||
Line 1: | Line 1: | ||
{{Template: | {{Template:EGI-Inspire menubar}} | ||
{{Template:Inspire_reports_menubar}} | {{Template:Inspire_reports_menubar}} | ||
{{TOC_right}} | {{TOC_right}} | ||
= 1. Task Meetings = | = 1. Task Meetings = | ||
<!-- | <!-- |
Latest revision as of 19:18, 6 January 2015
EGI Inspire Main page |
Inspire reports menu: | Home • | SA1 weekly Reports • | SA1 Task QR Reports • | NGI QR Reports • | NGI QR User support Reports |
1. Task Meetings
Date (dd/mm/yyyy) | Url Indico Agenda | Title | Outcome |
---|---|---|---|
2. Main Achievements
- Continue publishing of A/R league tables - OPS
- Continue publishing of A/R reports for NGI Core services (top-BDII)
- The RC OLA was updated to v1.1. Changes were approved at OMB (2012-02-28)
- The RP OLA was updated to v1.1. Changes were approved at OMB (2012-02-28)
- A draft version of EGI.eu OLA has been published.
- Assessment of the EGI.eu central tools service level targets.
The availability metrics for individual tool instances were extracted from the Nagios and presented at the OMB (2012-02-28).
The OMB agreed to the proposed service level targets.
- A draft version of MS418 "Operational Level Agreements (OLAs) within the EGI production infrastructure" has been published.
- Clarify the procedure for EGI sites/regions in the new SAM Availability Re-computation Policy.
- Starting from the February 2012 A/R reports, a parent GGUS ticket is created per month in order to gather all the re-computation requests.
EGI Catch-All Core Service
- Operation of WMS, LB and Top-BDII for site certification
- Operation of certification Catch-All portal
dteam VO
- Operation of VOMS/VORMS for dteam VO.
- New dteam/EGI group has been created. The dteam Acceptable Use Policy had to change slightly to allow this.
- New dteam/NGI_UA (Ukraine) has been created.
- Add the new "UK e-Science CA 2B" certificate to all the dteam VO members which had the old "UK e-Science CA" [1].
3. Issues and Mitigation
Issue Description | Mitigation Description |
---|---|
4. Plans for the next period
- The final version of EGI.eu OLA is expected in 2012Q3
- The milestone MS418 "Operational Level Agreements (OLAs) within the EGI production infrastructure" is expected in 2012Q2
- Continue the handling the validation and distribution of the monthly A/R reports and the maintenance of the relevant wiki page