Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "EGI-InSPIRE:Plan 2014 SA1.4"

From EGIWiki
Jump to navigation Jump to search
Line 9: Line 9:


* Operations portal: Refactoring dashboards
* Operations portal: Refactoring dashboards
** To increase the efficiency and the maintainability of the different dashboards (security dashboard, VO Dashboard, Operations Dashboard) the code is currently reviewed and improved. This work has been initiated during summer and will last at least until the middle of the year 2013.
** To increase the efficiency and the maintainability of the different dashboards (security dashboard, VO Dashboard, Operations Dashboard) the code was currently reviewed and improved.


* GOCDB v5
* GOCDB v5
** GOCDB v5 was released on October 2nd. The new version introduced more non-exclusive scope tags for hosting multiple projects in the same instance. The existing scope PI parameter will support a comma-separated list of scope values rather than exclusive EGI or Local scope values. In addition the new version uses the Doctrine ORM which enables support of RDBMSs other than Oracle.
** GOCDB v5 was released on October 2nd 2013. The new version introduced more non-exclusive scope tags for hosting multiple projects in the same instance. The existing scope PI parameter will support a comma-separated list of scope values rather than exclusive EGI or Local scope values. In addition the new version uses the Doctrine ORM which enables support of RDBMSs other than Oracle.
This will introduce changes to the existing PI (https://wiki.egi.eu/wiki/Doctrine). This release will require acceptance testing by dependent PTs.  
** The failover will need to be updated simultaneously on production release.
** The failover will need to be updated simultaneously on production release.
** V5 will introduce more non-exclusive scope tags for hosting multiple projects in the same instance. The existing scope PI parameter will support a comma-separated list of scope values rather than exclusive EGI or Local scope values.
** V5 will introduce more non-exclusive scope tags for hosting multiple projects in the same instance. The existing scope PI parameter will support a comma-separated list of scope values rather than exclusive EGI or Local scope values.


* SAM: Integration of EMI probes
* SAM: Integration of EMI probes
** SAM Update-22 released in October 2013 contained EMI probes.
** SAM Update-22 released on October 2013 contained EMI probes.


=== GOCDB ===
=== GOCDB ===
Line 32: Line 30:
** V5 will introduce more non-exclusive scope tags for hosting multiple projects in the same instance. The existing scope PI parameter will support a comma-separated list of scope values rather than exclusive EGI or Local scope values.
** V5 will introduce more non-exclusive scope tags for hosting multiple projects in the same instance. The existing scope PI parameter will support a comma-separated list of scope values rather than exclusive EGI or Local scope values.
** Completion time: 5/2013
** Completion time: 5/2013
=== SAM ===




Line 40: Line 35:


* Operations portal: Availabilities and reliabilities report system
* Operations portal: Availabilities and reliabilities report system
** A new availabilities/reliabilities reporting system was developed. Deployment was postponed due to the work on miniproject  
** A new availabilities/reliabilities reporting system was developed. Release was postponed due to the work on the miniproject "A new approach to Computing A/R Reports".


* Operations portal: Improvement of sam-MSG-ops portal synchronization
* Operations portal: Improvement of sam-MSG-ops portal synchronization
** Operations Dashboard to start using virtual destination for synchronization with SAM.
** Development of better synchronization of Operations Portal with SAM was done, but release was postponed due to the work on the miniproject.


== Plans for 2014  ==
== Plans for 2014  ==

Revision as of 15:13, 21 December 2013

Main EGI.eu operations services Support Documentation Tools Activities Performance Technology Catch-all Services Resource Allocation Security


Inspire reports menu: Home SA1 weekly Reports SA1 Task QR Reports NGI QR Reports NGI QR User support Reports



Assessment of progress in 2013

Completed Activities and Milestones

  • MSG: Enhance monitoring tools for PROD MSG network
    • CERN team implemented detailed monitoring of queues used by known clients.
  • Operations portal: Refactoring dashboards
    • To increase the efficiency and the maintainability of the different dashboards (security dashboard, VO Dashboard, Operations Dashboard) the code was currently reviewed and improved.
  • GOCDB v5
    • GOCDB v5 was released on October 2nd 2013. The new version introduced more non-exclusive scope tags for hosting multiple projects in the same instance. The existing scope PI parameter will support a comma-separated list of scope values rather than exclusive EGI or Local scope values. In addition the new version uses the Doctrine ORM which enables support of RDBMSs other than Oracle.
    • The failover will need to be updated simultaneously on production release.
    • V5 will introduce more non-exclusive scope tags for hosting multiple projects in the same instance. The existing scope PI parameter will support a comma-separated list of scope values rather than exclusive EGI or Local scope values.
  • SAM: Integration of EMI probes
    • SAM Update-22 released on October 2013 contained EMI probes.

GOCDB

  • GOCDB: Automatic DNS switching to failover instance
    • Automatic DNS switching to dynamically re-point the goc.egi.eu domain still needs to be investigated.
    • Completion time: Q2/2013
  • GOCDB v5
    • GOCDB v5 is scheduled for release end ~April/May. This will introduce changes to the existing PI (https://wiki.egi.eu/wiki/Doctrine). This release will require acceptance testing by dependent PTs.
    • The failover will need to be updated simultaneously on production release.
    • V5 will introduce more non-exclusive scope tags for hosting multiple projects in the same instance. The existing scope PI parameter will support a comma-separated list of scope values rather than exclusive EGI or Local scope values.
    • Completion time: 5/2013


Milestones not accomplished

  • Operations portal: Availabilities and reliabilities report system
    • A new availabilities/reliabilities reporting system was developed. Release was postponed due to the work on the miniproject "A new approach to Computing A/R Reports".
  • Operations portal: Improvement of sam-MSG-ops portal synchronization
    • Development of better synchronization of Operations Portal with SAM was done, but release was postponed due to the work on the miniproject.

Plans for 2014