Difference between revisions of "EGI-InSPIRE:Ibergrid-QR7"
Jump to navigation
Jump to search
m (moved Ibergrid-QR7 to EGI-InSPIRE:Ibergrid-QR7) |
|||
(10 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
{{Template:EGI-Inspire menubar}} | |||
{{Template:Inspire_reports_menubar}} | |||
{{TOC_right}} | |||
{| border="1" cellspacing="0" cellpadding="2" | {| border="1" cellspacing="0" cellpadding="2" | ||
|- | |- | ||
Line 156: | Line 159: | ||
* Enforcement of the TopBDII HA mechanism at local sites. | * Enforcement of the TopBDII HA mechanism at local sites. | ||
* 100% A/R in Dec 2011 for the TopBDII service (after the implementation of the TopBDII HA mechanism). | * 100% A/R in Dec 2011 for the TopBDII service (after the implementation of the TopBDII HA mechanism). | ||
* No sites bellow the A/R threshold in Dec 2012 | |||
<br /> | <br /> | ||
Line 165: | Line 169: | ||
!scope="col"| Mitigation Description | !scope="col"| Mitigation Description | ||
|- | |- | ||
| | |||
* Failure in the infrastructure in which the Ibergrid Regional Nagios machine is being executed on. Unscheduled downtime: start time: 12/21/2011 13:00 PM CET; end time: 12/22/2011 16:00 PM CET. GGUS ticket asking for recomputation of A/R for Ibergrid sites: https://ggus.eu/ws/ticket_info.php?ticket=77695. | |||
| Recomputation already processed and ticket is closed and verified. | |||
|- | |||
| | |||
* Failure in the TopBDII HA mechanism between implemented between LIP and CESGA: start time: 01/19/2012 22:00 PM CET; end time: 01/20/2012 10:00 AM CET. GGUS ticket asking for recomputation of A/R for Ibergrid sites: https://ggus.eu/ws/ticket_info.php?ticket=78443 | |||
| | |||
|- | |||
| | |||
* Discussion about ROD metrics and ROD metrics recomputation with COD via https://ggus.eu/ws/ticket_info.php?ticket=78285 | |||
| | |||
|- | |||
| | |||
* VOMS membership expiration problem reported in https://ggus.eu/tech/ticket_show.php?ticket=78178 | |||
| Supported as provided a workarund, and a new requirement has been set. | |||
|} | |} | ||
Latest revision as of 18:46, 22 January 2015
EGI Inspire Main page |
Inspire reports menu: | Home • | SA1 weekly Reports • | SA1 Task QR Reports • | NGI QR Reports • | NGI QR User support Reports |
Quarterly Report Number | NGI Name | Partner Name | Author |
---|---|---|---|
QR7 | NGI_IBERGRID | LIP & CSIC | Goncalo Borges (LIP) |
1. MEETINGS AND DISSEMINATION
1.1. CONFERENCES/WORKSHOPS ORGANISED
Date | Location | Title | Participants | Outcome (Short report & Indico URL) |
---|---|---|---|---|
13th-14th December 2012 | LIP, Lisbon, Portugal | 1st Ibergrid Cloud Meeting | ~ 15 |
|
19th-20th Jan 2012 | CIEMAT, Madrid, Spain | Spanish NGI users conference | ~ 50 |
|
1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED
Date | Location | Title | Participants | Outcome (Short report & Indico URL) |
---|---|---|---|---|
2-4 Nov 2011 | Barcelona, Spain | III CPAN days | 1 |
http://indico.ific.uv.es/indico/conferenceTimeTable.py?confId=433 |
20 Nov - 01 Dec 2011 | Valladolid, Spain | Rediris Techical days | 3 |
|
19th-20th Jan 2012 | Madrid, Spain | Spanish NGI users conference | ~ 50 |
|
23rd Jan 2012 | Amesterdam, Netherlands | WLCG TEG - Operations | 2 |
|
24th-25th Jan 2012 | Amesterdam, Netherlands | WLCG TEG - Storage Management & Data Management | 2 |
|
26th Jan 2012 | Amesterdam, Netherlands | WLCG TEG - Security | ~ 2 |
|
30-31 Jan 2012 | LBL Berkeley, USA | LHCOPN and LHCONE joint meeting | 1 |
|
1.3. PUBLICATIONS
Publication title | Journal / Proceedings title | Journal references Volume number Issue Pages from - to |
Authors 1. 2. 3. Et al? |
---|
2. ACTIVITY REPORT
2.1. Progress Summary
- Introduction of a montly review / discussion regarding open security issues (as reported by the security dashboard). Collect site feedback regarding those issues.
- Discussion of the monthly performance for IBERGRID sites and IBERGRID core services.
- Deployment and operation of a TopBDII HA mechanism. Enforcement of the TopBDII HA mechanism at local sites.
- Glue 2.0 enforcement. All sites were checked regarding the GLUE 2.0 information publishing at the site bdii level. 10 GGUS ticket were open and currently 5 remain to be solved.
- Review and discuss the changes in GOCDB for the registration of NGI services in order to produce NGI Availability/Reliability statistics
- Review and discuss GOCDB roles restructuring proposal
- Review the resource Centre Decommissioning Procedure
- Collect and submit requirements to EMI 3.0
- Complete the EGI Global Services survey and NGI International Services survey
- Broadcast SA1 directives and surveys aimed for sites (SLURM support for CREAM)
- Report on OMB meetings and receive feedback.
2.2. Main Achievements
- Introduction of a montly review / discussion regarding open security issues (as reported by the security dashboard). Collect site feedback regarding those issues.
- Enforcement of the TopBDII HA mechanism at local sites.
- 100% A/R in Dec 2011 for the TopBDII service (after the implementation of the TopBDII HA mechanism).
- No sites bellow the A/R threshold in Dec 2012
2.3. Issues and mitigation
Issue Description | Mitigation Description |
---|---|
|
Recomputation already processed and ticket is closed and verified. |
|
|
|
|
|
Supported as provided a workarund, and a new requirement has been set. |