Difference between revisions of "EGI-InSPIRE:Ibergrid-QR7"
Jump to navigation
Jump to search
m (moved Ibergrid-QR7 to EGI-InSPIRE:Ibergrid-QR7) |
|||
(28 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
{{Template:EGI-Inspire menubar}} | |||
{{Template:Inspire_reports_menubar}} | |||
{{TOC_right}} | |||
{| border="1" cellspacing="0" cellpadding="2" | {| border="1" cellspacing="0" cellpadding="2" | ||
|- | |- | ||
Line 37: | Line 40: | ||
|- | |- | ||
|13th-14th December 2012 | |13th-14th December 2012 | ||
|Lisbon, Portugal | |LIP, Lisbon, Portugal | ||
| | | 1st Ibergrid Cloud Meeting | ||
|~ 15 | |~ 15 | ||
| | | | ||
* | * http://ibergrid.lip.pt/OD/Others/1st%20Ibergrid%20Cloud%20Meeting | ||
* Startup of the IberCloud initiative aiming to implement a cloud infrastructure in for Ibergrid Users | * Startup of the IberCloud initiative aiming to implement a cloud infrastructure in for Ibergrid Users | ||
|- | |- | ||
| 19th-20th Jan 2012 | | 19th-20th Jan 2012 | ||
| Madrid, Spain | | CIEMAT, Madrid, Spain | ||
| | | Spanish NGI users conference | ||
| ~ 50 | | ~ 50 | ||
| | | | ||
* | * http://indico.ifca.es/indico/conferenceDisplay.py?confId=399. | ||
* The topics covered in the workshop were: 1- Integration of applications in distributed infrastructures. This topic focuses on success stories from applications in distributed infrastructures and an analysis of tools for improving the efficient usage of infrastructures (e.g. Job management, scientific gateways, workflow enactment, etc.) both standard or developed by the teams that use them. 2- Presentation of the user Access portal and technologies (such as the access to Grid resources from the web interface) 3- Description of needs and evaluation of the current access mechanism. 4- Round table and debate: Do users need Cloud-like distributed computing models? The virtualization of services inside the resource centres is a very useful technique for system administrators. The purpose of this round table is to survey the opinions of users about the possibility of offering resources in the form of Infrastructures as a Services (such as Amazon EC2). | * The topics covered in the workshop were: 1- Integration of applications in distributed infrastructures. This topic focuses on success stories from applications in distributed infrastructures and an analysis of tools for improving the efficient usage of infrastructures (e.g. Job management, scientific gateways, workflow enactment, etc.) both standard or developed by the teams that use them. 2- Presentation of the user Access portal and technologies (such as the access to Grid resources from the web interface) 3- Description of needs and evaluation of the current access mechanism. 4- Round table and debate: Do users need Cloud-like distributed computing models? The virtualization of services inside the resource centres is a very useful technique for system administrators. The purpose of this round table is to survey the opinions of users about the possibility of offering resources in the form of Infrastructures as a Services (such as Amazon EC2). | ||
|} | |} | ||
Line 61: | Line 64: | ||
!scope="col"|Date||Location||Title||Participants||Outcome (Short report & Indico URL) | !scope="col"|Date||Location||Title||Participants||Outcome (Short report & Indico URL) | ||
|- | |- | ||
|- | |- | ||
| 2-4 Nov 2011 | | 2-4 Nov 2011 | ||
Line 74: | Line 70: | ||
| 1 | | 1 | ||
| | | | ||
* | * IFAE: Annual conference of the National Centre of Particle, Astroparticle and Nuclear Physics. Attending the spanish participation in the LHC sessions, in representation of the Tier1. | ||
http://indico.ific.uv.es/indico/conferenceTimeTable.py?confId=433 | http://indico.ific.uv.es/indico/conferenceTimeTable.py?confId=433 | ||
|- | |- | ||
Line 82: | Line 78: | ||
| 3 | | 3 | ||
| | | | ||
* | * IFAE: Annual conference organised by the spanish NREN Rediris. PIC made presentations in the Cloud and Network tracks: | ||
** P. Tallada, “Public cloud infrastructure at PIC”, http://wiki.rediris.es/megha/upload/PIC_Megha_GGTT.pdf | |||
** G. Bernabeu, “Deployment of the LHCONE network on Rediris-Nova”, “http://www.rediris.es/jt/jt2011/ponencias/jt/jt2011-jt-opt_redirisnova-a2b1.pdf | |||
|- | |||
| 19th-20th Jan 2012 | |||
| Madrid, Spain | |||
| Spanish NGI users conference | |||
| ~ 50 | |||
| | |||
* Attendance from various institutes since some issues related to operations were discussed. | |||
* IFAE, IFCA: Participation in a panel discussion about cloud computing. http://indico.ifca.es/indico/conferenceDisplay.py?confId=399 | |||
|- | |||
| 23rd Jan 2012 | |||
| Amesterdam, Netherlands | |||
| WLCG TEG - Operations | |||
| 2 | |||
| | |||
* LIP: attendance and participation in the discussion panels for WLCG recommendations. http://indico.cern.ch/conferenceDisplay.py?confId=161833 | |||
|- | |||
| 24th-25th Jan 2012 | |||
| Amesterdam, Netherlands | |||
| WLCG TEG - Storage Management & Data Management | |||
| 2 | |||
| | |||
* LIP: attendance and participation in the discussion panels for WLCG recommendations. https://indico.cern.ch/conferenceDisplay.py?confId=165687 | |||
|- | |||
| 26th Jan 2012 | |||
| Amesterdam, Netherlands | |||
| WLCG TEG - Security | |||
| ~ 2 | |||
| | |||
* LIP: attendance and participation in the discussion panels for WLCG recommendations. http://indico.cern.ch/conferenceDisplay.py?confId=172023 | |||
|- | |- | ||
| 30-31 Jan 2012 | |||
| LBL Berkeley, USA | |||
| LHCOPN and LHCONE joint meeting | |||
| 1 | |||
| | |||
* IFAE: Participation of PIC Tier1 in the technical groups for operation, planning and deployment of network resources dedicated to the LHC. https://indico.cern.ch/conferenceDisplay.py?confId=160533 | |||
30-31 Jan 2012 | |||
LBL Berkeley, USA | |||
LHCOPN and LHCONE joint meeting | |||
Participation of PIC Tier1 in the technical groups for operation, planning and deployment of network resources dedicated to the LHC. | |||
|- | |- | ||
|} | |} | ||
Line 122: | Line 135: | ||
|- | |- | ||
|} | |} | ||
<br/> | |||
== 2. ACTIVITY REPORT == | == 2. ACTIVITY REPORT == | ||
Line 127: | Line 141: | ||
===2.1. Progress Summary=== | ===2.1. Progress Summary=== | ||
* Introduction of a montly review / discussion regarding open security issues (as reported by the security dashboard). Collect site feedback regarding those issues. | |||
* Discussion of the monthly performance for IBERGRID sites and IBERGRID core services. | |||
* Deployment and operation of a TopBDII HA mechanism. Enforcement of the TopBDII HA mechanism at local sites. | |||
* Glue 2.0 enforcement. All sites were checked regarding the GLUE 2.0 information publishing at the site bdii level. 10 GGUS ticket were open and currently 5 remain to be solved. | |||
* Review and discuss the changes in GOCDB for the registration of NGI services in order to produce NGI Availability/Reliability statistics | |||
* Review and discuss GOCDB roles restructuring proposal | |||
* Review the resource Centre Decommissioning Procedure | |||
* Collect and submit requirements to EMI 3.0 | |||
* Complete the EGI Global Services survey and NGI International Services survey | |||
* Broadcast SA1 directives and surveys aimed for sites (SLURM support for CREAM) | |||
* Report on OMB meetings and receive feedback. | |||
<br /> | |||
===2.2. Main Achievements=== | ===2.2. Main Achievements=== | ||
* Introduction of a montly review / discussion regarding open security issues (as reported by the security dashboard). Collect site feedback regarding those issues. | |||
* Enforcement of the TopBDII HA mechanism at local sites. | |||
* 100% A/R in Dec 2011 for the TopBDII service (after the implementation of the TopBDII HA mechanism). | |||
* No sites bellow the A/R threshold in Dec 2012 | |||
<br /> | |||
===2.3. Issues and mitigation=== | ===2.3. Issues and mitigation=== | ||
Line 137: | Line 169: | ||
!scope="col"| Mitigation Description | !scope="col"| Mitigation Description | ||
|- | |- | ||
| | |||
* Failure in the infrastructure in which the Ibergrid Regional Nagios machine is being executed on. Unscheduled downtime: start time: 12/21/2011 13:00 PM CET; end time: 12/22/2011 16:00 PM CET. GGUS ticket asking for recomputation of A/R for Ibergrid sites: https://ggus.eu/ws/ticket_info.php?ticket=77695. | |||
| Recomputation already processed and ticket is closed and verified. | |||
|- | |||
| | |||
* Failure in the TopBDII HA mechanism between implemented between LIP and CESGA: start time: 01/19/2012 22:00 PM CET; end time: 01/20/2012 10:00 AM CET. GGUS ticket asking for recomputation of A/R for Ibergrid sites: https://ggus.eu/ws/ticket_info.php?ticket=78443 | |||
| | |||
|- | |||
| | |||
* Discussion about ROD metrics and ROD metrics recomputation with COD via https://ggus.eu/ws/ticket_info.php?ticket=78285 | |||
| | |||
|- | |||
| | |||
* VOMS membership expiration problem reported in https://ggus.eu/tech/ticket_show.php?ticket=78178 | |||
| Supported as provided a workarund, and a new requirement has been set. | |||
|} | |} | ||
Latest revision as of 18:46, 22 January 2015
EGI Inspire Main page |
Inspire reports menu: | Home • | SA1 weekly Reports • | SA1 Task QR Reports • | NGI QR Reports • | NGI QR User support Reports |
Quarterly Report Number | NGI Name | Partner Name | Author |
---|---|---|---|
QR7 | NGI_IBERGRID | LIP & CSIC | Goncalo Borges (LIP) |
1. MEETINGS AND DISSEMINATION
1.1. CONFERENCES/WORKSHOPS ORGANISED
Date | Location | Title | Participants | Outcome (Short report & Indico URL) |
---|---|---|---|---|
13th-14th December 2012 | LIP, Lisbon, Portugal | 1st Ibergrid Cloud Meeting | ~ 15 |
|
19th-20th Jan 2012 | CIEMAT, Madrid, Spain | Spanish NGI users conference | ~ 50 |
|
1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED
Date | Location | Title | Participants | Outcome (Short report & Indico URL) |
---|---|---|---|---|
2-4 Nov 2011 | Barcelona, Spain | III CPAN days | 1 |
http://indico.ific.uv.es/indico/conferenceTimeTable.py?confId=433 |
20 Nov - 01 Dec 2011 | Valladolid, Spain | Rediris Techical days | 3 |
|
19th-20th Jan 2012 | Madrid, Spain | Spanish NGI users conference | ~ 50 |
|
23rd Jan 2012 | Amesterdam, Netherlands | WLCG TEG - Operations | 2 |
|
24th-25th Jan 2012 | Amesterdam, Netherlands | WLCG TEG - Storage Management & Data Management | 2 |
|
26th Jan 2012 | Amesterdam, Netherlands | WLCG TEG - Security | ~ 2 |
|
30-31 Jan 2012 | LBL Berkeley, USA | LHCOPN and LHCONE joint meeting | 1 |
|
1.3. PUBLICATIONS
Publication title | Journal / Proceedings title | Journal references Volume number Issue Pages from - to |
Authors 1. 2. 3. Et al? |
---|
2. ACTIVITY REPORT
2.1. Progress Summary
- Introduction of a montly review / discussion regarding open security issues (as reported by the security dashboard). Collect site feedback regarding those issues.
- Discussion of the monthly performance for IBERGRID sites and IBERGRID core services.
- Deployment and operation of a TopBDII HA mechanism. Enforcement of the TopBDII HA mechanism at local sites.
- Glue 2.0 enforcement. All sites were checked regarding the GLUE 2.0 information publishing at the site bdii level. 10 GGUS ticket were open and currently 5 remain to be solved.
- Review and discuss the changes in GOCDB for the registration of NGI services in order to produce NGI Availability/Reliability statistics
- Review and discuss GOCDB roles restructuring proposal
- Review the resource Centre Decommissioning Procedure
- Collect and submit requirements to EMI 3.0
- Complete the EGI Global Services survey and NGI International Services survey
- Broadcast SA1 directives and surveys aimed for sites (SLURM support for CREAM)
- Report on OMB meetings and receive feedback.
2.2. Main Achievements
- Introduction of a montly review / discussion regarding open security issues (as reported by the security dashboard). Collect site feedback regarding those issues.
- Enforcement of the TopBDII HA mechanism at local sites.
- 100% A/R in Dec 2011 for the TopBDII service (after the implementation of the TopBDII HA mechanism).
- No sites bellow the A/R threshold in Dec 2012
2.3. Issues and mitigation
Issue Description | Mitigation Description |
---|---|
|
Recomputation already processed and ticket is closed and verified. |
|
|
|
|
|
Supported as provided a workarund, and a new requirement has been set. |