Difference between revisions of "EGI-InSPIRE:Ibergrid-QR7"
Jump to navigation
Jump to search
m (moved Ibergrid-QR7 to EGI-InSPIRE:Ibergrid-QR7) |
|||
(20 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
{{Template:EGI-Inspire menubar}} | |||
{{Template:Inspire_reports_menubar}} | |||
{{TOC_right}} | |||
{| border="1" cellspacing="0" cellpadding="2" | {| border="1" cellspacing="0" cellpadding="2" | ||
|- | |- | ||
Line 67: | Line 70: | ||
| 1 | | 1 | ||
| | | | ||
* | * IFAE: Annual conference of the National Centre of Particle, Astroparticle and Nuclear Physics. Attending the spanish participation in the LHC sessions, in representation of the Tier1. | ||
http://indico.ific.uv.es/indico/conferenceTimeTable.py?confId=433 | http://indico.ific.uv.es/indico/conferenceTimeTable.py?confId=433 | ||
|- | |- | ||
Line 75: | Line 78: | ||
| 3 | | 3 | ||
| | | | ||
* | * IFAE: Annual conference organised by the spanish NREN Rediris. PIC made presentations in the Cloud and Network tracks: | ||
** P. Tallada, “Public cloud infrastructure at PIC”, http://wiki.rediris.es/megha/upload/PIC_Megha_GGTT.pdf | ** P. Tallada, “Public cloud infrastructure at PIC”, http://wiki.rediris.es/megha/upload/PIC_Megha_GGTT.pdf | ||
** G. Bernabeu, “Deployment of the LHCONE network on Rediris-Nova”, “http://www.rediris.es/jt/jt2011/ponencias/jt/jt2011-jt-opt_redirisnova-a2b1.pdf | ** G. Bernabeu, “Deployment of the LHCONE network on Rediris-Nova”, “http://www.rediris.es/jt/jt2011/ponencias/jt/jt2011-jt-opt_redirisnova-a2b1.pdf | ||
Line 85: | Line 88: | ||
| | | | ||
* Attendance from various institutes since some issues related to operations were discussed. | * Attendance from various institutes since some issues related to operations were discussed. | ||
* | * IFAE, IFCA: Participation in a panel discussion about cloud computing. http://indico.ifca.es/indico/conferenceDisplay.py?confId=399 | ||
|- | |||
| 23rd Jan 2012 | |||
| Amesterdam, Netherlands | |||
| WLCG TEG - Operations | |||
| 2 | |||
| | |||
* LIP: attendance and participation in the discussion panels for WLCG recommendations. http://indico.cern.ch/conferenceDisplay.py?confId=161833 | |||
|- | |||
| 24th-25th Jan 2012 | |||
| Amesterdam, Netherlands | |||
| WLCG TEG - Storage Management & Data Management | |||
| 2 | |||
| | |||
* LIP: attendance and participation in the discussion panels for WLCG recommendations. https://indico.cern.ch/conferenceDisplay.py?confId=165687 | |||
|- | |||
| 26th Jan 2012 | |||
| Amesterdam, Netherlands | |||
| WLCG TEG - Security | |||
| ~ 2 | |||
| | |||
* LIP: attendance and participation in the discussion panels for WLCG recommendations. http://indico.cern.ch/conferenceDisplay.py?confId=172023 | |||
|- | |- | ||
| 30-31 Jan 2012 | | 30-31 Jan 2012 | ||
Line 92: | Line 117: | ||
| 1 | | 1 | ||
| | | | ||
* | * IFAE: Participation of PIC Tier1 in the technical groups for operation, planning and deployment of network resources dedicated to the LHC. https://indico.cern.ch/conferenceDisplay.py?confId=160533 | ||
|- | |- | ||
|} | |} | ||
Line 110: | Line 135: | ||
|- | |- | ||
|} | |} | ||
<br/> | |||
== 2. ACTIVITY REPORT == | == 2. ACTIVITY REPORT == | ||
Line 115: | Line 141: | ||
===2.1. Progress Summary=== | ===2.1. Progress Summary=== | ||
* Introduction of a montly review / discussion regarding open security issues (as reported by the security dashboard). Collect site feedback regarding those issues. | |||
* Discussion of the monthly performance for IBERGRID sites and IBERGRID core services. | |||
* Deployment and operation of a TopBDII HA mechanism. Enforcement of the TopBDII HA mechanism at local sites. | |||
* Glue 2.0 enforcement. All sites were checked regarding the GLUE 2.0 information publishing at the site bdii level. 10 GGUS ticket were open and currently 5 remain to be solved. | |||
* Review and discuss the changes in GOCDB for the registration of NGI services in order to produce NGI Availability/Reliability statistics | |||
* Review and discuss GOCDB roles restructuring proposal | |||
* Review the resource Centre Decommissioning Procedure | |||
* Collect and submit requirements to EMI 3.0 | |||
* Complete the EGI Global Services survey and NGI International Services survey | |||
* Broadcast SA1 directives and surveys aimed for sites (SLURM support for CREAM) | |||
* Report on OMB meetings and receive feedback. | |||
<br /> | |||
===2.2. Main Achievements=== | ===2.2. Main Achievements=== | ||
* Introduction of a montly review / discussion regarding open security issues (as reported by the security dashboard). Collect site feedback regarding those issues. | |||
* Enforcement of the TopBDII HA mechanism at local sites. | |||
* 100% A/R in Dec 2011 for the TopBDII service (after the implementation of the TopBDII HA mechanism). | |||
* No sites bellow the A/R threshold in Dec 2012 | |||
<br /> | |||
===2.3. Issues and mitigation=== | ===2.3. Issues and mitigation=== | ||
Line 125: | Line 169: | ||
!scope="col"| Mitigation Description | !scope="col"| Mitigation Description | ||
|- | |- | ||
| | |||
* Failure in the infrastructure in which the Ibergrid Regional Nagios machine is being executed on. Unscheduled downtime: start time: 12/21/2011 13:00 PM CET; end time: 12/22/2011 16:00 PM CET. GGUS ticket asking for recomputation of A/R for Ibergrid sites: https://ggus.eu/ws/ticket_info.php?ticket=77695. | |||
| Recomputation already processed and ticket is closed and verified. | |||
|- | |||
| | |||
* Failure in the TopBDII HA mechanism between implemented between LIP and CESGA: start time: 01/19/2012 22:00 PM CET; end time: 01/20/2012 10:00 AM CET. GGUS ticket asking for recomputation of A/R for Ibergrid sites: https://ggus.eu/ws/ticket_info.php?ticket=78443 | |||
| | |||
|- | |||
| | |||
* Discussion about ROD metrics and ROD metrics recomputation with COD via https://ggus.eu/ws/ticket_info.php?ticket=78285 | |||
| | |||
|- | |||
| | |||
* VOMS membership expiration problem reported in https://ggus.eu/tech/ticket_show.php?ticket=78178 | |||
| Supported as provided a workarund, and a new requirement has been set. | |||
|} | |} | ||
Latest revision as of 18:46, 22 January 2015
EGI Inspire Main page |
Inspire reports menu: | Home • | SA1 weekly Reports • | SA1 Task QR Reports • | NGI QR Reports • | NGI QR User support Reports |
Quarterly Report Number | NGI Name | Partner Name | Author |
---|---|---|---|
QR7 | NGI_IBERGRID | LIP & CSIC | Goncalo Borges (LIP) |
1. MEETINGS AND DISSEMINATION
1.1. CONFERENCES/WORKSHOPS ORGANISED
Date | Location | Title | Participants | Outcome (Short report & Indico URL) |
---|---|---|---|---|
13th-14th December 2012 | LIP, Lisbon, Portugal | 1st Ibergrid Cloud Meeting | ~ 15 |
|
19th-20th Jan 2012 | CIEMAT, Madrid, Spain | Spanish NGI users conference | ~ 50 |
|
1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED
Date | Location | Title | Participants | Outcome (Short report & Indico URL) |
---|---|---|---|---|
2-4 Nov 2011 | Barcelona, Spain | III CPAN days | 1 |
http://indico.ific.uv.es/indico/conferenceTimeTable.py?confId=433 |
20 Nov - 01 Dec 2011 | Valladolid, Spain | Rediris Techical days | 3 |
|
19th-20th Jan 2012 | Madrid, Spain | Spanish NGI users conference | ~ 50 |
|
23rd Jan 2012 | Amesterdam, Netherlands | WLCG TEG - Operations | 2 |
|
24th-25th Jan 2012 | Amesterdam, Netherlands | WLCG TEG - Storage Management & Data Management | 2 |
|
26th Jan 2012 | Amesterdam, Netherlands | WLCG TEG - Security | ~ 2 |
|
30-31 Jan 2012 | LBL Berkeley, USA | LHCOPN and LHCONE joint meeting | 1 |
|
1.3. PUBLICATIONS
Publication title | Journal / Proceedings title | Journal references Volume number Issue Pages from - to |
Authors 1. 2. 3. Et al? |
---|
2. ACTIVITY REPORT
2.1. Progress Summary
- Introduction of a montly review / discussion regarding open security issues (as reported by the security dashboard). Collect site feedback regarding those issues.
- Discussion of the monthly performance for IBERGRID sites and IBERGRID core services.
- Deployment and operation of a TopBDII HA mechanism. Enforcement of the TopBDII HA mechanism at local sites.
- Glue 2.0 enforcement. All sites were checked regarding the GLUE 2.0 information publishing at the site bdii level. 10 GGUS ticket were open and currently 5 remain to be solved.
- Review and discuss the changes in GOCDB for the registration of NGI services in order to produce NGI Availability/Reliability statistics
- Review and discuss GOCDB roles restructuring proposal
- Review the resource Centre Decommissioning Procedure
- Collect and submit requirements to EMI 3.0
- Complete the EGI Global Services survey and NGI International Services survey
- Broadcast SA1 directives and surveys aimed for sites (SLURM support for CREAM)
- Report on OMB meetings and receive feedback.
2.2. Main Achievements
- Introduction of a montly review / discussion regarding open security issues (as reported by the security dashboard). Collect site feedback regarding those issues.
- Enforcement of the TopBDII HA mechanism at local sites.
- 100% A/R in Dec 2011 for the TopBDII service (after the implementation of the TopBDII HA mechanism).
- No sites bellow the A/R threshold in Dec 2012
2.3. Issues and mitigation
Issue Description | Mitigation Description |
---|---|
|
Recomputation already processed and ticket is closed and verified. |
|
|
|
|
|
Supported as provided a workarund, and a new requirement has been set. |