Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "EGI-InSPIRE:Ibergrid-QR7"

From EGIWiki
Jump to navigation Jump to search
 
(29 intermediate revisions by 2 users not shown)
Line 1: Line 1:
__NOTOC__
{{Template:EGI-Inspire menubar}}
 
{{Template:Inspire_reports_menubar}}
{{TOC_right}}
{| border="1" cellspacing="0" cellpadding="2"
{| border="1" cellspacing="0" cellpadding="2"
|-
|-
Line 37: Line 40:
|-
|-
|13th-14th December 2012
|13th-14th December 2012
|Lisbon, Portugal
|LIP, Lisbon, Portugal
|LIP
| 1st Ibergrid Cloud Meeting
|~ 15
|~ 15
|  
|  
* 1st Ibergrid Cloud Meeting: http://ibergrid.lip.pt/OD/Others/1st%20Ibergrid%20Cloud%20Meeting
* http://ibergrid.lip.pt/OD/Others/1st%20Ibergrid%20Cloud%20Meeting
* Startup of the IberCloud initiative aiming to implement a cloud infrastructure in for Ibergrid Users
* Startup of the IberCloud initiative aiming to implement a cloud infrastructure in for Ibergrid Users
|-
|-
| 19th-20th Jan 2012
| 19th-20th Jan 2012
| Madrid, Spain
| CIEMAT, Madrid, Spain
| CIEMAT
| Spanish NGI users conference
| ~ 50
| ~ 50
|
|
* Spanish NGI users conference: http://indico.ifca.es/indico/conferenceDisplay.py?confId=399.  
* http://indico.ifca.es/indico/conferenceDisplay.py?confId=399.  
The topics covered in the workshop were: 1- Integration of applications in distributed infrastructures. This topic focuses on success stories from applications in distributed infrastructures and an analysis of tools for improving the efficient usage of infrastructures (e.g. Job management, scientific gateways, workflow enactment, etc.) both standard or developed by the teams that use them. 2- Presentation of the user Access portal and technologies (such as the access to Grid resources from the web interface) 3- Description of needs and evaluation of the current access mechanism. 4- Round table and debate: Do users need Cloud-like distributed computing models? The virtualization of services inside the resource centres is a very useful technique for system administrators. The purpose of this round table is to survey the opinions of users about the possibility of offering resources in the form of Infrastructures as a Services (such as Amazon EC2).
* The topics covered in the workshop were: 1- Integration of applications in distributed infrastructures. This topic focuses on success stories from applications in distributed infrastructures and an analysis of tools for improving the efficient usage of infrastructures (e.g. Job management, scientific gateways, workflow enactment, etc.) both standard or developed by the teams that use them. 2- Presentation of the user Access portal and technologies (such as the access to Grid resources from the web interface) 3- Description of needs and evaluation of the current access mechanism. 4- Round table and debate: Do users need Cloud-like distributed computing models? The virtualization of services inside the resource centres is a very useful technique for system administrators. The purpose of this round table is to survey the opinions of users about the possibility of offering resources in the form of Infrastructures as a Services (such as Amazon EC2).
|}
|}
<br />
<br />
Line 61: Line 64:
!scope="col"|Date||Location||Title||Participants||Outcome (Short report & Indico URL)  
!scope="col"|Date||Location||Title||Participants||Outcome (Short report & Indico URL)  
|-
|-
| 19th-20th Jan 2012
| Madrid, Spain
| Spanish NGI users conference
| 10
|
* http://indico.ifca.es/indico/conferenceDisplay.py?confId=399. The topics covered in the workshop were: 1- Integration of applications in distributed infrastructures. This topic focuses on success stories from applications in distributed infrastructures and an analysis of tools for improving the efficient usage of infrastructures (e.g. Job management, scientific gateways, workflow enactment, etc.) both standard or developed by the teams that use them. 2- Presentation of the user Access portal and technologies (such as the access to Grid resources from the web interface) 3- Description of needs and evaluation of the current access mechanism. 4- Round table and debate: Do users need Cloud-like distributed computing models? The virtualization of services inside the resource centres is a very useful technique for system administrators. The purpose of this round table is to survey the opinions of users about the possibility of offering resources in the form of Infrastructures as a Services (such as Amazon EC2).
* PIC: Participation in a panel discussion about cloud computing.
|-
|-
| 2-4 Nov 2011
| 2-4 Nov 2011
Line 74: Line 70:
| 1
| 1
|
|
* PIC: Annual conference of the National Centre of Particle, Astroparticle and Nuclear Physics. Attending the spanish participation in the LHC sessions, in representation of the Tier1.
* IFAE: Annual conference of the National Centre of Particle, Astroparticle and Nuclear Physics. Attending the spanish participation in the LHC sessions, in representation of the Tier1.
http://indico.ific.uv.es/indico/conferenceTimeTable.py?confId=433
http://indico.ific.uv.es/indico/conferenceTimeTable.py?confId=433
|-  
|-  
Line 82: Line 78:
| 3
| 3
|  
|  
* PIC: Annual conference organised by the spanish NREN Rediris. PIC made presentations in the Cloud and Network tracks: P. Tallada, “Public cloud infrastructure at PIC”, http://wiki.rediris.es/megha/upload/PIC_Megha_GGTT.pdf; G. Bernabeu, “Deployment of the LHCONE network on Rediris-Nova”, “http://www.rediris.es/jt/jt2011/ponencias/jt/jt2011-jt-opt_redirisnova-a2b1.pdf
* IFAE: Annual conference organised by the spanish NREN Rediris. PIC made presentations in the Cloud and Network tracks:  
** P. Tallada, “Public cloud infrastructure at PIC”, http://wiki.rediris.es/megha/upload/PIC_Megha_GGTT.pdf
** G. Bernabeu, “Deployment of the LHCONE network on Rediris-Nova”, “http://www.rediris.es/jt/jt2011/ponencias/jt/jt2011-jt-opt_redirisnova-a2b1.pdf
|-
| 19th-20th Jan 2012
| Madrid, Spain
| Spanish NGI users conference
| ~ 50
|
* Attendance from various institutes since some issues related to operations were discussed.
* IFAE, IFCA: Participation in a panel discussion about cloud computing. http://indico.ifca.es/indico/conferenceDisplay.py?confId=399
|-
| 23rd Jan 2012
| Amesterdam, Netherlands
| WLCG TEG - Operations
| 2
|
* LIP: attendance and participation in the discussion panels for WLCG recommendations. http://indico.cern.ch/conferenceDisplay.py?confId=161833
|-
| 24th-25th Jan 2012
| Amesterdam, Netherlands
| WLCG TEG - Storage Management & Data Management
| 2
|
* LIP: attendance and participation in the discussion panels for WLCG recommendations. https://indico.cern.ch/conferenceDisplay.py?confId=165687
|-
| 26th Jan 2012
| Amesterdam, Netherlands
| WLCG TEG - Security
| ~ 2
|
* LIP: attendance and participation in the discussion panels for WLCG recommendations. http://indico.cern.ch/conferenceDisplay.py?confId=172023
 
|-  
|-  
 
| 30-31 Jan 2012
19-20 Jan 2012
| LBL Berkeley, USA
Madrid, Spain
| LHCOPN and LHCONE joint meeting  
Spanish NGI users conference
| 1
G. Merino
|
http://indico.ifca.es/indico/conferenceTimeTable.py?confId=399
* IFAE: Participation of PIC Tier1 in the technical groups for operation, planning and deployment of network resources dedicated to the LHC. https://indico.cern.ch/conferenceDisplay.py?confId=160533
Participation in a panel discussion about cloud computing.
 
30-31 Jan 2012
LBL Berkeley, USA
LHCOPN and LHCONE joint meeting  
G. Bernabeu
https://indico.cern.ch/conferenceDisplay.py?confId=160533
Participation of PIC Tier1 in the technical groups for operation, planning and deployment of network resources dedicated to the LHC.
 
 
 
 
 
 
 
|-
|-
|}
|}
Line 122: Line 135:
|-
|-
|}
|}
<br/>


== 2. ACTIVITY REPORT  ==
== 2. ACTIVITY REPORT  ==
Line 127: Line 141:


===2.1. Progress Summary===
===2.1. Progress Summary===
* Introduction of a montly review / discussion regarding open security issues (as reported by the security dashboard). Collect site feedback regarding those issues.
* Discussion of the monthly performance for IBERGRID sites and IBERGRID core services.
* Deployment and operation of a TopBDII HA mechanism. Enforcement of the TopBDII HA mechanism at local sites.
* Glue 2.0 enforcement. All sites were checked regarding the GLUE 2.0 information publishing at the site bdii level. 10 GGUS ticket were open and currently 5 remain to be solved.
* Review and discuss the changes in GOCDB for the registration of NGI services in order to produce NGI Availability/Reliability statistics
* Review and discuss GOCDB roles restructuring proposal
* Review the resource Centre Decommissioning Procedure
* Collect and submit requirements to EMI 3.0
* Complete the EGI Global Services survey and NGI International Services survey
* Broadcast SA1 directives and surveys aimed for sites (SLURM support for CREAM)
* Report on OMB meetings and receive feedback.
<br />
===2.2. Main Achievements===
===2.2. Main Achievements===


* Introduction of a montly review / discussion regarding open security issues (as reported by the security dashboard). Collect site feedback regarding those issues.
* Enforcement of the TopBDII HA mechanism at local sites.
* 100% A/R in Dec 2011 for the TopBDII service (after the implementation of the TopBDII HA mechanism).
* No sites bellow the A/R threshold in Dec 2012
<br />


===2.3. Issues and mitigation===
===2.3. Issues and mitigation===
Line 137: Line 169:
!scope="col"| Mitigation Description
!scope="col"| Mitigation Description
|-
|-
|
* Failure in the infrastructure in which the Ibergrid Regional Nagios machine is being executed on. Unscheduled downtime: start time: 12/21/2011 13:00 PM CET; end time: 12/22/2011 16:00 PM CET. GGUS ticket asking for recomputation of A/R for Ibergrid sites: https://ggus.eu/ws/ticket_info.php?ticket=77695.
| Recomputation already processed and ticket is closed and verified.
|-
|
* Failure in the TopBDII HA mechanism between implemented between LIP and CESGA: start time: 01/19/2012 22:00 PM CET; end time: 01/20/2012 10:00 AM CET. GGUS ticket asking for recomputation of A/R for Ibergrid sites: https://ggus.eu/ws/ticket_info.php?ticket=78443
|
|-
|
* Discussion about ROD metrics and ROD metrics recomputation with COD via https://ggus.eu/ws/ticket_info.php?ticket=78285
|
|-
|
* VOMS membership expiration problem reported in https://ggus.eu/tech/ticket_show.php?ticket=78178
| Supported as provided a workarund, and a new requirement has been set.
|}
|}



Latest revision as of 18:46, 22 January 2015

EGI Inspire Main page


Inspire reports menu: Home SA1 weekly Reports SA1 Task QR Reports NGI QR Reports NGI QR User support Reports



Quarterly Report Number NGI Name Partner Name Author
QR7 NGI_IBERGRID LIP & CSIC Goncalo Borges (LIP)


1. MEETINGS AND DISSEMINATION

1.1. CONFERENCES/WORKSHOPS ORGANISED

Date Location Title Participants Outcome (Short report & Indico URL)
13th-14th December 2012 LIP, Lisbon, Portugal 1st Ibergrid Cloud Meeting ~ 15
19th-20th Jan 2012 CIEMAT, Madrid, Spain Spanish NGI users conference ~ 50
  • http://indico.ifca.es/indico/conferenceDisplay.py?confId=399.
  • The topics covered in the workshop were: 1- Integration of applications in distributed infrastructures. This topic focuses on success stories from applications in distributed infrastructures and an analysis of tools for improving the efficient usage of infrastructures (e.g. Job management, scientific gateways, workflow enactment, etc.) both standard or developed by the teams that use them. 2- Presentation of the user Access portal and technologies (such as the access to Grid resources from the web interface) 3- Description of needs and evaluation of the current access mechanism. 4- Round table and debate: Do users need Cloud-like distributed computing models? The virtualization of services inside the resource centres is a very useful technique for system administrators. The purpose of this round table is to survey the opinions of users about the possibility of offering resources in the form of Infrastructures as a Services (such as Amazon EC2).


1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED

Date Location Title Participants Outcome (Short report & Indico URL)
2-4 Nov 2011 Barcelona, Spain III CPAN days 1
  • IFAE: Annual conference of the National Centre of Particle, Astroparticle and Nuclear Physics. Attending the spanish participation in the LHC sessions, in representation of the Tier1.

http://indico.ific.uv.es/indico/conferenceTimeTable.py?confId=433

20 Nov - 01 Dec 2011 Valladolid, Spain Rediris Techical days 3
19th-20th Jan 2012 Madrid, Spain Spanish NGI users conference ~ 50
23rd Jan 2012 Amesterdam, Netherlands WLCG TEG - Operations 2
24th-25th Jan 2012 Amesterdam, Netherlands WLCG TEG - Storage Management & Data Management 2
26th Jan 2012 Amesterdam, Netherlands WLCG TEG - Security ~ 2
30-31 Jan 2012 LBL Berkeley, USA LHCOPN and LHCONE joint meeting 1


1.3. PUBLICATIONS

Publication title Journal / Proceedings title Journal references
Volume number
Issue

Pages from - to
Authors
1.
2.
3.
Et al?


2. ACTIVITY REPORT

2.1. Progress Summary

  • Introduction of a montly review / discussion regarding open security issues (as reported by the security dashboard). Collect site feedback regarding those issues.
  • Discussion of the monthly performance for IBERGRID sites and IBERGRID core services.
  • Deployment and operation of a TopBDII HA mechanism. Enforcement of the TopBDII HA mechanism at local sites.
  • Glue 2.0 enforcement. All sites were checked regarding the GLUE 2.0 information publishing at the site bdii level. 10 GGUS ticket were open and currently 5 remain to be solved.
  • Review and discuss the changes in GOCDB for the registration of NGI services in order to produce NGI Availability/Reliability statistics
  • Review and discuss GOCDB roles restructuring proposal
  • Review the resource Centre Decommissioning Procedure
  • Collect and submit requirements to EMI 3.0
  • Complete the EGI Global Services survey and NGI International Services survey
  • Broadcast SA1 directives and surveys aimed for sites (SLURM support for CREAM)
  • Report on OMB meetings and receive feedback.


2.2. Main Achievements

  • Introduction of a montly review / discussion regarding open security issues (as reported by the security dashboard). Collect site feedback regarding those issues.
  • Enforcement of the TopBDII HA mechanism at local sites.
  • 100% A/R in Dec 2011 for the TopBDII service (after the implementation of the TopBDII HA mechanism).
  • No sites bellow the A/R threshold in Dec 2012


2.3. Issues and mitigation

Issue Description Mitigation Description
  • Failure in the infrastructure in which the Ibergrid Regional Nagios machine is being executed on. Unscheduled downtime: start time: 12/21/2011 13:00 PM CET; end time: 12/22/2011 16:00 PM CET. GGUS ticket asking for recomputation of A/R for Ibergrid sites: https://ggus.eu/ws/ticket_info.php?ticket=77695.
Recomputation already processed and ticket is closed and verified.
  • Failure in the TopBDII HA mechanism between implemented between LIP and CESGA: start time: 01/19/2012 22:00 PM CET; end time: 01/20/2012 10:00 AM CET. GGUS ticket asking for recomputation of A/R for Ibergrid sites: https://ggus.eu/ws/ticket_info.php?ticket=78443
Supported as provided a workarund, and a new requirement has been set.