Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "EGI-InSPIRE:Ibergrid-QR14"

From EGIWiki
Jump to navigation Jump to search
(Created page with "{{Template:Op menubar}} {{Template:Inspire_reports_menubar}} {{TOC_right}} <br> {| class="wikitable" |- ! scope="col" | Quarterly Report Number ! scope="col" | NGI Name ! s...")
 
Line 10: Line 10:
! scope="col" | Author
! scope="col" | Author
|-
|-
| &lt;Number of Quarterly report&gt;
| QR14
| &lt;NGI Name&gt;
| NGI_IBERGRID
| &lt;NGI Country&gt;
| LIP & CSIC
| &lt;Name of person submitting the QR&gt;
| Esteban Freire (CESGA)
|}
|}


Line 34: Line 34:
! Outcome (Short report &amp; Indico URL)
! Outcome (Short report &amp; Indico URL)
|-
|-
| &lt;Date&gt;
|
| &lt;Location&gt;
|
| &lt;Title&gt;
|
| &lt;Participants&gt;
|
| &lt;Outcome&gt;
|
|-
| &lt;Date&gt;
| &lt;Location&gt;
| &lt;Title&gt;
| &lt;Participants&gt;
| &lt;Outcome&gt;
|-
| &lt;Date&gt;
| &lt;Location&gt;
| &lt;Title&gt;
| &lt;Participants&gt;
| Test <!-- formatting_test -->
|}
|}


Line 63: Line 51:
! Outcome (Short report &amp; Indico URL)
! Outcome (Short report &amp; Indico URL)
|-
|-
| &lt;Date&gt;
| 08/05/2013
| &lt;Location&gt;
| CERN, Geneva
| Title
| CMS Disk/Tape separation Workshop
| Participants
| A. Pérez-Calero
| Outcome
| dCache sites – PIC case (https://indico.cern.ch/conferenceDisplay.py?confId=249032)
|-
|-
| &lt;Date&gt;
| 13/05/2013
| &lt;Location&gt;
| Barcelona, Spain
| Title
| LHCP Conference
| Participants
| A. Pérez-Calero, J. Flix
| Outcome
| The LHC Tier1 at PIC: experience from first LHC run (http://lhcp2013.ifae.es/)
|-
|-
| &lt;Date&gt;
| 26/06/2013
| &lt;Location&gt;
| Lisbon, Portugal
| Title
| FET- Flagship HBP: Workshop on Human Brain Project: A roadmap for Portugal
| Participants
| J. Pina
| Outcome Test <!-- formatting text -->
| http://www.gppq.fct.pt/_7pq/eventos.php?id=987
|}
|}


Line 86: Line 74:
|<Date>||<Location>||Title||Participants||Outcome  
|<Date>||<Location>||Title||Participants||Outcome  
|-
|-
-->  
-->


===1.3. PUBLICATIONS=== <!--List all publications as bullet points, detailing: Publication title, author(s), journal title, number/issue, date. Also mention any articles published further to interviews given by members of your activity.-->  
===1.3. PUBLICATIONS=== <!--List all publications as bullet points, detailing: Publication title, author(s), journal title, number/issue, date. Also mention any articles published further to interviews given by members of your activity.-->  
Line 97: Line 85:
! align="left" | Authors ''<br>1.<br>2.<br>3.<br>Et al?''
! align="left" | Authors ''<br>1.<br>2.<br>3.<br>Et al?''
|-
|-
| &lt;Publication title&gt;
|
| &lt;Journal/Proceedings&gt;
|
| Vol:&lt;volume number&gt;<br>Issue:&lt;Issue&gt;<br>Pg: &lt;from&gt; - &lt;to&gt;
|
| 1.&lt;Author 1&gt;<br>2.&lt;Author2&gt;<br>3. &lt;Author3&gt;<br>
|
|-
|
| &lt;Publication title&gt;
| &lt;Journal/Proceedings&gt;
| Vol:&lt;volume number&gt;<br>Issue:&lt;Issue&gt;<br>Pg: &lt;from&gt; - &lt;to&gt;
| 1.&lt;Author 1&gt;<br>2.&lt;Author2&gt;<br>3. &lt;Author3&gt;<br>
|-
| &lt;Publication title&gt;
| &lt;Journal/Proceedings&gt;
| Vol:&lt;volume number&gt;<br>Issue:&lt;Issue&gt;<br>Pg: &lt;from&gt; - &lt;to&gt;
| 1.&lt;Author 1&gt;<br>2.&lt;Author2&gt;<br>3. &lt;Author3&gt;<br>
|}
|}


Line 116: Line 95:


===2.1. Progress Summary=== <!-- Provide your test below -->  
===2.1. Progress Summary=== <!-- Provide your test below -->  
* Participation in the task force on availability/reliability computation
* Participation in the biweekly operation meetings
* Provide feedback on the survey focused on NGI services provisioning and usage
* Follow up and support of the SHA-2 compliant infrastructure campaign.
* Follow up and support of GOCDB MPI registration campaign
* Review of the "Compromised Certificates and Emergency suspension" Procedure
* Follow up with unresponsive VO managers regarding incomplete information (in the operations portal) for VOs in VOMS inside the iberian infrastructure
* Finalize decommission of two sites: SGAI-CSIC and IAA-CSIC
* Evaluation of operation core activities biding process
* Follow up with regional sites regarding
# EGI ADVISORY [EGI-ADV-20130514]
# EGI SVG ADVISORY [EGI-SVG-2013-5268]
# EGI SVG ADVISORY [EGI-SVG-2013-5331]


===2.2. Main Achievements=== <!--
===2.2. Main Achievements===  
Provide your text below
* Implementation of backup SAM nagios @ LIP
-->
* Push for the extension of CVMFS client configuration to support phys.vo.ibergrid.eu. CVMFS for phys.vo.ibergrid.eu is already available at almost all WLCG sites
* Provisioning of resources for the Distributed Research Infrastructure for Hydro-Meteorology Study (DRIHM) project at some of the Iberian sites
* 100% availability/reliability for the topbdii.core.ibergrid.eu service during QR13
* Sustainable integrated A/R for ibergrid sites during QR13
# May (98%/98% A/R)
# June (98%/98% A/R)
# July (96%/97% A/R)


=== 2.3. Issues and mitigation  ===
=== 2.3. Issues and mitigation  ===
Line 128: Line 126:
! scope="col" | Mitigation Description
! scope="col" | Mitigation Description
|-
|-
| Issue description
| SAM tests seems to be failing for a couple of hours during the first hours of the 1st of each month
| Issue mitigation
| Investigation of the issue was inconclusive. For the transition July --> August we have switch to the backup nagios at LIP to understand if the failure is related to the site (main instance is deployed at CESGA) or to the service itself.
|-
| Failover between backup SAM instance and main SAM instance is manual
| We are investigating in some mechanism to trigger the failover automatically
|}
|}


<!--
Please, fill the table below. You can add a line copyng the two lines
|-
| Issue Description || Issue mitigation
-->


[[Category:NGI_QR_Reports]]
[[Category:NGI_QR_Reports]]

Revision as of 15:44, 30 October 2013

Main EGI.eu operations services Support Documentation Tools Activities Performance Technology Catch-all Services Resource Allocation Security


Inspire reports menu: Home SA1 weekly Reports SA1 Task QR Reports NGI QR Reports NGI QR User support Reports




Quarterly Report Number NGI Name Partner Name Author
QR14 NGI_IBERGRID LIP & CSIC Esteban Freire (CESGA)


1. MEETINGS AND DISSEMINATION

Note: Complete the tables below by adding as many rows as needed.

1.1. CONFERENCES/WORKSHOPS ORGANISED

Date Location Title Participants Outcome (Short report & Indico URL)

1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED

Date Location Title Participants Outcome (Short report & Indico URL)
08/05/2013 CERN, Geneva CMS Disk/Tape separation Workshop A. Pérez-Calero dCache sites – PIC case (https://indico.cern.ch/conferenceDisplay.py?confId=249032)
13/05/2013 Barcelona, Spain LHCP Conference A. Pérez-Calero, J. Flix The LHC Tier1 at PIC: experience from first LHC run (http://lhcp2013.ifae.es/)
26/06/2013 Lisbon, Portugal FET- Flagship HBP: Workshop on Human Brain Project: A roadmap for Portugal J. Pina http://www.gppq.fct.pt/_7pq/eventos.php?id=987


1.3. PUBLICATIONS

Publication title Journal / Proceedings title Journal references
Volume number
Issue

Pages from - to
Authors
1.
2.
3.
Et al?

2. ACTIVITY REPORT

2.1. Progress Summary

  • Participation in the task force on availability/reliability computation
  • Participation in the biweekly operation meetings
  • Provide feedback on the survey focused on NGI services provisioning and usage
  • Follow up and support of the SHA-2 compliant infrastructure campaign.
  • Follow up and support of GOCDB MPI registration campaign
  • Review of the "Compromised Certificates and Emergency suspension" Procedure
  • Follow up with unresponsive VO managers regarding incomplete information (in the operations portal) for VOs in VOMS inside the iberian infrastructure
  • Finalize decommission of two sites: SGAI-CSIC and IAA-CSIC
  • Evaluation of operation core activities biding process
  • Follow up with regional sites regarding
  1. EGI ADVISORY [EGI-ADV-20130514]
  2. EGI SVG ADVISORY [EGI-SVG-2013-5268]
  3. EGI SVG ADVISORY [EGI-SVG-2013-5331]

2.2. Main Achievements

  • Implementation of backup SAM nagios @ LIP
  • Push for the extension of CVMFS client configuration to support phys.vo.ibergrid.eu. CVMFS for phys.vo.ibergrid.eu is already available at almost all WLCG sites
  • Provisioning of resources for the Distributed Research Infrastructure for Hydro-Meteorology Study (DRIHM) project at some of the Iberian sites
  • 100% availability/reliability for the topbdii.core.ibergrid.eu service during QR13
  • Sustainable integrated A/R for ibergrid sites during QR13
  1. May (98%/98% A/R)
  2. June (98%/98% A/R)
  3. July (96%/97% A/R)

2.3. Issues and mitigation

Issue Description Mitigation Description
SAM tests seems to be failing for a couple of hours during the first hours of the 1st of each month Investigation of the issue was inconclusive. For the transition July --> August we have switch to the backup nagios at LIP to understand if the failure is related to the site (main instance is deployed at CESGA) or to the service itself.
Failover between backup SAM instance and main SAM instance is manual We are investigating in some mechanism to trigger the failover automatically