Difference between revisions of "EGI-InSPIRE:Finland-QR3"
(18 intermediate revisions by 3 users not shown) | |||
Line 1: | Line 1: | ||
{{Template:EGI-Inspire menubar}} | |||
{{Template:Inspire_reports_menubar}} | |||
{{TOC_right}} | |||
{| border="1" cellspacing="0" cellpadding="2" | {| border="1" cellspacing="0" cellpadding="2" | ||
Line 8: | Line 12: | ||
!scope="col"| Author | !scope="col"| Author | ||
|- | |- | ||
| | |3 | ||
| | |NGI_FI | ||
| | |Finland | ||
| | |Pekka Lehtovuori | ||
|- | |- | ||
|} | |} | ||
Line 20: | Line 24: | ||
==1. MEETINGS AND DISSEMINATION == | ==1. MEETINGS AND DISSEMINATION == | ||
<!-- | |||
=====GENERAL GUIDELINES FOR ALL EVENTS REPORTED IN THE FOLLOWING SECTIONS:===== | =====GENERAL GUIDELINES FOR ALL EVENTS REPORTED IN THE FOLLOWING SECTIONS:===== | ||
*please do not provide a list of participants, only give the number of people that attended | *please do not provide a list of participants, only give the number of people that attended | ||
Line 27: | Line 32: | ||
**If your presentation is not available online, please send the slides to erika.swiderski@egi.eu. | **If your presentation is not available online, please send the slides to erika.swiderski@egi.eu. | ||
Note: Complete the tables below by adding as many rows as needed. | Note: Complete the tables below by adding as many rows as needed. | ||
Note: Complete the tables below by adding as many rows as needed. | Note: Complete the tables below by adding as many rows as needed. --> | ||
===1.1. CONFERENCES/WORKSHOPS ORGANISED=== | ===1.1. CONFERENCES/WORKSHOPS ORGANISED=== | ||
Line 40: | Line 45: | ||
|- | |- | ||
|19.01.2011||Espoo, Finland||FGI kick-off||24||Kick off meeting for the procurement process for Finnish 2M€ grid resource investment. Purchased hardware will be installed in 9 sites and connected to EGI|| | |19.01.2011||Espoo, Finland||FGI kick-off||24||Kick off meeting for the procurement process for Finnish 2M€ grid resource investment. Purchased hardware will be installed in 9 sites and connected to EGI|| | ||
<!-- formatting_test --> | <!-- formatting_test --> | ||
|- | |- | ||
Line 53: | Line 56: | ||
!scope="col"|Date||Location||Title||Participants||Outcome (Short report & Indico URL) | !scope="col"|Date||Location||Title||Participants||Outcome (Short report & Indico URL) | ||
|- | |- | ||
| | |19.1.2011||Amsterdam||SA1 Roadmap discussion||1||Outcome | ||
|- | |||
|21.1.2011||Amsterdam||Information systems and ARC integration||1||Meeting with Tiziana on title topic | |||
|- | |- | ||
| | |24.-25.1.2011||Amsterdam||OMB F2F||2||https://www.egi.eu/indico/conferenceDisplay.py?confId=153 | ||
|- | |||
|25.1.2011||Amsterdam||OTAG||2||https://www.egi.eu/indico/conferenceDisplay.py?confId=245 | |||
|- | |- | ||
| | |26.1.2011||Amsterdam||F2F with COD||1|| | ||
<!-- formatting text --> | <!-- formatting text --> | ||
|- | |- | ||
Line 74: | Line 81: | ||
|- | |- | ||
!scope="col"|Publication title||Journal / Proceedings title||align="left" |Journal references<br> ''Volume number<br> Issue<br><br>Pages from - to''||align="left" |Authors ''<br>1.<br>2.<br>3.<br>Et al?'' | !scope="col"|Publication title||Journal / Proceedings title||align="left" |Journal references<br> ''Volume number<br> Issue<br><br>Pages from - to''||align="left" |Authors ''<br>1.<br>2.<br>3.<br>Et al?'' | ||
|} | |} | ||
Line 87: | Line 89: | ||
===2.1. Progress Summary=== | ===2.1. Progress Summary=== | ||
<!-- Provide your test below --> | <!-- Provide your test below --> | ||
Finnish national grid infrastructure has worked nicely. 3.1.2011 Academy of Finland granted 2 M€ for the new hardware investments for national grid infrastructure (NGI_FI or FGI). Purchased hardware will be located in 9 sites will be connected to EGI late 2011 / early 2012. | |||
The only gLite resource in Finland (64 cores for ESRVO) was decommissioned in the end of November 2011 when NGI_FI decided to provide all EGI resources through ARC middleware in order to reduce maintenance work required for two middleware stacks. | |||
Setting up the NGI_FI continued slower than anticipated, but there were some progress however. | |||
===2.2. Main Achievements=== | ===2.2. Main Achievements=== | ||
Line 92: | Line 99: | ||
Provide your text below | Provide your text below | ||
--> | --> | ||
Major update of SGAS accounting system. | |||
Setup of Nagios monitoring. | |||
===2.3. Issues and mitigation=== | ===2.3. Issues and mitigation=== | ||
Line 99: | Line 109: | ||
!scope="col"| Issue Description | !scope="col"| Issue Description | ||
!scope="col"| Mitigation Description | !scope="col"| Mitigation Description | ||
|- | |- | ||
|} | |} | ||
Interoperability between the ARC middleware and the operational and monitoring tools remains the main issue. | |||
When gLite resources were decommissioned in the end of November everything did not go as nicely as planned because in the monitoring of the systems continued for whole December. This caused 0% availability figures for the resource. | |||
<!-- | <!-- |
Latest revision as of 17:37, 6 January 2015
EGI Inspire Main page |
Inspire reports menu: | Home • | SA1 weekly Reports • | SA1 Task QR Reports • | NGI QR Reports • | NGI QR User support Reports |
Quarterly Report Number | NGI Name | Partner Name | Author |
---|---|---|---|
3 | NGI_FI | Finland | Pekka Lehtovuori |
1. MEETINGS AND DISSEMINATION
1.1. CONFERENCES/WORKSHOPS ORGANISED
Date | Location | Title | Participants | Outcome (Short report & Indico URL) | |
---|---|---|---|---|---|
2.-3.12.2010 | Copenhagen | NDGF All Hands | 11 | ||
19.01.2011 | Espoo, Finland | FGI kick-off | 24 | Kick off meeting for the procurement process for Finnish 2M€ grid resource investment. Purchased hardware will be installed in 9 sites and connected to EGI |
1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED
Date | Location | Title | Participants | Outcome (Short report & Indico URL) |
---|---|---|---|---|
19.1.2011 | Amsterdam | SA1 Roadmap discussion | 1 | Outcome |
21.1.2011 | Amsterdam | Information systems and ARC integration | 1 | Meeting with Tiziana on title topic |
24.-25.1.2011 | Amsterdam | OMB F2F | 2 | https://www.egi.eu/indico/conferenceDisplay.py?confId=153 |
25.1.2011 | Amsterdam | OTAG | 2 | https://www.egi.eu/indico/conferenceDisplay.py?confId=245 |
26.1.2011 | Amsterdam | F2F with COD | 1 |
1.3. PUBLICATIONS
Publication title | Journal / Proceedings title | Journal references Volume number Issue Pages from - to |
Authors 1. 2. 3. Et al? |
---|
2. ACTIVITY REPORT
2.1. Progress Summary
Finnish national grid infrastructure has worked nicely. 3.1.2011 Academy of Finland granted 2 M€ for the new hardware investments for national grid infrastructure (NGI_FI or FGI). Purchased hardware will be located in 9 sites will be connected to EGI late 2011 / early 2012.
The only gLite resource in Finland (64 cores for ESRVO) was decommissioned in the end of November 2011 when NGI_FI decided to provide all EGI resources through ARC middleware in order to reduce maintenance work required for two middleware stacks.
Setting up the NGI_FI continued slower than anticipated, but there were some progress however.
2.2. Main Achievements
Major update of SGAS accounting system.
Setup of Nagios monitoring.
2.3. Issues and mitigation
Issue Description | Mitigation Description |
---|
Interoperability between the ARC middleware and the operational and monitoring tools remains the main issue.
When gLite resources were decommissioned in the end of November everything did not go as nicely as planned because in the monitoring of the systems continued for whole December. This caused 0% availability figures for the resource.