Difference between revisions of "Agenda-31-01-2011"
Jump to navigation
Jump to search
Line 19: | Line 19: | ||
* Gathering of requirements for EMI 2.0 - deadline is 10 February | * Gathering of requirements for EMI 2.0 - deadline is 10 February | ||
[https://wiki.egi.eu/wiki/Mw-requirements.html Middleware requirements] | |||
[Nagios requirement: [https://wiki.egi.eu/wiki/Nagios-requirements.html]] | [Nagios requirement: [https://wiki.egi.eu/wiki/Nagios-requirements.html]] |
Revision as of 00:57, 30 January 2011
Detailed agenda Grid Operations Meeting 31 January 2011
1 - Information, MW releases and Staged rollout (Mario)
1.1 - In staged rollout
- glite 3.1:
LFC no EA DPM 1 EA has found problems, a memory leak does anyone want to try it also
- glite 3.2:
VOMS 1 EA performing the test LFC Oracle 1 EA performing the test LFC mysql 1 EA performing the test L&B 1 EA performing the test
1.2 - Information
- Gathering of requirements for EMI 2.0 - deadline is 10 February
[Nagios requirement: [1]]
[SA1 Survey: [2]]
2 - Operational issues (all)
3 - Operational Tools (Emir)
4 - COD issues (Malgorzata, Luuk)
5 - AOB
Back GridOpsMeeting