Difference between revisions of "Agenda-31-01-2011"
Jump to navigation
Jump to search
Line 19: | Line 19: | ||
* Gathering of requirements for EMI 2.0 - deadline is 10 February | * Gathering of requirements for EMI 2.0 - deadline is 10 February | ||
[https://wiki.egi.eu/wiki/Mw-requirements.html Middleware requirements] | [https://wiki.egi.eu/wiki/Mw-requirements.html Middleware requirements] | ||
[https://wiki.egi.eu/wiki/Nagios-requirements.html Nagios requirement ] | [https://wiki.egi.eu/wiki/Nagios-requirements.html Nagios requirement] | ||
[https://wiki.egi.eu/wiki/EGI_Operations_Surveys SA1 Survey] | [https://wiki.egi.eu/wiki/EGI_Operations_Surveys SA1 Survey] | ||
* EMI 1.0: Major changes with respect to the current situation - I deeply advise that you all take a very close | |||
look at Alberto di Meglio's presentation in the last [https://www.egi.eu/indico/materialDisplay.py?contribId=36&sessionId=4&materialId=slides&confId=153 OMB] | |||
===2 - Operational issues (all)=== | ===2 - Operational issues (all)=== |
Revision as of 01:14, 30 January 2011
Detailed agenda Grid Operations Meeting 31 January 2011
1 - Information, MW releases and Staged rollout (Mario)
1.1 - In staged rollout
- glite 3.1:
LFC no EA DPM 1 EA has found problems, a memory leak does anyone want to try it also
- glite 3.2:
VOMS 1 EA performing the test LFC Oracle 1 EA performing the test LFC mysql 1 EA performing the test L&B 1 EA performing the test
1.2 - Information
- Gathering of requirements for EMI 2.0 - deadline is 10 February
Middleware requirements Nagios requirement SA1 Survey
- EMI 1.0: Major changes with respect to the current situation - I deeply advise that you all take a very close
look at Alberto di Meglio's presentation in the last OMB
2 - Operational issues (all)
3 - Operational Tools (Emir)
4 - COD issues (Malgorzata, Luuk)
5 - AOB
Back GridOpsMeeting