Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "Agenda-24-02-2014"

From EGIWiki
Jump to navigation Jump to search
Line 37: Line 37:
* Probes are ready and deployed in midmon, and Sites and ROD can check which are the services to upgrade by: '''xx-02-2014'''
* Probes are ready and deployed in midmon, and Sites and ROD can check which are the services to upgrade by: '''xx-02-2014'''
* More information [https://wiki.egi.eu/wiki/Software_Retirement_Calendar#EMI_2 software retirement calendar] wiki page
* More information [https://wiki.egi.eu/wiki/Software_Retirement_Calendar#EMI_2 software retirement calendar] wiki page
*Matt Doidge is working on the EMI-3 WN tarball. A first version is expected at the beginning of March. Sites interested in the tarball version of the WN are encouraged to contact João Pina, and support the WN staged rollout.


== 2.1 GLUE2 validation ==
== 2.1 GLUE2 validation ==

Revision as of 17:37, 23 February 2014

Audio conference link Conference system is Adobe Connect, no password required.
Audio conference details Indico page



1. Middleware releases and staged rollout

1.1 News from URT

1.2 UMD release

1.3 Staged rollout updates

1.4 Next releases

  • UMD-3 expected for the end of March

2. Operational issues

2.1 Report from DMSU

Nothing to report

2.1 EMI-2 decommision calendar

Reminder:

  • Sites will start to receive alarms on Monday March 3rd
  • Probes are ready and deployed in midmon, and Sites and ROD can check which are the services to upgrade by: xx-02-2014
  • More information software retirement calendar wiki page
  • Matt Doidge is working on the EMI-3 WN tarball. A first version is expected at the beginning of March. Sites interested in the tarball version of the WN are encouraged to contact João Pina, and support the WN staged rollout.

2.1 GLUE2 validation

The number of Site BDIIs failing GLUE Validator reduced to 73 instances, currently failing in midmon. This number is compliant with PRCEDURE06, which demands 75% of the sites OK before a probe turns into Operational. Possible timeline:

  • Broadcast to ROD and Sites on March 3rd
  • Probe will be set OPERATIONAL on March 10th
  • Sites will have other two weeks to fix the Site-BDII before receiving alarms

For any comment, question or suggestion, contact operations[at]egi.eu

3. AOB

3.1 Next meeting

4. Minutes