EGI-InSPIRE:SA1.5-QR5
EGI Inspire Main page |
Inspire reports menu: | Home • | SA1 weekly Reports • | SA1 Task QR Reports • | NGI QR Reports • | NGI QR User support Reports |
1. Task Meetings
There were no formal task meetings held this quarter. Many internal team meetings and one-to-ones with users, sites, and RIPs.
2. Main Achievements
Repository
Portal: No new releases of the accounting portal during this quarter. The service ran smoothly. The main operational problem was bad data from a site causing the UserDN data to be unavailable. https://ggus.eu/ws/ticket_info.php?ticket=71738
The new Accounting Portal Roadmap is available in https://documents.egi.eu/document/517
More VOs can be selected from the CUSTOM view.
3. Issues and Mitigation
Issue Description | Mitigation Description |
---|---|
Redevelopment of infrastructure taking longer than planned | Employing contractor to backfill other duties |
Large flow of jobs from sites catching up and republishing, sometime in error,overloaded the service, which resulted in lots of sites failing to publish for a few days.. |
Regular optimisation of the consumer database has greatly increased the capacity of the consumer. |
|
4. Plans for the next period
APEL=A, Portal=P
1. (A) New Central Infrastructure in Production at RAL.
2. (A) Central Server ready to receive records from new clients.
3. (A) All external services ready to start publishing by new method.
4. (A) Workshop at TF
5. (P) FQAN and foreign usage to be deployed (alreadey delivered for test.
6. (P) New ActiveMQ connector with repository to be implemented
<span style="font-size:11.0pt;font-family:"Calibri","sans-serif";mso-ascii-theme-font: minor-latin;mso-fareast-font-family:Calibri;mso-fareast-theme-font:minor-latin; mso-hansi-theme-font:minor-latin;mso-bidi-font-family:"Times New Roman"; mso-bidi-theme-font:minor-bidi;mso-ansi-language:EN-GB;mso-fareast-language: EN-US;mso-bidi-language:AR-SA" />