EGI-InSPIRE:Turkey-QR6
Jump to navigation
Jump to search
Main | EGI.eu operations services | Support | Documentation | Tools | Activities | Performance | Technology | Catch-all Services | Resource Allocation | Security |
Inspire reports menu: | Home • | SA1 weekly Reports • | SA1 Task QR Reports • | NGI QR Reports • | NGI QR User support Reports |
Quarterly Report Number | NGI Name | Partner Name | Author |
---|---|---|---|
QR6 | NGI_TR | TUBITAK ULAKBIM | Feyza Eryol |
1. MEETINGS AND DISSEMINATION
1.1. CONFERENCES/WORKSHOPS ORGANISED
Date | Location | Title | Participants | Outcome (Short report & Indico URL) |
---|---|---|---|---|
1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED
Date | Location | Title | Participants | Outcome (Short report & Indico URL) |
---|---|---|---|---|
12-14 September 2011 | TOBB ETU, Ankara, Turkey | Molecular Dynamics Workshop II | Feyza Eryol | Researcher who runs molecular dynamics simulations were the participants of the national workshop. We had a presentation which introduced the NGI_TR, EGI and related activities. |
19-23 September 2011 | Lyon, France | EGI Technical Forum 2011 | Onur Temizsoylu | https://www.egi.eu/indico/conferenceTimeTable.py?confId=452#20110919 |
1.3. PUBLICATIONS
Publication title | Journal / Proceedings title | Journal references Volume number Issue Pages from - to |
Authors 1. 2. 3. Et al? |
---|
2. ACTIVITY REPORT
2.1. Progress Summary
- TR-Grid CA is operated.
- The self-audit of TR-Grid CA is presented in the EUGridPMA meeting which is held on 12-14 September, 2011.
- Service certificates are updated for DPM-disk servers.
- Regular updates of middleware is followed up and implemented to NGI_TR sites.
- Security updates are followed up and implemented to sites.
- The patches had been applied for the torque security bug.
- Attendance to OMB meetings.
- Attendance to Grid Operation Meetings.
- CA packages had been updated.
- The Nagios box is operated, maintained and updated.
- Two additional top-BDII services is installed and regular updates have been done in the DNS for High Availability.
- The VOMS service is migrated to SL5 and gLite3.2.
- The reported problems for Turkish Tier-2 centers have been resolved
2.2. Main Achievements
After the f2f OMB meeting in Lyon, we installed 2 more top-BDII service and configure the DNS server with NSUpdate patch. Now, NGI_TR has 3 top-BDII services which is loadbalanced with DNS roundrobin method. Also, we had a monitoring script which checks the availability of the top-BDII's and send an update to the DNS server for HA.
2.3. Issues and mitigation
Issue Description | Mitigation Description |
---|---|
UMD top-BDII package configuration problems | We tried to install the two of the top-BDII service of UMD for the HA of the top-BDII service of NGI_TR. It was installed and configured easily with the ldap2.4 packages. But the slapd deamon is not running stable so we had installed gLite3.2 service nodes. We will try to install UMD top-BDI once more to be able to open a GGUS ticket UMD for top-BDII service. |