Difference between revisions of "EGI-InSPIRE:SA1.8-QR8"
Jump to navigation
Jump to search
(Created page with "__NOTOC__ = 1. Task Meetings = <!-- Notes. Report here all task-specific meetings held. This includes (a) face-to-face meetings and (b) phone meetings. Make sure that for all tas...") |
|||
(12 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
{{Template:EGI-Inspire menubar}} | |||
{{Template:Inspire_reports_menubar}} | |||
{{TOC_right}} | |||
= 1. Task Meetings = | = 1. Task Meetings = | ||
<!-- | <!-- | ||
Line 22: | Line 25: | ||
Note. This is a detailed account of progress over the previous quarter of activities within the task. | Note. This is a detailed account of progress over the previous quarter of activities within the task. | ||
--> | --> | ||
* Continue publishing of A/R league tables - OPS | |||
* Continue publishing of A/R reports for NGI Core services (top-BDII) | |||
* The RC OLA was updated to v1.1. [[Resource_Centre_OLA:_Release_Notes#Resource_Centre_OLA_v._1.1 | Changes ]] were approved at [https://www.egi.eu/indico/conferenceDisplay.py?confId=719 OMB (2012-02-28)] | |||
* The RP OLA was updated to v1.1. [[ Resource_infrastructure_Provider_OLA:_Release_Notes#Release_notes_v._1.1 | Changes ]] were approved at [https://www.egi.eu/indico/conferenceDisplay.py?confId=719 OMB (2012-02-28)] | |||
* A draft version of [https://documents.egi.eu/document/1093 EGI.eu OLA] has been published. | |||
* Assessment of the EGI.eu central tools service level targets.<br>The availability metrics for individual tool instances were extracted from the [https://ops-monitor.cern.ch/nagios/ Nagios] and [https://www.egi.eu/indico/getFile.py/access?contribId=7&resId=1&materialId=slides&confId=719 presented] at the [https://www.egi.eu/indico/conferenceDisplay.py?confId=719 OMB (2012-02-28)].<br>The OMB agreed to the [https://www.egi.eu/indico/getFile.py/access?contribId=7&resId=0&materialId=slides&confId=719 proposed] service level targets. | |||
* A draft version of [https://documents.egi.eu/document/1057 MS418] "Operational Level Agreements (OLAs) within the EGI production infrastructure" has been published. | |||
* Clarify the procedure for EGI sites/regions in the new SAM [https://tomtools.cern.ch/confluence/display/SAMDOC/Availability+Re-computation+Policy Availability Re-computation Policy]. | |||
* Starting from the February 2012 A/R reports, a parent GGUS ticket is created per month in order to gather all the re-computation requests. | |||
== EGI Catch-All Core Service == | == EGI Catch-All Core Service == | ||
* Operation of WMS, LB and Top-BDII for site certification | |||
* Operation of certification Catch-All portal | |||
=== dteam VO === | |||
* Operation of VOMS/VORMS for dteam VO. | |||
* New dteam/EGI group has been created. The dteam [http://operations-portal.egi.eu/vo/downloadAUP/file/dteam-AcceptableUsePolicy-20110926-1316993681969.txt Acceptable Use Policy] had to change slightly to allow this. | |||
* New dteam/NGI_UA (Ukraine) has been created. | |||
* Add the new "UK e-Science CA 2B" certificate to all the dteam VO members which had the old "UK e-Science CA" [https://ggus.eu/ws/ticket_info.php?ticket=78909]. | |||
= 3. Issues and Mitigation = | = 3. Issues and Mitigation = | ||
Line 41: | Line 76: | ||
<!-- provide your text below --> | <!-- provide your text below --> | ||
* The final version of EGI.eu OLA is expected in 2012Q3 | |||
* The milestone MS418 "Operational Level Agreements (OLAs) within the EGI production infrastructure" is expected in 2012Q2 | |||
* Continue the handling the validation and distribution of the monthly A/R reports and the maintenance of the relevant wiki page | |||
Latest revision as of 19:18, 6 January 2015
EGI Inspire Main page |
Inspire reports menu: | Home • | SA1 weekly Reports • | SA1 Task QR Reports • | NGI QR Reports • | NGI QR User support Reports |
1. Task Meetings
Date (dd/mm/yyyy) | Url Indico Agenda | Title | Outcome |
---|---|---|---|
2. Main Achievements
- Continue publishing of A/R league tables - OPS
- Continue publishing of A/R reports for NGI Core services (top-BDII)
- The RC OLA was updated to v1.1. Changes were approved at OMB (2012-02-28)
- The RP OLA was updated to v1.1. Changes were approved at OMB (2012-02-28)
- A draft version of EGI.eu OLA has been published.
- Assessment of the EGI.eu central tools service level targets.
The availability metrics for individual tool instances were extracted from the Nagios and presented at the OMB (2012-02-28).
The OMB agreed to the proposed service level targets.
- A draft version of MS418 "Operational Level Agreements (OLAs) within the EGI production infrastructure" has been published.
- Clarify the procedure for EGI sites/regions in the new SAM Availability Re-computation Policy.
- Starting from the February 2012 A/R reports, a parent GGUS ticket is created per month in order to gather all the re-computation requests.
EGI Catch-All Core Service
- Operation of WMS, LB and Top-BDII for site certification
- Operation of certification Catch-All portal
dteam VO
- Operation of VOMS/VORMS for dteam VO.
- New dteam/EGI group has been created. The dteam Acceptable Use Policy had to change slightly to allow this.
- New dteam/NGI_UA (Ukraine) has been created.
- Add the new "UK e-Science CA 2B" certificate to all the dteam VO members which had the old "UK e-Science CA" [1].
3. Issues and Mitigation
Issue Description | Mitigation Description |
---|---|
4. Plans for the next period
- The final version of EGI.eu OLA is expected in 2012Q3
- The milestone MS418 "Operational Level Agreements (OLAs) within the EGI production infrastructure" is expected in 2012Q2
- Continue the handling the validation and distribution of the monthly A/R reports and the maintenance of the relevant wiki page