Difference between revisions of "EGI-InSPIRE:Ireland-QR6"
Jump to navigation
Jump to search
m (moved Ireland-QR6 to EGI-InSPIRE:Ireland-QR6) |
|||
(6 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
{{Template:EGI-Inspire menubar}} | |||
{{Template:Inspire_reports_menubar}} | |||
{{TOC_right}} | |||
{| border="1" cellspacing="0" cellpadding="2" | {| border="1" cellspacing="0" cellpadding="2" | ||
|- | |- | ||
Line 78: | Line 81: | ||
===2.1. Progress Summary=== | ===2.1. Progress Summary=== | ||
* Installation of [https://guse.sztaki.hu WS-PGRADE] portal started. | |||
* Grid-Ireland CA | |||
** Renewed RA in UCC (Cork). Added RA in ICHEC (Galway). | |||
* Operational Security | |||
** On-going proactive kernel and errata updates on all NGI_IE sites. | |||
===2.2. Main Achievements=== | ===2.2. Main Achievements=== | ||
* Participated in EGI CSIRT, including monthly and weekly meetings, and as EGI CSIRT duty contact for week starting 2011-10-31. | * Participated in EGI CSIRT, including monthly and weekly meetings, and as EGI CSIRT duty contact for week starting 2011-10-31. | ||
* Joined [[Fedcloud-tf:FederatedCloudsTaskForce|EGI Federated Clouds Task Force]] as Resource Provider and participated in weekly meetings. Began process of making resources available via cloud interfaces. | * Joined [[Fedcloud-tf:FederatedCloudsTaskForce|EGI Federated Clouds Task Force]] as Resource Provider and participated in weekly meetings. Began process of making resources available via cloud interfaces, including successful conversion of WN to StratusLab cloud node, and operation of virtual WN within local cloud. | ||
* GPU cluster integration completed. | |||
===2.3. Issues and mitigation=== | ===2.3. Issues and mitigation=== | ||
Line 89: | Line 99: | ||
!scope="col"| Mitigation Description | !scope="col"| Mitigation Description | ||
|- | |- | ||
| Reliability problems with storage used for shared cluster homes, including disk failures and system freezes || Migrated cluster homes to alternative hardware | |||
|- | |||
| Scheduled cooling and networking shut down in UCC required unscheduled downtime. || Requested admins in UCC to give NGI_IE advance warning of their scheduled downtimes to permit scheduling in EGI. | |||
|- | |||
| Site deployment of cream-ce will be required for WLCG || Added deployment of CREAM-CE to to-do list. | |||
|- | |||
| 2011-10-27 Power and cooling failure in TCD required unscheduled downtime. || At time of writing, cooling and power are operational. Those responsible for cooling and power are investigating underlying cause of the problem. | |||
|} | |} | ||
Latest revision as of 18:45, 22 January 2015
EGI Inspire Main page |
Inspire reports menu: | Home • | SA1 weekly Reports • | SA1 Task QR Reports • | NGI QR Reports • | NGI QR User support Reports |
Quarterly Report Number | NGI Name | Partner Name | Author |
---|---|---|---|
6 | NGI_IE | TCD | David O'Callaghan |
1. MEETINGS AND DISSEMINATION
1.1. CONFERENCES/WORKSHOPS ORGANISED
Date | Location | Title | Participants | Outcome (Short report & Indico URL) |
---|---|---|---|---|
2011-09-20 to 2011-09-21 | Lyon, France | Virtualization and Cloud Computing track at EGI Technical Forum 2011 | ~50 | https://www.egi.eu/indico/sessionDisplay.py?sessionId=7&confId=452#20110920 |
1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED
Date | Location | Title | Participants | Outcome (Short report & Indico URL) |
---|---|---|---|---|
2011-09-08 to 2011-09-09 | Dublin, Ireland | TERENA TRANSITS CSIRT training workshop | 32 | http://www.terena.org/activities/csirt-training/dublin11/ |
2011-09-12 to 2011-09-14 | Marrakech, Morrocco (Videoconference) | 23rd EUGridPMA Meeting | ~20 | http://www.eugridpma.org/meetings/2011-09/ |
2011-09-19 to 2011-09-23 | Lyon, France | EGI Technical Forum 2011 | ~500 | https://www.egi.eu/indico/conferenceTimeTable.py?confId=452 |
1.3. PUBLICATIONS
Publication title | Journal / Proceedings title | Journal references Volume number Issue Pages from - to |
Authors 1. 2. 3. Et al? |
---|
2. ACTIVITY REPORT
2.1. Progress Summary
- Installation of WS-PGRADE portal started.
- Grid-Ireland CA
- Renewed RA in UCC (Cork). Added RA in ICHEC (Galway).
- Operational Security
- On-going proactive kernel and errata updates on all NGI_IE sites.
2.2. Main Achievements
- Participated in EGI CSIRT, including monthly and weekly meetings, and as EGI CSIRT duty contact for week starting 2011-10-31.
- Joined EGI Federated Clouds Task Force as Resource Provider and participated in weekly meetings. Began process of making resources available via cloud interfaces, including successful conversion of WN to StratusLab cloud node, and operation of virtual WN within local cloud.
- GPU cluster integration completed.
2.3. Issues and mitigation
Issue Description | Mitigation Description |
---|---|
Reliability problems with storage used for shared cluster homes, including disk failures and system freezes | Migrated cluster homes to alternative hardware |
Scheduled cooling and networking shut down in UCC required unscheduled downtime. | Requested admins in UCC to give NGI_IE advance warning of their scheduled downtimes to permit scheduling in EGI. |
Site deployment of cream-ce will be required for WLCG | Added deployment of CREAM-CE to to-do list. |
2011-10-27 Power and cooling failure in TCD required unscheduled downtime. | At time of writing, cooling and power are operational. Those responsible for cooling and power are investigating underlying cause of the problem. |