Difference between revisions of "EGI-InSPIRE:SA1.8-QR5"
Jump to navigation
Jump to search
Core Services for uncertified sites
GOCWIKI
(17 intermediate revisions by 4 users not shown) | |||
Line 1: | Line 1: | ||
{{Template:EGI-Inspire menubar}} | |||
{{Template:Inspire_reports_menubar}} | |||
{{TOC_right}} | |||
= 1. Task Meetings = | = 1. Task Meetings = | ||
Line 13: | Line 15: | ||
| https://www.egi.eu/indico/conferenceDisplay.py?confId=481 | | https://www.egi.eu/indico/conferenceDisplay.py?confId=481 | ||
| Documentation workshop, Zürich | | Documentation workshop, Zürich | ||
| | | Operations procedure manuals, Best Practices wiki pages and GOCWIKI transfer were the main focus of the workshop. | ||
|- | |- | ||
| 29/07/2011 - 29/07/2011 | | 29/07/2011 - 29/07/2011 | ||
Line 19: | Line 21: | ||
| 4th OLA Task Force meeting | | 4th OLA Task Force meeting | ||
| Evolution of the RP OLA | | Evolution of the RP OLA | ||
|- | |||
| 25/05/2011 | |||
| https://www.egi.eu/indico/conferenceDisplay.py?confId=490 | |||
| Op. Doc.:Operational Procedures | |||
| Preparation for the Workshop | |||
|- | |||
| 9/05/2011 | |||
| https://www.egi.eu/indico/conferenceDisplay.py?confId=470 | |||
| Operational Documentation: GOCwiki transfer | |||
| Finalisation of steps for the transfer | |||
|} | |} | ||
= 2. Main Achievements = | = 2. Main Achievements = | ||
* | <br> | ||
*The RC OLA[https://documents.egi.eu/document/31] has been finalized and approved based on the comments received from the OMB at Vilnius on April on June. | |||
*With WLCG collaboration, EGI league reports now use the new ACE availability calculation system, which supports different profiles, an important step towards obtaining different reports for different services in the future (ie Core Services). | |||
*From May 2011 onwards, EGI thresholds for suspending a site have been increased to 70%/75% Availability/Reliability, based on the evaluation perform in recent months | |||
==== Core Services for uncertified sites<br> ==== | |||
* WMS, LB, and TopBDII service has been launched to be used for uncertified sites | |||
* A webpage [https://cert-devel.grid.auth.gr/] where the NGI managers can add the uncertified sites has been created and a demo version has been presented in July OMB. NGI managers can use this page to add uncertified sites to the Catch All certification infrastructure. | |||
==== EGI Catch-All CA ==== | |||
The EGI Catch All CA is servicing 5 countries which do not have a national accredited Certification Authority. These countries are Albania, Azerbaijan, Bosnia and Herzegovina, Georgia and Senegal. | |||
===== GOCWIKI<br> ===== | |||
*A deadline was set for closing the GOCWIKI (end of September 2011). | |||
*The wiki transfer is almost completed. There is effectively nothing left on GOCWIKI. | |||
===== PROCEDURE MANUALS ===== | |||
*All sections except the ROD part are in excellent shape. These only need OMB approval for release. | |||
*The ROD part still needs some work, and feedback form COD would be appreciated. | |||
===== BEST PRACTICES ===== | |||
*Completed and fully operational. Only requires people to contribute. | |||
= 3. Issues and Mitigation = | = 3. Issues and Mitigation = | ||
Line 32: | Line 71: | ||
! scope="col" | Mitigation Description | ! scope="col" | Mitigation Description | ||
|- | |- | ||
| The problem of getting people to participate in the Operational Documentation group is still an ongoing issue. | |||
|} | |} | ||
= 4. Plans for the next period = | = 4. Plans for the next period = | ||
* Produce a new RP OLA draft, to discuss in the OLA workshop in Lyon | |||
* Explore the options provided by ACE profiles to obtain reports for NGI/Core services | |||
* Adjust the WLCG recalculation policy and procedure for EGI sites to EGI needs | |||
* Investigate options for replication of the ops VO from CERN to EGI catch-all VOMS. | |||
= 5. Number of sites suspended = | = 5. Number of sites suspended = |
Latest revision as of 19:18, 6 January 2015
EGI Inspire Main page |
Inspire reports menu: | Home • | SA1 weekly Reports • | SA1 Task QR Reports • | NGI QR Reports • | NGI QR User support Reports |
1. Task Meetings
Date (dd/mm/yyyy) | Url Indico Agenda | Title | Outcome |
---|---|---|---|
14/06/2011 - 16/06/2011 | https://www.egi.eu/indico/conferenceDisplay.py?confId=481 | Documentation workshop, Zürich | Operations procedure manuals, Best Practices wiki pages and GOCWIKI transfer were the main focus of the workshop. |
29/07/2011 - 29/07/2011 | https://www.egi.eu/indico/conferenceDisplay.py?confId=559 | 4th OLA Task Force meeting | Evolution of the RP OLA |
25/05/2011 | https://www.egi.eu/indico/conferenceDisplay.py?confId=490 | Op. Doc.:Operational Procedures | Preparation for the Workshop |
9/05/2011 | https://www.egi.eu/indico/conferenceDisplay.py?confId=470 | Operational Documentation: GOCwiki transfer | Finalisation of steps for the transfer |
2. Main Achievements
- The RC OLA[1] has been finalized and approved based on the comments received from the OMB at Vilnius on April on June.
- With WLCG collaboration, EGI league reports now use the new ACE availability calculation system, which supports different profiles, an important step towards obtaining different reports for different services in the future (ie Core Services).
- From May 2011 onwards, EGI thresholds for suspending a site have been increased to 70%/75% Availability/Reliability, based on the evaluation perform in recent months
Core Services for uncertified sites
- WMS, LB, and TopBDII service has been launched to be used for uncertified sites
- A webpage [2] where the NGI managers can add the uncertified sites has been created and a demo version has been presented in July OMB. NGI managers can use this page to add uncertified sites to the Catch All certification infrastructure.
EGI Catch-All CA
The EGI Catch All CA is servicing 5 countries which do not have a national accredited Certification Authority. These countries are Albania, Azerbaijan, Bosnia and Herzegovina, Georgia and Senegal.
GOCWIKI
- A deadline was set for closing the GOCWIKI (end of September 2011).
- The wiki transfer is almost completed. There is effectively nothing left on GOCWIKI.
PROCEDURE MANUALS
- All sections except the ROD part are in excellent shape. These only need OMB approval for release.
- The ROD part still needs some work, and feedback form COD would be appreciated.
BEST PRACTICES
- Completed and fully operational. Only requires people to contribute.
3. Issues and Mitigation
Issue Description | Mitigation Description |
---|---|
The problem of getting people to participate in the Operational Documentation group is still an ongoing issue. |
4. Plans for the next period
- Produce a new RP OLA draft, to discuss in the OLA workshop in Lyon
- Explore the options provided by ACE profiles to obtain reports for NGI/Core services
- Adjust the WLCG recalculation policy and procedure for EGI sites to EGI needs
- Investigate options for replication of the ops VO from CERN to EGI catch-all VOMS.
5. Number of sites suspended
Month | Suspended sites |
---|---|
Apr 2011 | 0 |
May 2011 | 2 |
June 2011 | 7 |