- 10:50, 14 February 2011 diff hist +23 Underperforming sites and suspensions
- 10:50, 14 February 2011 diff hist +135 Underperforming sites and suspensions
- 10:30, 14 February 2011 diff hist −12 PROC02 Operations Centre creation
- 16:37, 10 February 2011 diff hist +712 EGI-InSPIRE:Poland-QR3 →1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED
- 15:43, 10 February 2011 diff hist +186 EGI-InSPIRE:Poland-QR3
- 12:01, 10 February 2011 diff hist +159 WI03 RC and RP OLA violation report followup →Internal procedure for COD
- 12:00, 10 February 2011 diff hist −13 WI03 RC and RP OLA violation report followup →Internal procedure for COD
- 12:00, 10 February 2011 diff hist −52 WI03 RC and RP OLA violation report followup →Internal procedure for COD
- 11:20, 10 February 2011 diff hist +248 EGI-InSPIRE:Poland-QR3 →1.1. CONFERENCES/WORKSHOPS ORGANISED
- 11:35, 9 February 2011 diff hist 0 EGI-InSPIRE:Poland-QR3 →2.1. Progress Summary
- 11:34, 9 February 2011 diff hist +39 EGI-InSPIRE:Poland-QR3 →2.1. Progress Summary
- 11:24, 9 February 2011 diff hist 0 EGI-InSPIRE:Poland-CYFRONET Metrics
- 11:16, 9 February 2011 diff hist −1 EGI-InSPIRE:Poland-CYFRONET Metrics
- 11:14, 9 February 2011 diff hist +1 EGI-InSPIRE:Poland-CYFRONET Metrics
- 11:13, 9 February 2011 diff hist +14 EGI-InSPIRE:Poland-CYFRONET Metrics
- 10:41, 9 February 2011 diff hist 0 EGI-InSPIRE:Poland-CYFRONET Metrics
- 09:57, 9 February 2011 diff hist +658 EGI-InSPIRE:Poland-QR3 →2. ACTIVITY REPORT
- 09:49, 9 February 2011 diff hist +19 EGI-InSPIRE:Poland-CYFRONET Metrics
- 09:47, 9 February 2011 diff hist −462 EGI-InSPIRE:Poland-QR3 →1.3. PUBLICATIONS
- 09:47, 9 February 2011 diff hist −199 EGI-InSPIRE:Poland-QR3 →1.1. CONFERENCES/WORKSHOPS ORGANISED
- 09:46, 9 February 2011 diff hist −90 EGI-InSPIRE:Poland-QR3 →1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED
- 14:54, 4 February 2011 diff hist +133 Underperforming sites and suspensions
- 12:48, 4 February 2011 diff hist 0 EGI-InSPIRE:Poland-CYFRONET Metrics
- 16:25, 3 February 2011 diff hist −8 EGI-InSPIRE:Poland-CYFRONET Metrics
- 15:47, 3 February 2011 diff hist −9 EGI-InSPIRE:Poland-CYFRONET Metrics
- 15:38, 3 February 2011 diff hist 0 EGI-InSPIRE:Poland-CYFRONET Metrics
- 15:29, 3 February 2011 diff hist −9 EGI-InSPIRE:Poland-CYFRONET Metrics
- 15:01, 3 February 2011 diff hist −9 EGI-InSPIRE:Poland-CYFRONET Metrics
- 14:59, 3 February 2011 diff hist −9 EGI-InSPIRE:Poland-CYFRONET Metrics
- 14:58, 3 February 2011 diff hist −17 EGI-InSPIRE:Poland-CYFRONET Metrics
- 14:53, 3 February 2011 diff hist −16 EGI-InSPIRE:Poland-CYFRONET Metrics
- 14:32, 3 February 2011 diff hist +1 EGI-InSPIRE:Poland-QR3
- 14:20, 3 February 2011 diff hist −50 EGI-InSPIRE:Poland-QR3
- 15:14, 31 January 2011 diff hist +12 Agenda-31-01-2011 →4 - COD issues (Malgorzata, Luuk)
- 18:18, 28 January 2011 diff hist +1 EGI Infrastructure operations oversight
- 18:07, 28 January 2011 diff hist +48 EGI Infrastructure operations oversight
- 17:50, 28 January 2011 diff hist −17 EGI Infrastructure operations oversight
- 17:49, 28 January 2011 diff hist +1 EGI Infrastructure operations oversight
- 17:48, 28 January 2011 diff hist +126 EGI Infrastructure operations oversight →EGI.eu Operations Oversight Pages
- 17:45, 28 January 2011 diff hist +319 EGI Infrastructure operations oversight
- 17:54, 27 January 2011 diff hist +28 EGI Infrastructure operations oversight
- 17:53, 27 January 2011 diff hist +367 EGI Infrastructure operations oversight
- 17:23, 27 January 2011 diff hist +73 EGI Infrastructure operations oversight
- 17:21, 27 January 2011 diff hist +18 GOCDB/Input System User Documentation →Adding Groups
- 17:20, 27 January 2011 diff hist +646 PROC02 Operations Centre creation
- 17:08, 27 January 2011 diff hist 0 m PROC02 Operations Centre creation moved Operations:NewNGIs creation to Operations Centre creation process coordination
- 17:05, 27 January 2011 diff hist +125 EGI Infrastructure operations oversight →EGI.eu Operations Oversight Pages
- 16:20, 26 January 2011 diff hist +15 EGI Infrastructure operations oversight
- 15:47, 25 January 2011 diff hist +15 PROC06 Setting Nagios test status to operations
- 15:47, 25 January 2011 diff hist +14 PROC03 Operations Centre decommission
- 15:45, 25 January 2011 diff hist +14 PROC02 Operations Centre creation
- 13:42, 24 January 2011 diff hist +26 PROC02 Operations Centre creation
- 16:24, 20 January 2011 diff hist +20 PROC03 Operations Centre decommission →Revision history
- 16:22, 20 January 2011 diff hist +241 PROC03 Operations Centre decommission →Operations Centre decommission process steps
- 14:00, 20 January 2011 diff hist +9 PROC03 Operations Centre decommission
- 12:56, 20 January 2011 diff hist −114 PROC03 Operations Centre decommission →Operations Centre decommission process steps
- 15:15, 18 January 2011 diff hist +114 PROC03 Operations Centre decommission →Operations Centre decommission process steps
- 17:45, 11 January 2011 diff hist +75 EGI Infrastructure operations oversight
- 15:14, 10 January 2011 diff hist +83 PROC03 Operations Centre decommission →Revision history
- 15:13, 10 January 2011 diff hist +341 PROC03 Operations Centre decommission →Operations Centre prerequisities
- 15:11, 7 January 2011 diff hist −756 EGI Infrastructure operations oversight
- 15:09, 7 January 2011 diff hist +305 EGI Infrastructure operations oversight
- 15:07, 7 January 2011 diff hist +185 EGI Infrastructure operations oversight →Internal area
- 15:05, 7 January 2011 diff hist −10 EGI Infrastructure operations oversight →COD shifters daily work instructions
- 15:04, 7 January 2011 diff hist +3 EGI Infrastructure operations oversight →COD shifters daily work instructions
- 15:04, 7 January 2011 diff hist +1 EGI Infrastructure operations oversight →COD shifters daily work instructions
- 15:03, 7 January 2011 diff hist +13 EGI Infrastructure operations oversight
- 15:01, 7 January 2011 diff hist +105 EGI Infrastructure operations oversight
- 14:59, 7 January 2011 diff hist +76 EGI Infrastructure operations oversight
- 13:51, 30 December 2010 diff hist +72 EGI Infrastructure operations oversight →Operational portal dashboard issues
- 11:39, 29 December 2010 diff hist +6 EGI Infrastructure operations oversight →GGUS tickets assigned to COD
- 11:38, 29 December 2010 diff hist +14 EGI Infrastructure operations oversight
- 11:27, 29 December 2010 diff hist −20 EGI Infrastructure operations oversight →COD shifters daily work instructions
- 11:26, 29 December 2010 diff hist +7 EGI Infrastructure operations oversight →Dealing with the GGUS tickets assigned to COD
- 11:25, 29 December 2010 diff hist +3 EGI Infrastructure operations oversight →Dealing with the GGUS tickets assigned to COD
- 11:25, 29 December 2010 diff hist +10 EGI Infrastructure operations oversight →Dealing with the GGUS tickets assigned to COD
- 11:24, 29 December 2010 diff hist −108 EGI Infrastructure operations oversight →Operational Portal: Dashboard
- 11:19, 29 December 2010 diff hist −394 EGI Infrastructure operations oversight
- 13:32, 23 December 2010 diff hist −2 PROC03 Operations Centre decommission
- 13:07, 22 December 2010 diff hist +24 Underperforming sites and suspensions
- 13:06, 22 December 2010 diff hist +66 Underperforming sites and suspensions
- 13:20, 20 December 2010 diff hist −34 Underperforming sites and suspensions
- 13:19, 20 December 2010 diff hist +34 Underperforming sites and suspensions
- 13:18, 20 December 2010 diff hist +1 Underperforming sites and suspensions
- 16:22, 14 December 2010 diff hist +2 PROC03 Operations Centre decommission →Operations Centre decommission request validation
- 12:59, 13 December 2010 diff hist +1 PROC02 Operations Centre creation →Technical Validation
- 12:56, 13 December 2010 diff hist +23 PROC02 Operations Centre creation →Validation of NGI creation request
- 12:15, 13 December 2010 diff hist −6 PROC02 Operations Centre creation →Procedure for the creation and validation of a new NGI
- 16:49, 10 December 2010 diff hist +4 EGI Infrastructure operations oversight →COD shifters daily work instructions
- 16:47, 10 December 2010 diff hist +12 EGI Infrastructure operations oversight →Internal area
- 16:28, 10 December 2010 diff hist +14 EGI Infrastructure operations oversight →COD shifters daily work instructions
- 15:58, 10 December 2010 diff hist +23 EGI Infrastructure operations oversight →COD shifters daily work instructions
- 09:33, 10 December 2010 diff hist −715 WI03 RC and RP OLA violation report followup →Best practice
- 09:32, 10 December 2010 diff hist −54 PROC03 Operations Centre decommission
- 11:30, 9 December 2010 diff hist +83 EGI Infrastructure operations oversight →COD offical web pages
- 11:08, 9 December 2010 diff hist −21 WI01 ROD certification ticket handling
- 11:07, 9 December 2010 diff hist −347 WI01 ROD certification ticket handling
- 10:16, 9 December 2010 diff hist +7 PROC06 Setting Nagios test status to operations →Setting Nagios tests operational request
- 10:15, 9 December 2010 diff hist −1 PROC06 Setting Nagios test status to operations
- 10:15, 9 December 2010 diff hist −27 Operations SAM tests
- 10:14, 9 December 2010 diff hist −1 SAM Tests
- 10:14, 9 December 2010 diff hist +1 EGI Infrastructure operations oversight
- 10:11, 9 December 2010 diff hist +11 PROC06 Setting Nagios test status to operations
- 09:44, 9 December 2010 diff hist −1 EGI Infrastructure operations oversight →Operational Portal: Dashboard
- 09:44, 9 December 2010 diff hist −949 EGI Infrastructure operations oversight
- 09:41, 9 December 2010 diff hist +5 EGI Infrastructure operations oversight →Dealing with the GGUS tickets assigned to COD
- 09:40, 9 December 2010 diff hist −1 EGI Infrastructure operations oversight →Dealing with the GGUS tickets assigned to COD
- 09:39, 9 December 2010 diff hist −1 EGI Infrastructure operations oversight →Dealing with the GGUS tickets assigned to COD
- 09:38, 9 December 2010 diff hist +16 EGI Infrastructure operations oversight →Procedures used in COD activity
- 09:36, 9 December 2010 diff hist +60 EGI Infrastructure operations oversight
- 17:22, 8 December 2010 diff hist −1 EGI Infrastructure operations oversight →Procedures used in COD activity
- 17:21, 8 December 2010 diff hist +119 EGI Infrastructure operations oversight
- 16:52, 6 December 2010 diff hist +133 WI01 ROD certification ticket handling
- 16:44, 6 December 2010 diff hist +86 WI01 ROD certification ticket handling
- 16:36, 6 December 2010 diff hist −167 EGI Infrastructure operations oversight →COD shifters daily work instructions
- 16:34, 6 December 2010 diff hist −102 Operations SAM tests
- 16:32, 6 December 2010 diff hist +14 SAM Tests →Operations Portal
- 16:31, 6 December 2010 diff hist +88 PROC06 Setting Nagios test status to operations
- 16:28, 6 December 2010 diff hist +44 EGI Infrastructure operations oversight →Dealing with the GGUS tickets assigned to COD
- 16:27, 6 December 2010 diff hist 0 m PROC06 Setting Nagios test status to operations moved Operations:Procedure for setting Nagios test critical for COD to Operations:Procedure for setting Nagios test operational for COD
- 16:26, 6 December 2010 diff hist +254 EGI Infrastructure operations oversight
- 13:44, 6 December 2010 diff hist +100 PROC02 Operations Centre creation →Revision history
- 13:40, 6 December 2010 diff hist +13 PROC02 Operations Centre creation →NGI creation process steps
- 13:40, 6 December 2010 diff hist +4 PROC02 Operations Centre creation →NGI creation process steps
- 13:40, 6 December 2010 diff hist +510 PROC02 Operations Centre creation →NGI creation process steps
- 12:27, 6 December 2010 diff hist −152 WI01 ROD certification ticket handling
- 12:23, 6 December 2010 diff hist +7 WI01 ROD certification ticket handling
- 10:50, 6 December 2010 diff hist +51 WI01 ROD certification ticket handling
- 10:35, 6 December 2010 diff hist −6 WI03 RC and RP OLA violation report followup
- 23:41, 4 December 2010 diff hist +7 EGI Infrastructure operations oversight →New ROD team certification work instruction
- 23:41, 4 December 2010 diff hist 0 m WI01 ROD certification ticket handling moved Procedure to handle new ROD certification GGUS tickets to Work instruction to handle new ROD certification GGUS tickets
- 23:39, 4 December 2010 diff hist +18 EGI Infrastructure operations oversight →Issues on Operational portal dashboard
- 23:36, 4 December 2010 diff hist +57 EGI Infrastructure operations oversight →Handover
- 23:34, 4 December 2010 diff hist −9 EGI Infrastructure operations oversight →Internal area
- 23:34, 4 December 2010 diff hist +7 EGI Infrastructure operations oversight →Internal area
- 23:32, 4 December 2010 diff hist +23 EGI Infrastructure operations oversight →Internal area
- 23:31, 4 December 2010 diff hist −1 EGI Infrastructure operations oversight →Operational Portal: Dashboard =
- 23:31, 4 December 2010 diff hist +58 EGI Infrastructure operations oversight →Internal area
- 23:29, 4 December 2010 diff hist −19 EGI Infrastructure operations oversight →Availability/reliability reports
- 23:29, 4 December 2010 diff hist 0 m Underperforming sites and suspensions moved Availability and reliability internal procedure for COD metrics to Availability and reliability reports metrics
- 23:25, 4 December 2010 diff hist 0 m WI03 RC and RP OLA violation report followup moved Availability and reliability internal procedure for COD to Availability and reliability work instruction for COD
- 16:43, 3 December 2010 diff hist +14 EGI Infrastructure operations oversight
- 16:41, 3 December 2010 diff hist 0 WI03 RC and RP OLA violation report followup →Internal procedure for COD
- 16:40, 3 December 2010 diff hist +472 Underperforming sites and suspensions
- 16:29, 3 December 2010 diff hist −2 WI03 RC and RP OLA violation report followup →Request for explanation
- 11:57, 3 December 2010 diff hist −16 PROC06 Setting Nagios test status to operations →Validation
- 11:52, 3 December 2010 diff hist −7 PROC06 Setting Nagios test status to operations
- 09:25, 2 December 2010 diff hist +533 EGI Infrastructure operations oversight →Dealing with the GGUS tickets assigned to COD
- 09:20, 2 December 2010 diff hist +38 EGI Infrastructure operations oversight
- 09:19, 2 December 2010 diff hist +211 EGI Infrastructure operations oversight
- 09:18, 2 December 2010 diff hist +4 EGI Infrastructure operations oversight →COD shifters daily work instructions
- 09:17, 2 December 2010 diff hist +79 EGI Infrastructure operations oversight
- 14:57, 1 December 2010 diff hist −7 EGI Infrastructure operations oversight
- 11:59, 1 December 2010 diff hist +18 Underperforming sites and suspensions
- 11:58, 1 December 2010 diff hist +74 Underperforming sites and suspensions
- 11:54, 1 December 2010 diff hist +75 Underperforming sites and suspensions
- 11:52, 1 December 2010 diff hist +350 Underperforming sites and suspensions
- 11:48, 1 December 2010 diff hist +6 Underperforming sites and suspensions
- 11:45, 1 December 2010 diff hist +4 Underperforming sites and suspensions
- 12:07, 29 November 2010 diff hist +146 WI03 RC and RP OLA violation report followup →Internal procedure for COD
- 15:05, 26 November 2010 diff hist +345 EGI Infrastructure operations oversight →COD shifters daily work instructions
- 13:50, 26 November 2010 diff hist −8 EGI Infrastructure operations oversight →COD shifters daily work instructions
- 13:49, 26 November 2010 diff hist +61 EGI Infrastructure operations oversight
- 13:48, 26 November 2010 diff hist +338 EGI Infrastructure operations oversight →COD shifters daily work instructions
- 13:41, 26 November 2010 diff hist +220 EGI Infrastructure operations oversight
- 13:37, 26 November 2010 diff hist +21 EGI Infrastructure operations oversight
- 13:34, 26 November 2010 diff hist +10 EGI Infrastructure operations oversight →COD shifters daily duties
- 13:07, 26 November 2010 diff hist +399 PROC06 Setting Nagios test status to operations →Validation
- 13:03, 26 November 2010 diff hist −126 PROC06 Setting Nagios test status to operations →Prerequisites
- 12:46, 26 November 2010 diff hist +68 PROC06 Setting Nagios test status to operations →Validation
- 12:15, 26 November 2010 diff hist +13 PROC06 Setting Nagios test status to operations →Validation
- 12:09, 26 November 2010 diff hist +39 PROC06 Setting Nagios test status to operations →Validation
- 12:08, 26 November 2010 diff hist −2 PROC06 Setting Nagios test status to operations →Prerequisites
- 12:07, 26 November 2010 diff hist −1,237 PROC06 Setting Nagios test status to operations
- 16:42, 25 November 2010 diff hist +96 PROC02 Operations Centre creation
- 12:25, 19 November 2010 diff hist −3 PROC06 Setting Nagios test status to operations →Prerequisites
- 12:24, 19 November 2010 diff hist −116 PROC06 Setting Nagios test status to operations
- 11:45, 18 November 2010 diff hist 0 Operations SAM tests
- 11:44, 18 November 2010 diff hist +105 Operations SAM tests
- 14:19, 15 November 2010 diff hist −34 PROC02 Operations Centre creation →NGI creation process steps
- 10:44, 15 November 2010 diff hist +14 Underperforming sites and suspensions
- 10:41, 15 November 2010 diff hist +10 Underperforming sites and suspensions
- 10:39, 15 November 2010 diff hist +18 Underperforming sites and suspensions
- 10:31, 15 November 2010 diff hist +9 Underperforming sites and suspensions
- 10:27, 15 November 2010 diff hist +4 Underperforming sites and suspensions
- 10:26, 15 November 2010 diff hist +121 Underperforming sites and suspensions
- 10:25, 15 November 2010 diff hist +247 N Underperforming sites and suspensions Created page with '{| border="1" cellspacing="0" cellpadding="5" align="center" !date !nb. sites below 75%/70% targets !nb. sites below 50% target for 3 months !nb. sites which didn't provided expl…'
- 10:17, 15 November 2010 diff hist +93 EGI Infrastructure operations oversight
- 14:35, 10 November 2010 diff hist −196 PROC03 Operations Centre decommission →Known issues
- 14:34, 10 November 2010 diff hist −53 PROC03 Operations Centre decommission →Known issues
- 14:33, 10 November 2010 diff hist −48 EGI Infrastructure operations oversight →Internal area
- 14:08, 10 November 2010 diff hist −1 EGI Infrastructure operations oversight
- 13:46, 10 November 2010 diff hist −1 PROC06 Setting Nagios test status to operations
- 12:35, 10 November 2010 diff hist +5 Operations SAM tests
- 12:35, 10 November 2010 diff hist +20 Operations SAM tests
- 12:34, 10 November 2010 diff hist +1 Operations SAM tests
- 12:32, 10 November 2010 diff hist +342 Operations SAM tests
- 11:44, 10 November 2010 diff hist +45 Operations SAM tests
- 11:29, 10 November 2010 diff hist 0 Operations SAM tests
- 11:26, 10 November 2010 diff hist +81 PROC06 Setting Nagios test status to operations
- 11:24, 10 November 2010 diff hist 0 Operations SAM tests
- 11:24, 10 November 2010 diff hist +244 Operations SAM tests
- 10:26, 10 November 2010 diff hist +56 EGI Infrastructure operations oversight →COD offical web pages
- 13:14, 9 November 2010 diff hist +3 PROC06 Setting Nagios test status to operations →Validation
- 13:13, 9 November 2010 diff hist −4 PROC06 Setting Nagios test status to operations →Validation
- 13:13, 9 November 2010 diff hist +147 PROC06 Setting Nagios test status to operations →Validation
- 13:12, 9 November 2010 diff hist +91 PROC06 Setting Nagios test status to operations →Validation
- 13:11, 9 November 2010 diff hist +53 PROC06 Setting Nagios test status to operations →Validation
- 13:10, 9 November 2010 diff hist +90 Operations SAM tests
- 13:09, 9 November 2010 diff hist −5 Operations SAM tests
- 13:08, 9 November 2010 diff hist 0 Operations SAM tests
- 13:08, 9 November 2010 diff hist −149 Operations SAM tests
- 13:03, 9 November 2010 diff hist −2 Operations SAM tests
- 13:03, 9 November 2010 diff hist −32 Operations SAM tests
- 13:00, 9 November 2010 diff hist −79 Operations SAM tests
- 12:59, 9 November 2010 diff hist +15 Operations SAM tests
- 12:59, 9 November 2010 diff hist 0 Operations SAM tests
- 12:58, 9 November 2010 diff hist 0 Operations SAM tests
- 12:58, 9 November 2010 diff hist −15 Operations SAM tests
- 12:57, 9 November 2010 diff hist +1,905 N Operations SAM tests Created page with 'List of Nagios tests per service that generate alarms for the COD dashboards. {| border="1" cellspacing="0" cellpadding="5" align="center" !Service !Nagios test |- | BDII / Top-B…'
- 12:49, 9 November 2010 diff hist +174 PROC06 Setting Nagios test status to operations
- 12:48, 9 November 2010 diff hist +9 PROC06 Setting Nagios test status to operations →Requirements to be implemented
- 12:47, 9 November 2010 diff hist +1 PROC06 Setting Nagios test status to operations →Validation
- 12:46, 9 November 2010 diff hist +152 PROC06 Setting Nagios test status to operations
- 12:45, 9 November 2010 diff hist −76 PROC06 Setting Nagios test status to operations →Request
- 12:45, 9 November 2010 diff hist +33 PROC06 Setting Nagios test status to operations
- 12:37, 9 November 2010 diff hist +56 PROC06 Setting Nagios test status to operations
- 11:12, 9 November 2010 diff hist +51 PROC06 Setting Nagios test status to operations →Procedure for setting global Nagios tests critical DRAFT
- 16:25, 4 November 2010 diff hist +28 WI03 RC and RP OLA violation report followup →Internal procedure for COD
- 16:24, 4 November 2010 diff hist −191 WI03 RC and RP OLA violation report followup →Internal procedure for COD
- 11:41, 3 November 2010 diff hist −1 PROC02 Operations Centre creation
- 11:04, 2 November 2010 diff hist −2 EGI Infrastructure operations oversight →OTAG topics
- 11:03, 2 November 2010 diff hist +906 EGI Infrastructure operations oversight
- 10:58, 27 October 2010 diff hist −10 PROC01 EGI Infrastructure Oversight escalation
- 10:24, 27 October 2010 diff hist −6 PROC01 EGI Infrastructure Oversight escalation →Escalation for operational problem at site
- 10:24, 27 October 2010 diff hist +6 PROC01 EGI Infrastructure Oversight escalation →Escalation for operational problem with ROD
- 10:24, 27 October 2010 diff hist +468 PROC01 EGI Infrastructure Oversight escalation
- 10:20, 27 October 2010 diff hist −998 PROC01 EGI Infrastructure Oversight escalation →Escalation for operational problem at site
- 09:59, 27 October 2010 diff hist +13 PROC01 EGI Infrastructure Oversight escalation →Escalation for operational problem with ROD
- 09:58, 27 October 2010 diff hist +15 PROC01 EGI Infrastructure Oversight escalation →Escalation for operational problem with ROD
- 09:58, 27 October 2010 diff hist +59 PROC01 EGI Infrastructure Oversight escalation →Escalation for operational problem with ROD
- 09:57, 27 October 2010 diff hist −59 PROC01 EGI Infrastructure Oversight escalation →Escalation for operational problem at site
- 09:54, 27 October 2010 diff hist +6 PROC01 EGI Infrastructure Oversight escalation →Escalation for operational problem with ROD
- 09:54, 27 October 2010 diff hist +20 PROC01 EGI Infrastructure Oversight escalation →Escalation for operational problem with ROD
- 09:53, 27 October 2010 diff hist +150 PROC01 EGI Infrastructure Oversight escalation →Escalation for operational problem at site
- 09:45, 27 October 2010 diff hist −42 PROC01 EGI Infrastructure Oversight escalation
- 09:44, 27 October 2010 diff hist −6 PROC01 EGI Infrastructure Oversight escalation →Escalation for operational problem at site
- 09:43, 27 October 2010 diff hist −1 PROC01 EGI Infrastructure Oversight escalation →Escalation for operational problem at site
- 09:42, 27 October 2010 diff hist +8 PROC01 EGI Infrastructure Oversight escalation →Escalation for operational problem at site
- 09:41, 27 October 2010 diff hist −33 PROC01 EGI Infrastructure Oversight escalation
- 09:40, 27 October 2010 diff hist −23 PROC01 EGI Infrastructure Oversight escalation →Escalation for operational problem at site
- 09:40, 27 October 2010 diff hist −69 PROC01 EGI Infrastructure Oversight escalation
- 09:40, 27 October 2010 diff hist +35 PROC01 EGI Infrastructure Oversight escalation
- 09:37, 27 October 2010 diff hist +428 PROC01 EGI Infrastructure Oversight escalation
- 17:50, 26 October 2010 diff hist +6 EGI Infrastructure operations oversight
- 15:15, 26 October 2010 diff hist −711 PROC03 Operations Centre decommission
- 15:14, 26 October 2010 diff hist +18 EGI Infrastructure operations oversight →Approved
- 15:14, 26 October 2010 diff hist −6 EGI Infrastructure operations oversight →Approved
- 15:13, 26 October 2010 diff hist 0 m PROC01 EGI Infrastructure Oversight escalation moved Operations:COD Escalation to Operations:COD Escalation Procedure
- 15:13, 26 October 2010 diff hist 0 m PROC01 EGI Infrastructure Oversight escalation moved Operations:COD Escalation new to Operations:COD Escalation
- 15:13, 26 October 2010 diff hist −96 EGI Infrastructure operations oversight →Internal area
- 15:11, 26 October 2010 diff hist +555 PROC01 EGI Infrastructure Oversight escalation
- 15:09, 26 October 2010 diff hist −509 PROC02 Operations Centre creation
- 11:05, 25 October 2010 diff hist −31 PROC01 EGI Infrastructure Oversight escalation
- 08:17, 25 October 2010 diff hist +1 PROC03 Operations Centre decommission
- 08:17, 25 October 2010 diff hist +738 PROC06 Setting Nagios test status to operations
- 17:37, 22 October 2010 diff hist +112 EGI Infrastructure operations oversight →Internal area
- 17:33, 22 October 2010 diff hist +1 PROC02 Operations Centre creation
- 17:33, 22 October 2010 diff hist 0 PROC02 Operations Centre creation →Revision history
- 17:32, 22 October 2010 diff hist −104 PROC02 Operations Centre creation →NGI creation process steps
- 17:32, 22 October 2010 diff hist −21 PROC02 Operations Centre creation →Revision history
- 17:22, 22 October 2010 diff hist +183 PROC02 Operations Centre creation
- 17:22, 22 October 2010 diff hist +445 PROC02 Operations Centre creation
- 17:21, 22 October 2010 diff hist +15 PROC03 Operations Centre decommission
- 17:19, 22 October 2010 diff hist −7 PROC03 Operations Centre decommission
- 17:19, 22 October 2010 diff hist +7 PROC03 Operations Centre decommission
- 17:16, 22 October 2010 diff hist +25 PROC03 Operations Centre decommission
- 17:16, 22 October 2010 diff hist +287 PROC03 Operations Centre decommission →Revision history
- 17:11, 22 October 2010 diff hist +568 PROC03 Operations Centre decommission
- 16:52, 22 October 2010 diff hist +249 PROC03 Operations Centre decommission →Known issues
- 16:45, 22 October 2010 diff hist +219 PROC03 Operations Centre decommission →Operations Centre decommission process steps
- 16:40, 22 October 2010 diff hist −26 PROC03 Operations Centre decommission →Operations Centre prerequisities
- 16:32, 22 October 2010 diff hist +8 PROC03 Operations Centre decommission →How to start the decommission process
- 16:31, 22 October 2010 diff hist +90 PROC03 Operations Centre decommission →Operations Centre decommission request validation
- 16:30, 22 October 2010 diff hist −3 PROC03 Operations Centre decommission →Operations Centre decommission request validation
- 16:29, 22 October 2010 diff hist +101 PROC03 Operations Centre decommission →Operations Centre decommission request validation
- 16:18, 22 October 2010 diff hist +339 PROC03 Operations Centre decommission
- 16:11, 22 October 2010 diff hist 0 m PROC03 Operations Centre decommission moved Operations:EGEE ROC decommission to Operations:Operations Centre decommission
- 08:04, 22 October 2010 diff hist +115 PROC06 Setting Nagios test status to operations →Procedure for setting global Nagios tests critical DRAFT
- 11:25, 15 October 2010 diff hist +12 PROC02 Operations Centre creation
- 16:36, 13 October 2010 diff hist +29 WI03 RC and RP OLA violation report followup →Questions/issues
- 14:02, 12 October 2010 diff hist +124 PROC03 Operations Centre decommission →EGEE ROC decommission process steps
- 14:01, 12 October 2010 diff hist +129 PROC03 Operations Centre decommission →Revision history
- 14:00, 12 October 2010 diff hist +85 PROC03 Operations Centre decommission →EGEE ROC decommission process steps
- 13:58, 12 October 2010 diff hist +124 PROC02 Operations Centre creation →Revision history
- 13:58, 12 October 2010 diff hist 0 PROC02 Operations Centre creation →NGI creation process steps
- 13:57, 12 October 2010 diff hist +113 PROC02 Operations Centre creation →NGI creation process steps
- 13:54, 12 October 2010 diff hist +56 PROC02 Operations Centre creation →NGI creation process steps
- 13:52, 12 October 2010 diff hist +286 PROC02 Operations Centre creation →NGI creation process steps
- 10:55, 11 October 2010 diff hist +4 WI03 RC and RP OLA violation report followup →How to use ticket generator
- 10:55, 11 October 2010 diff hist +120 WI03 RC and RP OLA violation report followup →How to use ticket generator
- 10:52, 11 October 2010 diff hist +1 WI03 RC and RP OLA violation report followup →Questions/issues
- 10:52, 11 October 2010 diff hist +55 WI03 RC and RP OLA violation report followup →Questions/issues
- 08:28, 11 October 2010 diff hist +98 EGI Infrastructure operations oversight →Pages in draft state
- 08:12, 11 October 2010 diff hist +14 PROC02 Operations Centre creation →Revision history
- 08:11, 11 October 2010 diff hist +101 PROC02 Operations Centre creation →Revision history
- 08:10, 11 October 2010 diff hist +18 PROC02 Operations Centre creation →NGI creation process steps
- 08:10, 11 October 2010 diff hist +6 PROC02 Operations Centre creation →NGI creation process steps
- 08:09, 11 October 2010 diff hist +100 PROC02 Operations Centre creation →NGI creation process steps
- 17:47, 9 October 2010 diff hist +7 EGI Infrastructure operations oversight →To be approved by OMB
- 17:46, 9 October 2010 diff hist −1 EGI Infrastructure operations oversight →Internal area
- 17:46, 9 October 2010 diff hist −29 EGI Infrastructure operations oversight
- 17:44, 9 October 2010 diff hist +2 EGI Infrastructure operations oversight →Internal area
- 17:44, 9 October 2010 diff hist +252 EGI Infrastructure operations oversight
- 17:43, 9 October 2010 diff hist +50 EGI Infrastructure operations oversight →Internal area
- 15:01, 8 October 2010 diff hist +269 PROC01 EGI Infrastructure Oversight escalation
- 15:00, 8 October 2010 diff hist +155 PROC01 EGI Infrastructure Oversight escalation Undo revision 3724 by Mkrakowi (Talk)
- 15:00, 8 October 2010 diff hist −1 PROC01 EGI Infrastructure Oversight escalation
- 14:58, 8 October 2010 diff hist −156 PROC01 EGI Infrastructure Oversight escalation →Escalation for security problem at site
- 14:58, 8 October 2010 diff hist +17 PROC01 EGI Infrastructure Oversight escalation →Escalation for security problem at site
- 14:58, 8 October 2010 diff hist −285 PROC01 EGI Infrastructure Oversight escalation →Escalation for security problem at site
- 14:22, 8 October 2010 diff hist +15 PROC06 Setting Nagios test status to operations
- 14:19, 8 October 2010 diff hist −77 PROC06 Setting Nagios test status to operations
- 15:52, 6 October 2010 diff hist +80 PROC06 Setting Nagios test status to operations
- 14:19, 6 October 2010 diff hist +64 WI03 RC and RP OLA violation report followup →Internal procedure for COD
- 14:18, 6 October 2010 diff hist +68 WI03 RC and RP OLA violation report followup →Internal procedure for COD
- 14:16, 6 October 2010 diff hist +293 WI03 RC and RP OLA violation report followup →Internal procedure for COD
- 14:14, 6 October 2010 diff hist +4 WI03 RC and RP OLA violation report followup →Internal procedure for COD
- 14:14, 6 October 2010 diff hist +252 WI03 RC and RP OLA violation report followup →Internal procedure for COD
- 14:13, 6 October 2010 diff hist +98 WI03 RC and RP OLA violation report followup →Internal procedure for COD
- 14:11, 6 October 2010 diff hist +36 WI03 RC and RP OLA violation report followup →Internal procedure for COD
- 14:06, 6 October 2010 diff hist +1,091 WI03 RC and RP OLA violation report followup
- 10:53, 6 October 2010 diff hist −37 WI01 ROD certification ticket handling
- 10:52, 6 October 2010 diff hist −252 WI01 ROD certification ticket handling
- 10:43, 6 October 2010 diff hist +87 PROC02 Operations Centre creation →NGI creation process steps
- 13:49, 5 October 2010 diff hist +20 EGI Infrastructure operations oversight →Pages in draft state
- 12:49, 5 October 2010 diff hist +16 EGI Infrastructure operations oversight
- 11:43, 5 October 2010 diff hist +8 WI01 ROD certification ticket handling
- 11:35, 5 October 2010 diff hist −13 WI01 ROD certification ticket handling
- 07:47, 5 October 2010 diff hist +1 WI03 RC and RP OLA violation report followup →Questions/issues
- 07:46, 5 October 2010 diff hist −15 WI03 RC and RP OLA violation report followup →Questions/issues
- 07:46, 5 October 2010 diff hist +364 WI03 RC and RP OLA violation report followup →Questions/issues
- 15:54, 4 October 2010 diff hist 0 WI03 RC and RP OLA violation report followup →How to use ticket generator
- 11:47, 4 October 2010 diff hist +89 EGI Infrastructure operations oversight →Pages in draft state
- 11:34, 4 October 2010 diff hist +128 EGI Infrastructure operations oversight Undo revision 3447 by Mkrakowi (Talk)
- 11:34, 4 October 2010 diff hist −128 EGI Infrastructure operations oversight →COD shifters daily duties
- 10:15, 29 September 2010 diff hist +9 WI01 ROD certification ticket handling
- 14:25, 28 September 2010 diff hist +73 PROC01 EGI Infrastructure Oversight escalation →Escalation for operational problem with ROD
- 14:14, 28 September 2010 diff hist +16 PROC01 EGI Infrastructure Oversight escalation →Escalation for operational problem with ROD
- 14:14, 28 September 2010 diff hist +32 PROC01 EGI Infrastructure Oversight escalation →Escalation for operational problem with ROD
- 14:13, 28 September 2010 diff hist +12 PROC01 EGI Infrastructure Oversight escalation →Escalation for operational problem with ROD
- 14:11, 28 September 2010 diff hist −1 PROC01 EGI Infrastructure Oversight escalation →Escalation for operational problem with ROD
- 14:00, 28 September 2010 diff hist −12 PROC01 EGI Infrastructure Oversight escalation →Escalation for operational problem with ROD
- 13:58, 28 September 2010 diff hist +43 PROC01 EGI Infrastructure Oversight escalation →Escalation for operational problem with ROD
- 13:54, 28 September 2010 diff hist −205 PROC01 EGI Infrastructure Oversight escalation →Escalation for operational problem with ROD
- 13:50, 28 September 2010 diff hist +1,169 PROC01 EGI Infrastructure Oversight escalation →Escalation for operational problem with ROD
- 11:02, 28 September 2010 diff hist −4 PROC06 Setting Nagios test status to operations →Prerequisities
- 12:19, 27 September 2010 diff hist +39 PROC06 Setting Nagios test status to operations →Requirements to be implemented
- 13:30, 23 September 2010 diff hist +6 PROC06 Setting Nagios test status to operations →Prerequisities
- 13:30, 23 September 2010 diff hist −59 PROC06 Setting Nagios test status to operations →Setting Nagios tests critical steps
- 13:25, 23 September 2010 diff hist +24 PROC06 Setting Nagios test status to operations
- 13:22, 23 September 2010 diff hist −12 PROC06 Setting Nagios test status to operations →Setting Nagios tests critical request
- 13:22, 23 September 2010 diff hist −3 PROC06 Setting Nagios test status to operations →Setting Nagios tests critical steps
- 13:22, 23 September 2010 diff hist −168 PROC06 Setting Nagios test status to operations →Setting Nagios tests critical steps
- 13:21, 23 September 2010 diff hist −2 PROC06 Setting Nagios test status to operations →Requirements to be implemented
- 13:21, 23 September 2010 diff hist −320 PROC06 Setting Nagios test status to operations
- 14:43, 22 September 2010 diff hist +209 WI03 RC and RP OLA violation report followup →Questions/issues
- 16:13, 21 September 2010 diff hist +2 EGI Infrastructure operations oversight →COD offical web pages
- 16:13, 21 September 2010 diff hist −23 EGI Infrastructure operations oversight →COD offical web pages
- 16:10, 21 September 2010 diff hist −1 EGI Infrastructure operations oversight →COD shifters daily duties
- 16:10, 21 September 2010 diff hist +14 EGI Infrastructure operations oversight
- 16:09, 21 September 2010 diff hist −136 EGI Infrastructure operations oversight
- 16:08, 21 September 2010 diff hist −25 EGI Infrastructure operations oversight →COD shifters daily duties
- 16:07, 21 September 2010 diff hist +31 EGI Infrastructure operations oversight →COD shifters daily duties
- 15:50, 21 September 2010 diff hist +38 EGI Infrastructure operations oversight →Internal area
- 15:49, 21 September 2010 diff hist +70 EGI Infrastructure operations oversight →Internal area
- 15:48, 21 September 2010 diff hist +835 PROC06 Setting Nagios test status to operations
- 12:24, 21 September 2010 diff hist +102 EGI Infrastructure operations oversight →Internal area
- 11:26, 21 September 2010 diff hist +1 PROC03 Operations Centre decommission →Revision history
- 11:26, 21 September 2010 diff hist +2 PROC03 Operations Centre decommission →Revision history
- 11:26, 21 September 2010 diff hist +28 PROC03 Operations Centre decommission →Revision history
- 11:25, 21 September 2010 diff hist +1 PROC03 Operations Centre decommission →Known issues
- 11:25, 21 September 2010 diff hist +236 PROC03 Operations Centre decommission
- 11:17, 21 September 2010 diff hist +43 PROC02 Operations Centre creation →Revision history
- 11:16, 21 September 2010 diff hist +6 PROC02 Operations Centre creation →NGI creation process steps
- 10:32, 21 September 2010 diff hist +284 PROC02 Operations Centre creation
- 10:31, 21 September 2010 diff hist −111 EGI Infrastructure operations oversight
- 12:41, 20 September 2010 diff hist +118 EGI Infrastructure operations oversight →COD shifters daily duties
- 12:39, 20 September 2010 diff hist −700 EGI Infrastructure operations oversight →COD shifters daily duties
- 12:37, 20 September 2010 diff hist −2 EGI Infrastructure operations oversight →COD shifters daily duties
- 12:36, 20 September 2010 diff hist +762 EGI Infrastructure operations oversight →COD shifters daily duties
- 12:23, 20 September 2010 diff hist +249 PROC03 Operations Centre decommission →Revision history
- 12:21, 20 September 2010 diff hist +50 PROC03 Operations Centre decommission →EGEE ROC decommission request validation
- 12:19, 20 September 2010 diff hist +6 PROC03 Operations Centre decommission →EGEE ROC prerequisities
- 12:18, 20 September 2010 diff hist +63 PROC03 Operations Centre decommission →EGEE ROC prerequisities
- 11:57, 20 September 2010 diff hist +111 EGI Infrastructure operations oversight
- 15:00, 8 September 2010 diff hist −19 PROC06 Setting Nagios test status to operations →Revision history
- 14:58, 8 September 2010 diff hist +156 PROC06 Setting Nagios test status to operations →Setting Nagios tests critical steps
- 14:56, 8 September 2010 diff hist −2,482 PROC06 Setting Nagios test status to operations
- 16:07, 6 September 2010 diff hist +3,975 PROC06 Setting Nagios test status to operations
- 15:03, 6 September 2010 diff hist +2 PROC06 Setting Nagios test status to operations
- 15:03, 6 September 2010 diff hist +362 N PROC06 Setting Nagios test status to operations Created page with ''''draft''' - wait till the NGI's have had the time to update their Nagios boxes. - send an email to the ROD teams (or NGI) to inform them and ask the if they can verify if th…'
- 15:03, 6 September 2010 diff hist +108 EGI Infrastructure operations oversight →Internal area
- 12:13, 6 September 2010 diff hist +36 WI03 RC and RP OLA violation report followup →Internal procedure for COD
- 11:57, 6 September 2010 diff hist −78 WI03 RC and RP OLA violation report followup →Internal procedure for COD
- 11:54, 6 September 2010 diff hist +343 WI03 RC and RP OLA violation report followup →Internal procedure for COD
- 11:53, 6 September 2010 diff hist +2 WI03 RC and RP OLA violation report followup →Internal procedure for COD
- 11:52, 6 September 2010 diff hist +279 WI03 RC and RP OLA violation report followup →Internal procedure for COD
- 10:59, 1 September 2010 diff hist +10 EGI Infrastructure operations oversight →Internal area
- 10:44, 1 September 2010 diff hist +4 PROC03 Operations Centre decommission →EGEE ROC prerequisities
- 14:45, 31 August 2010 diff hist +12 PROC03 Operations Centre decommission →EGEE ROC decommission process steps
- 14:36, 31 August 2010 diff hist −158 PROC03 Operations Centre decommission →Procedure for the EGEE ROC decommission procedure DRAFT
- 14:36, 31 August 2010 diff hist +164 PROC03 Operations Centre decommission →How to start the decommission process
- 14:34, 31 August 2010 diff hist +5 PROC03 Operations Centre decommission →EGEE ROC prerequisities
- 14:34, 31 August 2010 diff hist −5 PROC03 Operations Centre decommission →EGEE ROC decommission process steps
- 14:33, 31 August 2010 diff hist +520 PROC03 Operations Centre decommission →EGEE ROC decommission process steps
- 13:22, 31 August 2010 diff hist −378 PROC03 Operations Centre decommission →EGEE ROC decommission process steps
- 13:18, 31 August 2010 diff hist +445 PROC03 Operations Centre decommission
- 13:10, 31 August 2010 diff hist +17 PROC03 Operations Centre decommission →EGEE ROC prerequisities
- 13:10, 31 August 2010 diff hist +249 PROC03 Operations Centre decommission
- 13:05, 31 August 2010 diff hist +9 PROC03 Operations Centre decommission →How to start the decommission process
- 13:05, 31 August 2010 diff hist −2 PROC03 Operations Centre decommission →How to start the decommission process
- 13:05, 31 August 2010 diff hist +9 PROC03 Operations Centre decommission →Revision history
- 13:04, 31 August 2010 diff hist +1,070 PROC03 Operations Centre decommission
- 12:44, 31 August 2010 diff hist +99 PROC03 Operations Centre decommission
- 12:36, 31 August 2010 diff hist +352 PROC03 Operations Centre decommission
- 12:02, 31 August 2010 diff hist +1 WI03 RC and RP OLA violation report followup →Site for suspension
- 11:59, 31 August 2010 diff hist +4 WI03 RC and RP OLA violation report followup →How to use ticket generator
- 11:57, 31 August 2010 diff hist +124 WI03 RC and RP OLA violation report followup
- 11:46, 31 August 2010 diff hist +12 WI03 RC and RP OLA violation report followup Undo revision 2555 by Mkrakowi (Talk)
- 11:45, 31 August 2010 diff hist −12 WI03 RC and RP OLA violation report followup →Internal procedure for COD
- 11:44, 31 August 2010 diff hist 0 WI03 RC and RP OLA violation report followup →Site for suspension
- 11:41, 31 August 2010 diff hist 0 File:1.png uploaded a new version of "File:1.png" current
- 11:40, 31 August 2010 diff hist 0 File:2.png uploaded a new version of "File:2.png" current
- 11:40, 31 August 2010 diff hist 0 File:2.png uploaded a new version of "File:2.png"
- 15:13, 30 August 2010 diff hist 0 File:4.png uploaded a new version of "File:4.png" current
- 15:12, 30 August 2010 diff hist 0 N File:4.png
- 15:12, 30 August 2010 diff hist 0 N File:3.png current
- 15:11, 30 August 2010 diff hist 0 N File:2.png
- 15:10, 30 August 2010 diff hist 0 N File:1.png
- 13:59, 30 August 2010 diff hist +8 EGI Infrastructure operations oversight →Internal area
- 13:58, 30 August 2010 diff hist +93 EGI Infrastructure operations oversight →Internal area
- 13:43, 4 August 2010 diff hist +73 PROC03 Operations Centre decommission →EGEE ROC decommission procedure DRAFT
- 11:25, 4 August 2010 diff hist +27 PROC02 Operations Centre creation →NGI creation process steps
- 09:19, 4 August 2010 diff hist +11 PROC03 Operations Centre decommission
- 10:38, 3 August 2010 diff hist +223 PROC03 Operations Centre decommission →EGEE ROC decommission procedure DRAFT
- 10:36, 3 August 2010 diff hist +1,141 PROC03 Operations Centre decommission
- 09:05, 3 August 2010 diff hist +50 N PROC03 Operations Centre decommission Created page with 'https://gus.fzk.de/ws/ticket_info.php?ticket=60602'
- 09:05, 3 August 2010 diff hist +11 EGI Infrastructure operations oversight →Internal area
- 08:57, 3 August 2010 diff hist +79 EGI Infrastructure operations oversight →Internal area
- 11:26, 2 August 2010 diff hist +111 PROC02 Operations Centre creation →New NGI prerequisities
- 10:56, 2 August 2010 diff hist +181 WI03 RC and RP OLA violation report followup →Request for explanation
- 10:34, 30 July 2010 diff hist +44 PROC02 Operations Centre creation
- 12:13, 29 July 2010 diff hist +8 EGI Infrastructure operations oversight →Internal area
- 12:05, 29 July 2010 diff hist +38 EGI Infrastructure operations oversight →Internal area
- 08:48, 27 July 2010 diff hist −58 PROC02 Operations Centre creation
- 08:48, 27 July 2010 diff hist −11 PROC02 Operations Centre creation
- 09:37, 26 July 2010 diff hist +485 WI03 RC and RP OLA violation report followup →How to use ticket generator
- 09:29, 26 July 2010 diff hist +727 WI03 RC and RP OLA violation report followup →How to use ticket generator
- 14:18, 23 July 2010 diff hist +40 WI03 RC and RP OLA violation report followup →Internal procedure for COD
- 14:16, 23 July 2010 diff hist +2 WI03 RC and RP OLA violation report followup
- 14:13, 23 July 2010 diff hist +1,037 WI03 RC and RP OLA violation report followup →Internal procedure for COD
- 14:07, 23 July 2010 diff hist 0 WI03 RC and RP OLA violation report followup →Request for explanation
- 13:56, 23 July 2010 diff hist 0 WI03 RC and RP OLA violation report followup →How to use ticket genarator
- 13:10, 23 July 2010 diff hist −4 WI03 RC and RP OLA violation report followup
- 12:41, 23 July 2010 diff hist +46 WI03 RC and RP OLA violation report followup
- 12:36, 23 July 2010 diff hist −5 WI03 RC and RP OLA violation report followup →Site for suspension
- 12:32, 23 July 2010 diff hist +12 WI03 RC and RP OLA violation report followup
- 12:31, 23 July 2010 diff hist +5 WI03 RC and RP OLA violation report followup
- 12:31, 23 July 2010 diff hist +10 WI03 RC and RP OLA violation report followup
- 12:30, 23 July 2010 diff hist −25 WI03 RC and RP OLA violation report followup
- 12:29, 23 July 2010 diff hist +588 WI03 RC and RP OLA violation report followup
- 12:24, 23 July 2010 diff hist +782 WI03 RC and RP OLA violation report followup
- 11:51, 23 July 2010 diff hist 0 WI03 RC and RP OLA violation report followup
- 11:50, 23 July 2010 diff hist +8 WI03 RC and RP OLA violation report followup
- 11:50, 23 July 2010 diff hist −3 WI03 RC and RP OLA violation report followup
- 11:49, 23 July 2010 diff hist +51 WI03 RC and RP OLA violation report followup
- 11:46, 23 July 2010 diff hist +682 WI03 RC and RP OLA violation report followup
- 14:46, 15 July 2010 diff hist +3 PROC02 Operations Centre creation →NGI creation process steps
- 14:45, 15 July 2010 diff hist −11 PROC02 Operations Centre creation →NGI creation process steps
- 14:45, 15 July 2010 diff hist 0 PROC02 Operations Centre creation →NGI creation process steps
- 14:44, 15 July 2010 diff hist 0 PROC02 Operations Centre creation →NGI creation process steps
- 14:41, 15 July 2010 diff hist +32 PROC02 Operations Centre creation
- 13:45, 14 July 2010 diff hist +9 PROC02 Operations Centre creation →How to start the integration process for an NGI (or NGI group)
- 13:44, 14 July 2010 diff hist +1 PROC02 Operations Centre creation →How to start the integration process for an NGI (or NGI group)
- 13:42, 14 July 2010 diff hist −121 PROC02 Operations Centre creation →New NGI prerequisities
- 13:33, 14 July 2010 diff hist +109 PROC02 Operations Centre creation →Revision history
- 13:27, 14 July 2010 diff hist +22 PROC02 Operations Centre creation →NGI creation process steps
- 11:15, 14 July 2010 diff hist +1 EGI Infrastructure operations oversight →= COD shifters daily duties
- 11:15, 14 July 2010 diff hist −1 EGI Infrastructure operations oversight →COD shifters daily duties
- 11:14, 14 July 2010 diff hist +4 EGI Infrastructure operations oversight →COD shifters daily duties
- 11:02, 14 July 2010 diff hist −2 EGI Infrastructure operations oversight →COD shifters daily duties
- 11:01, 14 July 2010 diff hist −12 EGI Infrastructure operations oversight →COD shifters daily duties
- 11:00, 14 July 2010 diff hist +61 EGI Infrastructure operations oversight →COD shifters daily duties
- 10:55, 14 July 2010 diff hist −105 EGI Infrastructure operations oversight
- 10:52, 14 July 2010 diff hist +5 EGI Infrastructure operations oversight
- 10:51, 14 July 2010 diff hist +1 EGI Infrastructure operations oversight
- 10:51, 14 July 2010 diff hist −15 EGI Infrastructure operations oversight
- 10:50, 14 July 2010 diff hist −10 EGI Infrastructure operations oversight
- 10:48, 14 July 2010 diff hist +73 EGI Infrastructure operations oversight