Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "NGI International Task Review MS109 Poland"

From EGIWiki
Jump to navigation Jump to search
Line 25: Line 25:
| OS_HS_RequirementsGathering_HowToImprove | how to improve  
| OS_HS_RequirementsGathering_HowToImprove | how to improve  


| OS_HS_Coordination_Assessment = write here
| OS_HS_Coordination_Assessment = Polish NGI takes advantage of PL-Grid project running in parallel where all operations issues are announced and discussed if necessary. Issues and problems requiring more timely responses are coordinated by the Regional Technical Support team via instant communication and other means.
| OS_HS_Coordination_Score = 0-5
| OS_HS_Coordination_Score = 3
| OS_HS_Coordination_HowToImprove = write here
| OS_HS_Coordination_HowToImprove = Sometimes it happens that no single reply is given. Some more attention to the reason for "no feedback" cases could be paid.
 
| OS_HS_Security_Assessment = write here
| OS_HS_Security_Assessment = write here
| OS_HS_Security_Score = 0-5
| OS_HS_Security_Score = 0-5

Revision as of 16:00, 1 March 2011



This page contains the assessment of the NGI International Task at year 1 of the EGI-InSPIRE project (one page per NGI). The NGI representatives are required to fill the tables according to the required information. The content will be integral part of the EGI-InSPIRE milestone MS109 "NGI International Task Review"

  • Main page with instructions
  • In order to edit this page, you need to log in with your EGI SSO account and click 'edit' on the tab (top of this page)

User Services

Human Services (Table 1)

Table 1: NGI Assessment: User Services >> Human Services
EGI-InSPIRE EGI_DS Name Assessment Score How to Improve
NA3.3N U-N-3 U-N-13 Requirements Gathering write here 0-5 write here
NA3.3N U-N-14 U-N-15 Application Database write here 0-5 write here
NA3.3N U-N-16 U-N-17 Training write here 0-5 write here
NA3.3N U-N-12 U-N-18 U-N-19 Consultancy write here 0-5 write here

Operations Services

Human Services (Table 2)

Table 2: NGI Assessment: Operations Services >> Human Services
EGI-InSPIRE EGI_DS Name Assessment Score How to Improve
SA1.4N O-N-9 Requirements Gathering your assessment here 0-5 how to improve
SA1.1N O-N-9 Operations Coordination Polish NGI takes advantage of PL-Grid project running in parallel where all operations issues are announced and discussed if necessary. Issues and problems requiring more timely responses are coordinated by the Regional Technical Support team via instant communication and other means. 3 Sometimes it happens that no single reply is given. Some more attention to the reason for "no feedback" cases could be paid.
SA1.2N O-N-9 Security write here 0-5 write here

Infrastructure Services (Table 3)

Table 3: NGI Assessment: Operations Services >> Infrastructure Services
EGI-InSPIRE EGI_DS Name Assessment Score How to Improve
SA1.3N O-N-9 Software Rollout The activity makes sure the sites are following the software release update cycles. All NGI_PL sites had no issues related to installed gLite version. 3 write here
SA1.4N O-N-3 Monitoring The activity is well organized as it joins together stability and flexibility. Two monitoring boxes are kept within NGI_PL - one for monitoring of OPS VO services and the other one for monitoring vo.plgrid.pl services which is the VO used by Polish scientists. The set vo.plgrid.pl probes was extended to improve WMS monitoring as well as to integrate UNICORE probes. The extra tests are shown on Operations Dashboard for operators. Both machines are regularly updated as requested by the project and we observed no significant interruptions in their work. 5 write here
SA1.5N O-N-2 Accounting The activity was busy with migration from R-GMA to Active MQ APEL. All Polish sites finished migration well in advance before the deadline. Polish sites are regularily checked for completeness of accounting data published to central repository and republication follows if necessary. 4 write here
SA1.4N O-N-1 O-N-4 Configuration Repository and Operations Portal The activity analysed possibility to install configuration repository in NGI_PL but it was found out that there is no added value for that. The reason is that there is no synchronisation of data between central and regional instances implemented. Moreover extending the database schema for new attributes seems problematic as it requires modification of web interface, access rights management based on user roles and changing the database schema. There is no guarantee that locally made changes will survive the software update cycle. 4 write here
SA1.6N SA1.7N O-N-6 O-N-7 Helpdesk The activity allows smooth ticket flow between EGI and NGI_PL. The ticket exchange interface between national and global systems as well the regional tool works without any problems. Procedures and teams for handling tickets proved to be well crafted as no tickets stay too long in the system. 4 We do not identify areas requiring improvements here.
SA1.8N O-N-5 O-N-8 Core Services NGI_PL core services are established in enough amount and at enough availability level. However, there were some issues found about WMSes which were reported as unstable. Suitable monitoring was put in place to avoid this problem. gLite UI machines are considered as core services as well. NGI_PL works towards establishing monitoring of these. 5 We do not identify areas requiring improvements here.

Other (Table 4)

Table 4: NGI Assessment: Other
EGI-InSPIRE EGI_DS Name Assessment Score How to Improve
NA2.3N Policy Development write here 0-5 write here
NA2.2N E-N-2 Dissemination write here 0-5 write here