Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "GOCDB/Release4/Development/conditionalCertificationStatusRules"

From EGIWiki
Jump to navigation Jump to search
Line 9: Line 9:
===Definitions===
===Definitions===
====Site Target Infrastructure (a.k.a Production status)====
====Site Target Infrastructure (a.k.a Production status)====
The site’s [Target Infrastructure] specifies the infrastructure that the site delivers to.  Values include:  
The site’s Target Infrastructure specifies the infrastructure that the site delivers to.  Values include:  
* Test  (e.g. a test broker network)
* Test  (e.g. a test broker network)
* Production   
* Production   
Line 15: Line 15:
* <strike>SC</strike> (Obsolete)
* <strike>SC</strike> (Obsolete)
(PPS and SC are due to be removed - the sites with these current statuses have been informed)
(PPS and SC are due to be removed - the sites with these current statuses have been informed)
====Site Certification Status====
The site’s Certification Status reflects the site’s progression through the SA1 site certification procedure. This procedure should only apply to the ‘Production’ Target Infrastructure (details below). Values include:
* Candidate  (temporary state, max of 2 months)
* Uncertified
* Certified  (long-term state)
* Suspended  (temporary state, max of 4 months)
* Closed  (indefinite state)
Note, the intended lifetime of the ‘Uncertified’ state is not clearly defined. If this state should be regarded as temporary, many sites defined as ‘Production/Uncertified’ should use scoping as an alternative. However, before politically enforcing this, scoping should first be fully supported by ATP/MyEGI/monitoring.  Note, state lifetimes are not technically enforced by GOCDB (this could be added as a new RT requirement).

Revision as of 18:24, 14 August 2012

<< Back to GOCDB/Documentation_Index
<< Back to GOCDB/Release4/Development

Overview

This involves removal of some obsolete site Production Status/Infrastructure values and conditional enforcement of site certification status transition rules depending on the Production Infrastructure.

  • The following page and the described status transition rules do not apply to non-EGI (local) scoped sites and services.
  • The site ‘Production Status’ field is poorly named in the GUI. ‘Target Infrastructure’ is far more appropriate and is used below in place of ‘Production Status.’

Definitions

Site Target Infrastructure (a.k.a Production status)

The site’s Target Infrastructure specifies the infrastructure that the site delivers to. Values include:

  • Test (e.g. a test broker network)
  • Production
  • PPS (Obsolete)
  • SC (Obsolete)

(PPS and SC are due to be removed - the sites with these current statuses have been informed)

Site Certification Status

The site’s Certification Status reflects the site’s progression through the SA1 site certification procedure. This procedure should only apply to the ‘Production’ Target Infrastructure (details below). Values include:

  • Candidate (temporary state, max of 2 months)
  • Uncertified
  • Certified (long-term state)
  • Suspended (temporary state, max of 4 months)
  • Closed (indefinite state)

Note, the intended lifetime of the ‘Uncertified’ state is not clearly defined. If this state should be regarded as temporary, many sites defined as ‘Production/Uncertified’ should use scoping as an alternative. However, before politically enforcing this, scoping should first be fully supported by ATP/MyEGI/monitoring. Note, state lifetimes are not technically enforced by GOCDB (this could be added as a new RT requirement).