Difference between revisions of "EGI-InSPIRE:Switzerland-QR6"
Jump to navigation
Jump to search
Line 75: | Line 75: | ||
!scope="col"|Publication title||Journal / Proceedings title||align="left" |Journal references<br> ''Volume number<br> Issue<br><br>Pages from - to''||align="left" |Authors ''<br>1.<br>2.<br>3.<br>Et al?'' | !scope="col"|Publication title||Journal / Proceedings title||align="left" |Journal references<br> ''Volume number<br> Issue<br><br>Pages from - to''||align="left" |Authors ''<br>1.<br>2.<br>3.<br>Et al?'' | ||
|- | |- | ||
| | |Measurement of B-Bbar Angular Correlations at √s 7 TeV with the CMS Experiment. | ||
|| | ||CMS-CR-2011-169 | ||
|| | ||http://inspirehep.net/record/940807 | ||
|| | ||arXiv:1110.4751 | ||
|} | |} | ||
Revision as of 14:49, 25 October 2011
Quarterly Report Number | NGI Name | Partner Name | Author |
---|---|---|---|
1. MEETINGS AND DISSEMINATION
1.1. CONFERENCES/WORKSHOPS ORGANISED
Date | Location | Title | Participants | Outcome (Short report & Indico URL) |
---|---|---|---|---|
1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED
ETHZ only attended conferences, which are related to the physics exploitation, which actually relies nearly exclusively on the proper operation of the grid.
Date | Location | Title | Participants | Outcome (Short report & Indico URL) |
---|---|---|---|---|
1.3. PUBLICATIONS
Publication title | Journal / Proceedings title | Journal references Volume number Issue Pages from - to |
Authors 1. 2. 3. Et al? |
---|---|---|---|
Measurement of B-Bbar Angular Correlations at √s 7 TeV with the CMS Experiment. | CMS-CR-2011-169 | http://inspirehep.net/record/940807 | arXiv:1110.4751 |
2. ACTIVITY REPORT
2.1. Progress Summary
2.1.1. ETHZ
- Tier-2 operated according to the MoU Switzerland-- WLCG.
- Delivered the pledged resources to WLCG;
- Planning of upgrades.
2.2. Main Achievements
2.2.1 ETHZ
Overall for ETHZ (representing CHIPP) :
The main activity was concentrated on
- the routine operation of the Swiss Tier-2 being part of WLCG; delivering the resources as pledged to WLCG.
- Performing necessary upgrades of the Tier-2 for 2011. Planning upgrades for 2012 - 2014.
- Operations and upgrade planning for the Swiss Tier-3s (Geneva, Bern, EPFL, UZH, ETHZ).
- Overall securing of personnell and funding for the Swiss Grid operation.
2.3. Issues and mitigation
Issue Description | Mitigation Description |
---|---|
Update CREAM CE to EMI 1 Update 4 | |
waiting since 2011-10-05 11:12 orphaned ticket? | |
waiting for answer from Condor team | |
waiting for answer from torque developers | |
waiting for https://cern.service-now.com/nav_to.do?uri=incident.do?sysparm_query=number=INC072979 | |
waiting for https://savannah.cern.ch/bugs/?84374 | |
waiting |